In the study, work and even life, it is not guaranteed that you will encounter some unexpected events or accidents, in order to minimize the harm, usually need to pre-prepare a complete emergency plan, the following to share with you about the typhoon storm emergency plan selected sample, welcome to read!
Emergency plan against typhoon and rainfall Chapter 1
With the arrival of the rainy season, according to the Liuyang City Safety Supervision Administration on the safety of non-coal mine enterprises to do a good job in the current period of safety `notice, flood prevention and flood control work is imminent. My mine in order to safe flood, the development of flood control and flood emergency plan, set up a flood control and flood control leading group, and equipped with sufficient supplies, equipment and other flood control supplies, to ensure that the mine safely and smoothly through the flood season. Its emergency plan is as follows:
First, the principle of emergency:
I mine adhere to the prevention-oriented, combined with prevention and robbery, unified command, unified scheduling, the principle of obeying the overall situation, carry forward the spirit of unity against floods, in the mine under the unified guidance of the leading group of flood control, active cooperation, unity, to ensure that the mine is safe during the flood.
Second, the work plan:
Develop a flood prevention and flood control safety management system, and to do all members of the flood awareness, and the system will be implemented to the various teams, personnel. Timely flood safety education and flood control and flood control safety responsibility education. Frequently check the preparation of flood control and flood prevention materials and the operation of flood control equipment to ensure emergency response when floods come. Strengthen the logistical support and service work to ensure that personnel, materials, equipment and site work all safe.
Third, the establishment of flood control front command, clear responsibilities:
General Director:
Deputy General Director:
Members:
General Director: the mine-wide flood control is responsible for flood control, unified command of the flood control work.
Deputy commander-in-chief: responsible for the implementation of the pre-emptive program, mobilization of flood control personnel and required materials. Timely preparation of rescue equipment, according to the order of the commander-in-chief quickly run to the designated location, and is responsible for relief personnel accommodation and other matters.
Members: the implementation of the instructions of the commander-in-chief, responsible for the supply and reserves of flood control materials, equipment deployment and transportation and rescue work of all related matters. Medical group: Nanyue Village Health Center staff, responsible for the treatment of personnel injured in the rescue process.
Fourth, the emergency program:
(1), the establishment of the mine director as the command of the flood control front command, division of labor, clear responsibility, to ensure that the responsibility to the person, to strengthen the scheduling, to do all the actions of the command, all the actions to listen to the command, the flood season is coming, the arrangement of special on-site duty, and set up the flood control and flood rescue team.
(2), do a good job of material supply plan, arrange for the preparation of flood prevention and flood control materials, before the flood season comes, prepare enough woven bags, sand, pumps, shovels, raincoats and other flood control materials.
(3), put into the rescue site of the loader, generator Yew strengthen maintenance and repair, to ensure that the flood season comes when the equipment can operate normally, special period can give full play to the emergency role of the equipment.
(4), the ground by the flood threatened materials and equipment, by the mine commander-in-chief of the unified arrangements, as far as possible to carry to the high safety zone.
(5), the commander-in-chief according to the water level changes, the organization of flood control team members as far as possible to dredge the flood channels, the mine's property losses to a minimum.
(6), the custodian group by Xie Xiyuan is responsible for, in accordance with the requirements and instructions of the command, the release of tools, materials and supplies needed to ensure that the flood rescue work can be carried out smoothly.
(7), the medical group by the Nanyue village health center medical staff. Medical personnel in the rescue period, to be personally on the scene for the rescue process of the injured personnel for timely treatment, for the more serious injuries, to be sent to the hospital in time for treatment.
(8), the car group by Xie Haibo is responsible for the rescue period to have enough cars to transport the injured and medical personnel.
(9), communication group by Xiong Shanbao is responsible for the accident is responsible for convening the flood rescue personnel and contact the relevant units at higher levels, and timely report to the commander-in-chief of the spirit of the higher and instructions.
(10), if the accident is too big, the unit can not handle the situation, should immediately notify the mine rescue team to request rescue. Note: This emergency plan can only be activated and implemented after a flood accident.
V. Emergency equipment, materials, the number of preparations and storage location:
Plant storage room
Typhoon storm emergency plan Part 2
In order to comprehensively implement the "safety first, always be prepared for the main preventive, all-out rescue According to the National Defense Council, "local people's governments at all levels of the executive head of flood control and drought relief work responsibilities" and other documents, the development of this plan.
