Plant area is generally very large, the renovation period will be relatively long, but the overall construction process and housing is similar, but the demand for materials and housing decoration is different, and plant decoration is mainly focused on the quality of materials and fire safety settings, the next beaver office specifically about the process of plant decoration.
One, the preliminary plant design
1, detailed measurement of the plant area, including the ceiling area, tiling area, wall paint area, wallpaper area, floor area.
2, according to the area of the design of construction drawings, office location, placement of plant equipment, doors, windows, vents in the design drawings need to be marked.
3, understand the price of materials and construction of detailed drawings, combined with the actual need to calculate the budget.
Second, the process of plant decoration
1, measurement and design, measurement and design of the plant, the plant is different from the house decoration, measurement and design is generally based on practicality and safety, to the simple design.
2, determine the budget, measurement and design is completed, the price of materials used in the renovation, the price of workers to analyze the budget, if the customer feels reasonable to sign a contract, and then start the formal renovation.
3, the overall remodeling, first of all, tear down the wall or do spacing, first of all, the overall area of the rough division out.
4, water and electricity transformation, plant renovation of water and electricity transformation is very important, due to plant machinery more, and high power, should pay attention to the choice of good quality, in line with the power of the wire.
5, ceiling installation, if the plant needs to install ceiling, then according to the contract materials to complete the ceiling installation.
6, wall treatment, if you choose to paint the walls, then paint the walls, if you choose to lay tiles, then lay tiles on the walls.
7, plant acceptance, plant acceptance of the best customers, designers, construction managers or decoration supervisors are present in the case of their own check. If there is no problem then it can be considered a qualified home inspection.
8, project settlement, plant acceptance is completed, the decoration company and the customer for the project settlement, in accordance with the provisions of the contract to complete the cost of settlement, and then formally enter the after-sales link, if the quality of the plant in the warranty period of the renovation problems, you can contact with the renovation company, the renovation company will arrange for personnel to carry out maintenance.
Three, what are the precautions for plant decoration?
1, rational use of functions. Scientific division based on specific areas of practice is the main purpose. Usually the area of the factory plant is relatively large. Then, when dividing the use of function, must also consider the flow of personnel and ventilation and fire escape reserves.
2, the approval of the fire escape for safety reasons, must not ignore the installation of fire fighting equipment. Before installing fire protection facilities, you must go to the local fire department for approval. Once the project is complete, it must be sent for review. It usually takes about 10 days to complete the firefighting process, so you should consult with the firefighting company for the project before renovation.
3, partitioning options in the decoration process, often need to reasonably divide the area into different functional areas, so it is necessary to use different materials partition to divide them. Commonly used partitions are generally: light steel, stainless steel keel drywall partition, glass partition, aluminum and plastic panels of toughened glass partition and pure toughened glass partition. These partitions may play a role in separating, but they represent different styles and prices, with light steel keel drywall partitions costing less. It is usually easily accepted.
The choice of material to decorate the floor is very important because there is a lot of wear and tear every day, so please choose some durable materials to decorate. If the floor to support the floor load on the original floor needs a layer of concrete, the floor of the factory building that needs anti-static must be placed on the floor of anti-static flooring or anti-static PVC and other materials. There is also a relatively hard-wearing flooring material called "terrazzo flooring". This type of flooring is more economical and practical. The appearance of the product is not much appreciated.
Well, then the above is about the introduction of the factory renovation steps and considerations, we must remember to pay attention to the factory renovation considerations, so that the construction of the factory more perfect.