Infrastructure work summary excellent collection

When the work is carried out to a certain stage or come to an end, it is necessary to go back to the work done to seriously analyze and study the work done, to affirm the achievements, identify the problems, summarize the experience and lessons learned, raise awareness, clarify the direction, in order to further do a good job, and to put these in words, it is called a summary of the work. The following is my hand-picked work summary, I hope to help you!

Infrastructure Work Summary Part I

In the first half of this year, the party group in the Bureau of the correct leadership, in charge of the direct guidance of the leadership, in the various offices, directly under the cooperation of the unit, the Office of the Infrastructure around the construction of the "Provincial Food and Drug Administration Technical Supervision Center" as the core , solid work, and strive to promote the construction project. Solid work, efforts to promote the construction of the project's preliminary work. Now the main work is summarized as follows:

1, for the completion of the "Provincial Food and Drug Technology Supervision Center" construction project planning and design points. March 6, the Nanjing Municipal Planning Bureau completed the completion of the planning and design points of the construction project for the completion of my bureau. The land area, plot ratio, building height, building density, green space rate and other planning indexes of the project site of our bureau put forward requirements. This plays a guiding role in the planning and design program design of our project. After repeated coordination, the original height limit of 60 meters was changed to a height limit of 100 meters, leaving a huge space for our future design needs, so that the design points to meet our design needs.

2, and actively strive for the project's construction funds. Due to the "provincial food and drug technology supervision center" project construction funds in addition to the provincial financial ___ year allocated 42 million yuan, the construction of funds short of a large space. 26 March, we made to the provincial government, "Provincial Food and Drug Administration on the request for allocation of funds for the construction of food and drug technology supervision center of the instructions" (Su food and drug supervision base 〖___〗 27), the provincial food and drug administration on the request for allocation of funds for the construction of food and drug technology supervision center (Su food and drug supervision base 〖___). 〗27), I implore you to arrange for the project construction funds as soon as possible, and explain the urgency of the project construction, necessity. 31 March, the provincial government office gave the proposed advice, we are now actively and the Provincial Development and Reform Commission, the Provincial Department of Finance communication and coordination, and strive to obtain the support of project funding.

3, study and research, absorbing and learning from other municipal bureau of construction design concepts. In order to improve my bureau of technical supervision center construction project, in early March, the provincial bureau of infrastructure office to Xuzhou, Suqian, Huai'an three municipal units, to study, to understand the research of their project progress, funding, the main practices, as well as the main problems that currently exist. Through this visit to exchange learning, quite rewarding. Visited several units in the function, layout, shape and internal and external environment to create a full embodiment of the human-centered design concepts, fully taking into account the future development trend of the laboratory. All believe that the early functional design and its importance, to meet the current function at the same time must be reserved for future development. Successful experience and the regrets left behind are worthy of our reference. At the same time, the Office of Infrastructure on the "two a center" project of the three user units were visited, research, listen to their needs for future development.

4, for the National Bureau of funding support for the project. May _, according to the State Food and Drug Administration Office of the "on the adjustment of the national port of the drug testing center on the adjustment of the preliminary design of the project preparation and approval of the opinion of the letter", part of the drug testing center off-site expansion, subject to the local fulfillment of the corresponding approval procedures. We will work with the provincial Development and Reform Commission joint office to (Su Food and Drug Administration base 〖__〗33) letter to the State Food and Drug Administration Office to determine the preliminary design of the project by the Jiangsu Food and Drug Administration is responsible for the preparation of the Jiangsu Provincial Development and Reform Commission is responsible for the approval of the views.

5, strengthen the system construction. Developed a "project money management regulations", "supervision and inspection of infrastructure projects" and other related infrastructure management system. At the same time, the infrastructure personnel are required to comply with the integrity of the discipline, strict implementation of the provisions of the infrastructure.

6, take the initiative to understand the project required to support the construction of the relevant situation of the unit. According to the project construction needs, a wide range of design, construction, project consulting, supervision, equipment suppliers and other units to contact, to understand the situation. The relevant work is being actively promoted.