When there is a sudden local rainstorm disaster led by the county party committee, the county government's main leaders, the organization of the relevant departments to study the situation, according to the risk, the disaster quickly made a decision, the county Flood Control Command issued an order to start the plan, where the township government specific implementation.
First, the flood control headquarters office duties
In the city, county flood control headquarters and the county party committee, under the leadership of the county government, at any time to grasp the important weather information, rain, flood warning in a timely manner, conveying the superior rescue and relief instructions, orders, etc., and actively organize and coordinate the various departments and units of the rescue and relief operations, collection, collation and reporting of the rain, floods, dangers, disasters, and disaster and rescue relief The situation.
Second, the township people's government, the county flood control headquarters of the member units of the rescue and relief responsibilities
Authorities appeared in heavy rainfall, resulting in farmland, roads, highways, drinking water, power facilities, communication facilities were washed away, the collapse of houses or the southern mountainous areas of the occurrence of flash floods, landslides, landslides after the disaster, the township government, the county flood control headquarters of the members of the unit to take active action to cooperate, cooperate, and cooperate in accordance with the respective departments. Collaboration, in accordance with their respective responsibilities, rescue and relief.
1, the township government
Flood control the first person responsible for the township (township) mayor, the village director must be the first time to the scene, command rescue and relief, dealing with emergencies, investigation and understanding of the disaster situation, the rapid organization of the township (township), the village cadres, the flood control equipment for the drainage of floods in addition to the risk of emergency relocation of the masses, the proper placement of homeless people, organizing the masses of self-help, rescue, and as soon as possible, restore the Affected people's production and life, and quickly to the county government, the county flood control headquarters office, the Civil Affairs Bureau to report the disaster.
2, the county planning and construction and housing security bureau
quickly sent to the scene of the disaster to deal with the danger, to help the masses evacuated out of the danger zone, the use of municipal engineering equipment, dredging drainpipes, flood channels, to ensure that the drainage, drainage pipe network unimpeded. And the disaster quickly reported to the county government, the county flood control headquarters office.
3, Bureau of Land and Resources
Rapidly sent an emergency investigation team to the disaster area for geological disaster investigation, the organization of the township emergency transfer of threatened people to the safety zone, and in the specified time limit to the county government, the county flood control headquarters office to report the disaster.
4, the relevant departments
The agricultural sector should be deployed to the affected area of crops, types and extent of damage to carry out detailed investigation and verification, and to assist in rescue and relief.
The civil affairs department should check the collapsed houses and dangerous houses village by village, assist the township to do a good job of relocating, arrange for the victims and prepare enough relief tents and necessary supplies to ensure that the victims have food, clothes to wear, clean water to drink, and have a place to live.
Transportation departments should promptly call for machinery to repair the road, as soon as possible to restore the road.
The water department should actively do the whole process of rescue technical guidance.
The food department should actively do a good job of supplying food and oil to the victims.
The financial sector should actively raise and allocate funds for disaster relief.
The power sector should be sent to repair water-damaged power lines in time.
The People's Armed Forces Department should mobilize the militia reserves to support the local township government rescue and relief.
The public security department should do a good job of rescue and relief of social security maintenance, to prevent the destruction of bad people.
Supply and marketing, commercial and material departments should be ready to rescue and relief materials and tools, waiting for orders.
Health departments should actively do a good job in the affected areas of health epidemic prevention and medical care.
Meteorological departments to encrypt observation and forecast of heavy rainfall weather, timely release of rain information.
The radio and television departments should publicize important weather information and rescue and relief instructions to the community through television.
The development and reform departments should assist the water conservancy department to do a good job of water damage repair plan arrangement and report the project for work.
The county telecommunication bureau, the county mobile company, the county Unicom to ensure smooth telephone communication and smooth network.
The education sector should quickly evacuate the teachers and students in the dangerous leakage of school buildings.
Tourism department to quickly evacuate or evacuate tourists in the danger zone.
The economic and trade departments should quickly evacuate the factory and mining units and property threatened by the flood.
Forestry departments to do a good job of forest water damage statistics, and actively assist the township government rescue and relief.
