As the society moves forward step by step, more and more people will go to use the responsibility letter, and signing the responsibility letter will help us to fulfill our duties better. So do you really know how to make a responsibility letter? The following is my renovation project for you to organize a letter of responsibility, welcome to learn and reference, I hope to help you.

Renovation project responsibility letter 1

Party A: Dingxi Friendship Trade City

Party B: ______________________

This project is stationed in the Dingxi Friendship Trade City ___ layer ____ unit ___ No. ___, the renovation project undertaken by Party B, the project is planned to be _____ in _____ The project is scheduled to start on ____, and be completed and delivered on ____, _____.

In order to strengthen the construction site safety. According to the "Chinese People's *** and the State Fire Protection Law", "enterprises, institutions, fire safety management regulations", the construction unit must sign a fire safety responsibility and bear the following responsibilities:

I. Party B in the project design, material selection, construction programs, etc., must comply with the fire prevention regulations and requirements, and will be the construction drawings, programs, construction approval form, fire prevention measures reported to Party A for review.

Second, Party B in at least 30 days before the commencement of construction, with Party A's official seal of the full set of declaration procedures to the Fire Department to declare, to be approved and obtain the approval of the fire department approved the relevant documents before construction.

Third, Party B shall strictly implement the construction plan approved by the relevant departments, and shall not change without authorization.

Fourth, (1) Party B's construction site fire protection facilities change, change, stop the water must be applied to Party A, the study agreed to be carried out only after the sprinkler and fire hydrant system during the suspension of water caused by the responsibility and consequences of the economic losses have to be borne by Party B.

(2) Party B will be the first to apply to the fire department for approval of the relevant documents, and will not be allowed to change.

(2) electricity should be applied to Party A, electrical equipment to be installed by electricians holding an operating license, and set up a distribution box, do not pull the temporary line at random, in line with the relevant provisions of the State.

V. Party B should apply for temporary fire permit to Party A's relevant departments for open fire construction, equip with fire fighting equipment and strictly implement the fire safety system, and Party A will send someone to the site for inspection after issuing the fire permit.

Sixth, Party B shall conduct fire safety education for all personnel participating in the construction, and strictly abide by the relevant provisions of the construction site safety and fire prevention, and obey the management of Party A's on-site personnel, such as fire at the construction site, shall promptly report to Party A and the organization of the fire, pay attention to the protection of the scene of the accident.

VII, Party B in the construction of the use of flammable substances, should first notify Party A, must comply with the "Chemical Hazards Safety Management Regulations", take effective safety measures, have a special warehouse, by the person in custody, not overnight storage.

VIII, Party B shall not be used in the construction of large areas of paint stripper flammable liquid. When spraying paint at the scene, there should be good ventilation measures, not and other types of cross-work, the scene is strictly prohibited open flame, to use explosion-proof appliances.

IX, Party B must be set up in the construction site of non-smoking signs and fire safety system board.

X. Party B construction piles or garbage shall not block fire facilities, shall not block the fire evacuation channel, and clean up garbage in a timely manner.

xi. Party A provides assistance for the implementation of the above provisions and is responsible for supervision and inspection. Party A has the right to penalize Party B and order stoppage of work if Party A finds that the construction process violates the fire safety regulations or fails to construct the building according to the relevant regulations during the inspection.

XII, the completion of the project should be reported to the fire department inspection, and after obtaining the relevant acceptance of the approval, Party A of the leased area for the completion of the acceptance.

xiii, construction, where Party B does not comply with fire regulations and fire caused by fire, fire, Party B must assume responsibility and compensate for all economic losses.

xiv. Party A has the right to revise the above terms and conditions at any time due to the construction site.

This statement of responsibility is effective since the signature, the statement of responsibility in triplicate, Party A and Party B each holds a copy, and another copy of the municipal fire department for the record. This letter of responsibility in the construction acceptance is completed, construction personnel all evacuated ________ (rental housing name) after the self-termination.

Party A (seal) Party B (seal)

Responsible person: Responsible person:

_____ ___ month ___ ______ ___ month ___

Content expansion: safety and fire safety responsibility of individuals

In order to strictly implement the rules and regulations on production safety and fire safety, and to effectively carry out good labor protection work

I. Obey the company's leadership and the person in charge of the scene of the command and management, do not violate the rules of operation. Have the right to stop others from violating the rules, have the right to refuse to violate the safety and labor protection regulations, safety operation procedures of the instructions.

