The hospital has a construction area of 36,785 square meters, 530 beds, and 446 sets of equipments above RMB 10,000, including 43 sets of equipments above RMB 300,000. In particular, the full digital X-ray radiography system, cardiac color Doppler ultrasound diagnostic instrument, automatic biochemical analyzer, non-contact intraocular pressure machine, anesthesia machine, fault-tolerant server, black and white ultrasound, respiratory machine, helical gas pedal, ECT, digital X-ray machine, a full set of oral therapies, guardianship equipment, as well as whole-body CT machine, automatic biochemical examination, color Doppler ultrasound diagnostic equipment, hemodialysis machine, digital X-ray machine, full digital breast cancer treatment machine, digital breast cancer treatment machine, digital breast cancer treatment machine, digital breast cancer diagnostic equipment. film machine, all-digital breast molybdenum-palladium machine, 5-classification automatic blood analyzer, automatic electrophoresis instrument, ultra-biological emulsification instrument, etc., so that the hospital equipment and fixed assets in the same level of hospitals in the forefront. Under the care and support of the district party committee and district government, the hospital has carried out the construction of Phase I and Phase II of the project successively, and invested a total of 200 million yuan to build an eighteen-storey intelligent ward building with central air-conditioning, centralized oxygen supply system, and also equipped with small sanitary and bathing facilities. At the same time, in order to meet the needs of different levels of hospitalized patients, the twelve-floor obstetrics and gynecology ward also specializes in "Sweet House", "Love House" and other family-oriented wards, the six-floor special wards are divided into high-level wards (suites) and standard wards, and the four floors above the wards are opened. The landscape ward allows patients to enjoy home-like warm service at all times. In order to speed up the development of the hospital, the hospital in 2006 and invested about 8 million yuan of funds, a medical treatment center (Emergency Center), that is, the Emergency Department and the red building and rescue channels, elevators and other ancillary facilities for renovation, renovation of the building area of 3,350 square meters, a marked improvement in the environment of the patient's visit.