Third, the local rainstorm rescue and relief organization discipline
When there is sudden heavy rainfall, the local government (township, township), village leaders must be the first time to the scene, leaning forward to direct, decisive organization of rescue and relief. Flood control administrative responsibility shall not be unauthorized to leave the flood control workstation, we must strictly implement the flood control 24 hours with duty system, timely transmission, release of rain, water, risk, disaster information, late reporting, concealment, omission, misreporting of the disaster, resulting in serious failures in flood control and rescue work; on the non-execution of the plan, do not fulfill their respective responsibilities and flood control and rescue instructions, resulting in casualties or major economic losses, will be in accordance with the "Provincial Flood Control and Safety Accident Administrative Responsibility Measures" of the "Provincial Flood Control and Safety Accident Administrative Responsibility Measures".
Emergency plan against typhoon and rainstorms Part 3
Due to the school's low-lying terrain, coupled with the poor drainage system of the Deep River Road, every heavy rainstorm, the campus is seriously waterlogged (the water depth of up to 30cm-50cm). In order to timely and properly dispose of the campus water events in heavy rainstorms, to protect the lives of teachers and students and property safety, and to maintain the normal teaching, work and life order of the school, especially the development of this plan.
First, the scope of application
rainstorm weather, campus water, affecting the normal teaching and learning work and life order.
Second, the organization
The school set up a stormy weather campus water events emergency management leading group, organized by the principal of the unified command, unified command, coordination of operations, *** with the completion of the emergency work tasks.
Leader:
Deputy Leader:
Members:
Class teachers on duty that day
The leading group set up an office, ___ concurrently as director of the office.
Third, emergency measures
(a) the general situation (stormy weather can also maintain the order of education and teaching work and life)
1, the day of the teacher on duty to adhere to their posts, strengthen the management of the maintenance of order of students' activities, the leadership on duty to strengthen the patrols, and timely handling of incidental events.
2, after school hours, the leadership team members are all in place, effective organization of students after school, to maintain the order of students after school, to ensure the safety of students after school.
3, the student Chinese food from the cafeteria to the floor distribution, students playing meals to their classrooms to eat. Each class teacher to assist the floor teachers on duty to organize the students to play meals; to assist the cafeteria practitioners to send meals to all floors.
(ii) special circumstances (stormy weather can not maintain the order of work and life in education and learning)
1, in the first time, to the higher authorities to report, please ask students to leave.
2, get the approval of the vacation, notify the class teacher to contact the students' parents by phone, each student will be handed over to the parents to pick up.
3, all members of the leadership team to the scene, maintain the order of school release, orderly organization of students on vacation, do a good job. Floor squatting leaders in place: first floor __; second floor __; third floor __.
4, after the rain cleared, the organization cleaned up campus health, campus sterilization work.
Fourth, accountability
In the emergency process, one of the following situations, the relevant personnel depending on the circumstances of their responsibility, resulting in a security incident, by the judicial organs to pursue criminal responsibility.
1, disobedience to the command of the leading group, and delayed implementation of the requirements.
2, not to the scene to fulfill their duties.
3, negligence, dereliction of duty, malfeasance, and mistakes in the work.
Typhoon rainstorm emergency plan chapter 4
In order to ensure that the beneficiation plant in the occurrence of destructive rainstorms, the various emergency work can be efficient, orderly, minimize casualties and property losses, according to the State Council, "the occurrence of destructive rainstorms emergency regulations," combined with the actuality of the work of my beneficiation plant, the special preparation of this plan
p> First, the composition of the emergency response agencies p>
1, the leading group p>
Selection of anti-rainstorm disaster work at the higher level of anti-rainstorm disaster reduction under the leadership of the leading group to organize and implement. Selection of plant anti-rainstorm disaster reduction leading group by the director as the leader, the deputy director and the section chiefs for the group members, plant scheduling for the command.
2, the main responsibilities
(1) strengthen the leadership, sound organization, strengthen the work responsibilities, strengthen the destructive rainstorms and storm prevention and mitigation of familiarity with and understanding of the work, improve the development of the various contingency plans and the implementation of the measures.