Second, to comply with the production safety and fire safety regulations, it is strictly prohibited to smoke in the no-smoking area, forbidden to work after drinking, forbidden to fatigue work, forbidden to work without production safety training, without fire safety education.

Third, the company provides employees with the protective equipment needed for work, employees should seriously study and actively participate in personal protective equipment training, and resolutely implement the production safety management regulations.

Fourth, strictly abide by the labor discipline, not private crosstalk operations, work shall not fool around or engage in other things unrelated to the content of the work, so as to "do not harm themselves, do not harm others, not be harmed by others, to protect others from being harmed.

Fifth, in the work of any personal violation of workplace accidents or injuries caused to others, in addition to the accident is fully responsible for the accident, should also bear the corresponding medical expenses of the injured; causing property damage or injury to others, depending on the circumstances of the economic compensation, serious criminal responsibility.

Sixth, actively participate in various production safety and fire training activities, learning and implementation of the company's production safety and fire safety related systems, more help to safety production and

promote fire safety rationalization proposals. The company will reward employees who find major safety hazards.

Seven, because of the violation of the company's production safety and fire safety related systems caused by the company's equipment, property damage, in addition to bear the corresponding compensation, the serious will be held legally responsible.

VIII, fire safety responsibility, fire safety managers and employees to do "six masters"

(1) master the fire laws and regulations and safety regulations

(2) master the unit, post fire emergency and fire prevention measures

(3) master the use of fire protection facilities and equipment

(4) master the use of fire protection facilities and equipment

(1) master the fire protection system, fire prevention measures

(1) master the use of fire protection facilities and equipment

(4) master the alarm, fire and evacuation skills

(5) master the safety evacuation routes and guide the evacuation procedures and methods

(6) master the contents of fire emergency evacuation plan and operating procedures

Employees on the job, transfer to the job should be qualified by the post of fire safety training; on-the-job personnel once a year for fire safety education and training

IX. Responsibility" and can comply with the safety provisions of the personnel can be on the job,

Where the "responsibility" is not signed and can comply with the safety provisions of all shall not be on the job.

X. "Statement of Responsibility" in duplicate, signed by both parties to sign a copy.

XI, the "responsibility" from the date of signing effective.

Company: (Chapter) Responsible person: (Signature)

Date: Month of the year Date: Month of the year

Renovation Project Responsibility Letter 2

Hereby, the tenant _________ entrusts _________ to carry out renovation on the _________ floor of the _________ building, which is operated and managed by the _________ property management company, purchased by the tenant. _________ room for renovation. In order to strengthen the management of the renovation works and ensure the quality of the works and the normal working and living order of the building, A and B agree to sign this responsibility letter.

I. Decorators must pay a daily management fee of _________ yuan per person to the property management company when they enter the house for decoration.

II. Renovation personnel must submit two 1-inch photos per person, one for the temporary pass and the other for the personal file.

Third, renovation personnel during the renovation shall not affect the rest of the neighboring residents, the renovation must be carried out during the specified time, that is, 8:00 a.m. - 12:00 p.m., 14:00 p.m. - 18:00 p.m. Prohibit the use of electric machinery at night and paint spraying and other operations.

Fourth, the renovation personnel are not allowed to intrude on other owners, are not allowed to loiter in the hallway, are not allowed to stay on other floors.

V. Decorators must keep the public **** place, including stairs, aisles and walls clean. Not allowed to pour sewage, waste in the hallway, not in the public **** parts of the pile of debris, renovation waste should be disposed of in a timely manner.

Six, the person in charge of construction to ensure the integrity of the public **** facilities on all floors, such as not pressing the elevator button at will, no carving, painting, can not pick all kinds of door locks.

Seven, pay attention to electricity and fire safety. For example, when using electricity to use the appropriate plug; strictly prohibit the use of power cord directly to the leakage switch; strictly prohibit the use of electric stoves for cooking, boiling water.

VIII, welding construction must be applied to the property management company in advance to equip with fire-fighting appliances, prohibit smoking next to flammable and explosive substances.

ix. Decoration materials exceeding the length and width, prohibit the use of elevators.

X. Decorators are not allowed to stay overnight in the construction site, and those who need to stay overnight should contact the property management company first, and can only stay overnight after consent.

XI, the construction team should be strictly in accordance with the relevant provisions of the decoration. If the owner requires unauthorized renovation, it should be explained and not renovated. Otherwise, in addition to the owner's responsibility, the construction team should also bear some responsibility.