The next step, the infrastructure office will be in accordance with the party group of the Bureau of the "two centers" project construction requirements, continue to promote the progress of the project.

Infrastructure Work Summary Part II

Over the past year, under the care and support of the leadership of the hospital and the section, with the assistance and cooperation of colleagues, conscientiously perform their duties, obey the work arrangements, and better complete the target task. Joy accompanied by sweat, success accompanied by hardship, regret inspired by struggle, although the work experienced many difficulties, but for me every time is a good exercise, constantly enrich themselves, combined with the central task of the infrastructure section of the work of the 20_year review is summarized as follows:

First, can conscientiously implement the party's principles and policies, and actively participate in the learning of political theories; love of work and dedication, a strong sense of responsibility and dedication; strictly abide by the principles of the party's policies, actively participate in the study of political theories; love of work and dedication, with a strong sense of responsibility And professionalism; strict self-discipline, style, integrity, unity of comrades; abide by party discipline and state law and school discipline and school rules.

Second, in terms of achievement: I conscientiously fulfill the duties of the post, always maintain a rigorous and conscientious work attitude and meticulous work style, diligence, and made efforts to improve work efficiency. This year's specific work can be divided into the following aspects:

(a) the completion of the outpatient hospitalization complex construction work, which includes assisting in the completion of the main construction of the bidding process, for construction permits, quality supervision and safety supervision of the work for the record, to assist the leadership to do a good job in the preparation of various infrastructure investment plans and reporting work; to assist the construction unit and the supervisory unit to do a good job of the main drawings will be examined as well as the special Construction expert argumentation review; to assist the supervision unit to complete a variety of construction data archiving work; seriously complete the project image progress report, regularly report to the higher authorities of the project progress report, for the leadership of the progress of the project and quality control to provide the basis for data basis. Seriously draft, circulate and revise the bidding documents, and organize bid issuance, Q&A and bid opening activities on schedule and according to the regulations.

(ii) Assisting departmental leaders to prepare for the submission of GP training bases.

(iii) Participate in the bidding agent work for the renovation of old houses in *** and Road. In the bidding process to be able to strictly require themselves, consciously abide by the work discipline, bidding activities after the end of the bidding, bidding information will be classified, arranged, organized and archived.

(d) Completion of the settlement of the pineapple ridge outpatient residential complex.

Third, there are problems and intentions

Although after some efforts, my business level has improved a lot compared to the past, but still need to further improve. In the future work, should be more further good and various sections of communication, collaboration, continue to strengthen the sense of integrity, sense of responsibility, sense of service, to improve their overall quality, obedience to the leadership, unity of comrades, hard work, strengthen the theory and business learning, and continue to improve the level of business and technical skills. Timely discovery of their own management and professional problems, take the long and make up for the shortcomings, to avoid their own due to ill-considered and caused by the impact of the project. In the new year I will, as always, love their work, and strive to make their work to a higher level, more proactive in the completion of the Division of the tasks assigned to the school's infrastructure work to add bricks and mortar. For the school infrastructure work to make a greater contribution.

Infrastructure Work Summary Part III

Infrastructure Section Work System

1, under the leadership of the President, is responsible for the hospital's overall planning, architectural design, water and electricity, steam installation, construction management, planned infrastructure investment, housing maintenance and building materials storage.

2, set up for the medical front-line services for the idea, adhere to the principle of hard work and thrift hospital, and strive to do more with less money, make good use of waste, increase revenue and save money.

3, to study, and constantly improve the political quality and business level, improve the efficiency and working ability.

4, strengthen the work management, outsourcing projects must be carefully selected construction team, good quality and construction management, strict accounting, reduce costs.

5, in the construction of various, strengthen the safety education, to eliminate accidents.

6, adhere to the integrity, in the project contracting, construction, management, quality supervision and other work shall not use power for personal gain, individuals shall not accept kickbacks, referral fees, benefits and in kind.

7, responsible for the preparation and review of the final account of the project.

8, organize and keep the infrastructure archives.