(2) make full use of various channels to carry out publicity and education on knowledge of earthquake disasters, organize and guide the popularization and education of the whole length of the knowledge of earthquake prevention and resistance to earthquakes, and widely carry out training on self-rescue and mutual rescue in earthquake disasters, and constantly improve the awareness and basic skills of the majority of employees in earthquake prevention and resistance to earthquakes.
(3) seriously improve the material security, strictly in accordance with the requirements of the plan to actively prepare for the implementation of food and water, anti-freezing rain, rescue equipment and other materials, and strengthen the management, so that it is always in a good state of readiness.
(4) after the occurrence of destructive rainstorms, take all necessary means to organize all aspects of the force to carry out comprehensive disaster mitigation work to minimize the losses caused by the disaster.
(5) Dispatch all the positive factors, quickly restore the order of production, and comprehensively safeguard the stability of production and staff life.
Second, the earthquake emergency action
1, received from the higher rainstorms, rain advance (alarm) report, the leading group immediately entered the state of emergency, according to the law, the release of relevant news and alerts, fully responsible for the work of all anti-seismic. All relevant organizations are ready to implement rain mitigation tasks.
2, the organization of the relevant personnel of the building belonging to a comprehensive inspection, blocking, closing the dangerous places, stop the large-scale activities.
3, to strengthen the management of flammable and explosive substances, toxic and hazardous chemicals, and strengthen the large boilers, power supply and transmission engine room hangar important equipment, place of protection, to ensure that earthquake mitigation is carried out smoothly.
4, increase the majority of employees publicity and education, and do a good job of stabilizing the thinking of employees.
5, to strengthen all kinds of duty duty, to maintain smooth communication, timely grasp of the situation at the grassroots level, make every effort to maintain the plant production and life order.
6, according to the plan to implement the material preparation.
Third, after the earthquake emergency action raw
1, regardless of whether there is a forecast, the alarm, in the scope of the region or neighboring areas after the occurrence of destructive rainstorms, the leading group immediately went to the local command post, the rescue and relief teams must be in the quake within an hour of the unit assembled on standby
2, the leading group of the higher level of unified organization and command, and quickly organized the selection of the plant rescue and relief
(1) quickly issued an emergency alarm (continuous rapid ringing and shouting), the organization is still stranded in a variety of buildings all the people to evacuate: all sections of the staff in the section chief deputy section chief of the organization into the rain place.
(2) quickly shut down, cut off the bookstore (except emergency lighting system), to prevent the storm after breeding other disasters.
(3) quickly carry out and rescue personnel as the main content of the scene rescue work, timely transfer of injured people and sent to the annex rescue station rescue.
(4) Strengthen the protection of important facilities, important items.
3, and actively do a good job of ideological propaganda and education of the majority of employees, to eliminate panic, stabilize people's hearts, quickly restore normal order, and make every effort to maintain social security and stability.
4, quickly understand and grasp the situation of the plant disaster, timely summary reported to the company office.
Fourth, other
1. After entering the emergency state of rainstorm, the plant command will be issued through various ways of various orders, instructions, earthquake mitigation leading group will be by telephone, oral and other forms of communication of various orders, instructions.
2. In the earthquake mitigation emergency action, we should closely cooperate, obey the command, to ensure the smooth flow of orders and the implementation of the work.
Emergency plan against typhoons and rainstorms Part 5
In order to further do a good job in the hot season, heavy rainfall, rain and snow and other natural disasters emergency response, to prevent to the elderly in the home of the special needs of the elderly and the staff of the life and property of the major losses, the development of this emergency plan.
I. Emergency organization
1, extreme weather emergency working group
Group leader: __
Deputy leader: __
Members: the head of each team and team members Responsibilities:
(1) Do a good job of daily inspection, the implementation of the responsibility system of production safety, and to guard against the impact of extreme weather (high temperature, heavy rainfall, rain and snow). the impact of extreme weather (high temperature, heavy rainfall, rain and snow).
(2) In the event of extreme weather (high temperature, heavy rainfall, rain and snow) leading to large-scale power outages and other accidents, do the relevant emergency work in a timely manner and restore power supply as soon as possible.
(3) According to the impact of extreme weather (high temperature, heavy rainfall, rain and snow), decide whether to start the emergency plan.
(4) Report the disaster situation to the superior in a timely manner and take vigorous measures to actively respond.