XII, when problems arise, the person in charge of construction should contact the property management company in a timely manner, the two sides negotiated to solve the problem, do not take the initiative.

xiii. In case of violation of the above provisions, the property management company will be fined according to the severity of the case, and has the right to order the suspension of rectification.

xiv. If there are any unresolved issues, the two sides can be resolved through separate negotiations.

XV, this responsibility is valid after signing and sealing. In duplicate, each side of a copy.

Party A: _________ Party B: _________

Responsible for: _________ Responsible for: _________

_________ year ____ month ____ day _________ year ____ month ____ day

Renovation Project Responsibility Letter 3

Party A: xxxx

Party B: x

In order to y implement the "Work Safety Law", to further improve the awareness of production safety, the implementation of the safety management system, and to strengthen the safety management of the construction project department. Combined with the actual situation of my site, improve my site safety target management, and effectively to "safety first, prevention first" policy to guide our work to improve the sense of responsibility, to prevent all kinds of accidents, to protect the health of workers and national property from loss, my company (project department) and your unit signed the following production safety responsibility. .

I. Before operation, you must do your own safety protection to ensure the safety of individuals and others.

Second, the strict implementation of welder safety regulations, welders must be licensed. Construction operators must seriously implement the construction site temporary power safety specifications.

Third, the welding machine, welding machine shell must meet the requirements; must be well grounded, its power supply installation and removal should be carried out by a full-time electrician.

Fourth, rain, moisture should be good, put the wire, ground wire is prohibited from contact with the wire rope, is strictly prohibited to use the wire rope or motor equipment instead of the zero line.

Fifth, the end of the work, should cut off the power supply, the equipment into the library.

VI, carefully in accordance with the `safety operating procedures for work at height, construction operations in the use of water, electricity, fire must be negotiated in advance with the Party and the project development unit to determine the use of procedures and scope.

VII, construction work process and out of the site due to negligence caused by casualties, Party B is responsible for their own, Party A is not responsible for any joint and several liability, while Party B will also bear the cost of local government fines on Party A's accidents and according to the provisions of the "Work Safety Law" to assume the corresponding legal responsibility.

Eight, the construction process, Party B personnel must protect the construction site facilities, equipment integrity and finished product protection; strictly prohibit the destruction, haphazardly built, dismantled and other phenomena. If there is damage, Party B will be responsible for all restoration costs.

Nine, it is strictly prohibited to throw, play in the frame, play, materials should be placed in the designated location of the classification of neatly stacked.

Ten, Party B must do safe and civilized construction, equipped with the issuance of labor protection supplies, and the correct use, wear, adhere to the safety of regular inspections, and timely rectification and elimination of hidden dangers in the operation of the operation and the unsafe factors.

This book in duplicate, Party A and Party B each sign a copy.

Party A (seal) Party B (seal)

Legal person or entrusted unit agent:

Date:

Responsible person:

Date:

Renovation Project Responsibility 4

Hereby, there is a resident _________ entrusted to _________ (hereinafter referred to as Party A) to purchase (or lease) by the _________ Property Management Company (hereinafter referred to as Party B) to carry out renovation of Room _________ on the _________ floor of the _________ Building operated and managed by _________ Property Management Company (hereinafter referred to as Party B). In order to strengthen the management of the renovation project, to ensure the quality of the project and the normal working and living order of the building, Party A and Party B agree to sign this responsibility statement.

I. Decorators must pay a daily management fee of _________ yuan per person to the property management company (down. kt250. com data download) when they enter the house for decoration.

Second, renovation personnel must submit two 1-inch photos per person, one for the temporary pass, and the other for personal files.

Third, the renovation personnel during the renovation shall not affect the rest of the neighboring residents, the renovation must be carried out in the specified time, namely, 8:00-12:00 a.m., 14:00 p.m. - 18:00 p.m. Prohibit the use of electric machinery and paint spraying and other operations in the evening.

Fourth, the renovation personnel are not allowed to intrude other owners (or users), are not allowed to loiter in the hallway, are not allowed to stay on other floors.

V. Decorators must keep the public **** place, including stairs, aisles and walls clean. Not allowed to pour sewage, waste in the hallway, not in the public **** parts of the pile of debris, renovation waste should be disposed of in a timely manner.

Six, the person in charge of construction to ensure the integrity of the public **** facilities on all floors, such as not pressing the elevator button at will, no carving, painting, can not pick all kinds of door locks.

Seven, pay attention to electricity and fire safety. For example, when using electricity to use the appropriate plug; strictly prohibit the use of power cord directly to the leakage switch; strictly prohibit the use of electric stoves for cooking, boiling water.

;