Comprehensive wiring system cabinets, racks, what are the installation requirements

The following content is collected and organized by Tianjin Capital Decoration, for reference only.1 The design of equipment room should comply with the following provisions: a, the equipment room should be located in the middle of the trunk subsystem; b, the equipment room should be as close as possible to the cable introduction area of the building and the network interface; c, the location of the equipment room should be easy to ground; d, the room temperature of the equipment room should be maintained between 10 ~ 30 ℃, the relative humidity should be maintained at 20% ~ 80 percent, and there should be good ventilation; e. There should be enough space for equipment installation in the equipment room, and its area should be at least not less than 10m2.2 The equipment room should prevent the intrusion of harmful gases (such as SO2, H2S, NH3,, NO2, etc.), and there should be good dust control measures, and the dust content limit should be in accordance with the provisions of Table 12.2.2.3 In the area of seismic zone, the installation of the equipment should be carried out in accordance with the provisions of the earthquake-resistant Reinforcement, and in line with the "seismic design code for the installation of communications equipment" YD5059-98 of the corresponding provisions.4 equipment installation should be in line with the following provisions: a, racks or cabinets in front of the headroom should not be less than 800mm, behind the headroom should not be less than 600mm; b, the bottom of the wall-mounted wiring equipment should not be less than 300mm above the ground; c, in the installation of other equipment in the room between the equipment, the headroom requirements around the equipment according to the equipment When installing other equipments in the equipment room, the headroom requirement around the equipments shall be executed according to the relevant specification of the equipments.5 The equipment room shall be provided with not less than two 220V, 10A single-phase power sockets with protective grounding.6 The installation process requirements of the equipment room shall meet the provisions of the "Code for Design of Telecommunication Specialized Houses" YD5003-94 regarding the wiring equipments except the above provisions, and shall comply with the corresponding design requirements when installing the telecommunication equipments or other application equipments. When installing telecommunication equipment or other application equipment, it should meet the corresponding design regulations.