(5) Request external support when necessary.
(6) All members should be under the unified command of the team leader, each in their own way, each responsible for their own responsibilities, and cooperate to do a good job of extreme weather preparedness.
2, extreme weather emergency rescue team
Captain: __
Team members: __
(1) Usually strengthen the power distribution room, fire system, circuit system, water and electricity room safety inspection.
(2) In the event of extreme weather (high temperature, heavy rainfall, rain and snow) at the same time triggering a disaster, the organization of personnel to implement rescue operations.
(3) Report the consequences of extreme weather (high temperature, heavy rainfall, rain and snow) to the Natural Disaster Response Team in a timely manner.
(4) Summarize the work experience of emergency response afterwards.
(5) Once the extreme weather (high temperature, heavy rainfall, rain and snow) in time to organize the elderly in the home to move to a safe place, to ensure the safety of the elderly in the home.
Second, the emergency procedures
1, the home emergency procedures
(1) Once the extreme weather (high temperature, heavy rainfall, rain and snow), should quickly take appropriate emergency measures.
(2) timely report to the head of the Natural Disasters Emergency Response Working Group (night notification of the general lead staff) to report on natural disasters (high temperatures, heavy rainfall, rain and snow) caused by specific disasters (such as lightning strikes and fires, lightning strikes and blackouts, lightning strikes caused by equipment failures, flooding, etc.) situation.
(3) such as during normal working hours, in the case of time permitting, should be issued by the Office by telephone and other forms of notification to the departments to actively organize the response, try to avoid unsafe events.
(4) If the time is urgent, it should be immediately reported to the head of the Natural Disasters Emergency Response Working Group (night notification of the overall lead staff), explaining the details of the situation, send a notice to the departments, timely arrangements for the care team to properly arrange for the elderly to do a good job of sheltering, such as in the case of strong thunderstorms, the shift should be reminded of the power supply to cut off power-using equipment to prevent damage to the equipment from lightning strikes.
(5) If extreme weather triggers flooding, personnel should be immediately organized to fight the flood.
2, each shift emergency procedures
(1) each shift received a natural disaster (high temperature, heavy rainfall, rain and snow) notification, it should be permitted to cut off the power supply of all electrical equipment first, to be put into use after the weather returns to normal.
(2) After receiving the notice of natural disasters (high temperature, heavy rainfall, rain and snow), you should immediately make preparations for fire prevention, flood control, and power outage prevention.
(3) the sudden occurrence of natural disasters (high temperature, heavy rainfall, rain and snow) triggered by power outages, you should immediately notify all shifts to turn on the emergency lights lighting, timely activation of the backup power supply, and timely notification of the electrician or duty personnel to actively cooperate with the disposal.
(4) to strengthen the inspection of the elderly room, to appease the residents, while paying attention to fire, flood prevention, prevention of electric shock.
Third, safeguard measures
1, the Office to strengthen the home security hidden parts of the self-correction work, found that the problem is immediately resolved.
2, the security officer to implement a 24-hour duty system to ensure that 24 hours on standby.
3, the service room is routinely equipped with emergency lights, torches and other lighting supplies, regular checks, to maintain a perfect state.
4, the infirmary to strengthen the daily management, emergency calls to keep open, equipped with enough medicines.
5, the office should be organized to carry out extreme weather (high temperature, heavy rainfall, rain and snow) emergency response drills, through the drill, so that everyone is familiar with the extreme weather (high temperature, heavy rainfall, rain and snow) emergency response procedures, to ensure that all the people in the home of the life and property safety.
Selected Sample Emergency Response Plan for Typhoon Storms Related articles :
★ 2020 Flood Control and Disaster Relief Learning Experience Sample Summarized 5
★ Flood Control and Disaster Relief Work Afterthought Experience Selected 5
★ Study of Flood Relief Advanced Experience Experience Sample 5 2020
★ School emergency plan against typhoons
★ May Day Labor Day activity planning program latest version of 7
★ Safety Production Month activity summary sample selection
★ 2020 Coordination of flood control and disaster relief work of the important instructions of the insights of the ten
★ 2022 typhoon storm emergency plan selection
★ 2021 Flood control and emergency response Work summary sample selected ten
★ Electricity safety activities summarized 3