Infrastructure Section Chief duties

1, under the leadership of the President, is responsible for the hospital infrastructure projects related to the overall organization of the project, the development of this section of the work and organize the implementation of the regular report, strictly in accordance with the "Urban Planning Act" and the relevant state policies and regulations, the planning of the project, the drafting of the plan program book, and to handle the relevant procedures.

2, is responsible for the approved project plan task book implementation of the implementation of the relevant procedures, the organization of the project bidding recommended construction qualifications of the construction unit, approved by the dean of the construction contract signed after the quality supervision procedures.

3, the organization of personnel procurement of materials, equipment, supervision and inspection of project progress and project quality.

4, the organization of undergraduate personnel for political and business learning.

5, responsible for the reception of the relevant units of contact.

6, management of infrastructure file materials, timely compilation and archiving.

7, to complete other tasks assigned by the leadership.

8, responsible for the assessment of this section of the personnel, attendance, and proposed rewards and punishments.

Infrastructure Work Summary Part IV

Since 20_, I have been in the college leadership and the support and help of colleagues, organization and leadership of the whole section of the staff to overcome the difficulties, hard work, and better complete the tasks assigned by the college, for the construction and development of the college to make due contributions, now the six-month work report is as follows.

I. Ideological and political performance and professional ethics.

Focus on strengthening their own political and theoretical learning, and constantly improve the ideological and political quality Seriously study the important ideas and the spirit of the 16th National Congress of the Party, and actively participate in the company's "style of education" activities, and effectively change the style of work, always keep in mind the work of the purpose of serving the people wholeheartedly, taking into account the overall situation, and forbidding the implementation of the order, upholding the public power, honesty and integrity of the government. Public power, clean government. At the same time for the characteristics of the infrastructure work, often organize members to study the company's management of the project regulations, methods and illegal, undisciplined case notification, strengthen integrity education, prevent the occurrence of corruption, corruption, and strive to build a united, pragmatic, law-abiding team of excellence.

Second, the completion of the work

1, strengthen internal management, improve work efficiency Further clarified the division of labor within the section, the duties and responsibilities of the authority and the procedures, to avoid mutual commissions in the event of confusion, unclear responsibilities and multiple management, caliber of the confusion caused by the construction site, and greatly improve the efficiency of the work. In the work of efforts to both dare to manage and good management, no favoritism, no mercy, do not take the principle of trade.

2, pay attention to the timely resolution of internal conflicts, maintaining unity within the section As the College's engineering management department, to ensure that the project is completed quickly and well, the mutual support of colleagues, each other is very important. Therefore, in the work of the problems and contradictions, I do not avoid, but actively to channel, take the initiative and comrades to communicate and exchange, treat people with sincerity, do a good job of everyone's ideological work, will be resolved at the initial stage of the contradiction, for the work of the department to create a good spiritual atmosphere.

3, take the initiative to learn professional theoretical knowledge, and constantly improve the level of business In the past six months, I take the opportunity to work, take the initiative to learn professional theoretical knowledge (including the study of new materials, new technologies, new cost management methods and soft ground treatment, etc.), and will learn the knowledge applied to the actual management of the project for the College of engineering management standardization, scientification, reduce project costs have made a contribution.

4, diligent efforts to fully complete the work The first half of this year is the heaviest construction tasks in my hospital period, both the second phase of the new project and overhaul, repair works, while there are a large number of equipment procurement and management; from the plan to the completion of the project entity and archiving of a large amount of work to be done, including the plan to apply for, drawing design, planning and approval, bidding work, site management, Contract management, pre-budgeting, final account review, data archiving and so on. In order to complete the above work on time, I do leg diligence, hand diligence, mouth diligence, as far as possible to make the pre-construction work well and quickly completed, for the later construction time. During the summer and winter vacations and colleagues together to give up rest time, stick to their posts, in the key parts of the project and the construction of the tension stage, regardless of personal compensation overtime, in order to fully complete the work to do their best. The main work in the first half of the year is as follows: (1), the full completion of the Jinlan Avenue project; (2), the basic completion of the Ministry of General Engineering (including greening, roads, fences, underground pipelines, etc.) design, construction tasks; (3), the completion of the Ministry of the dormitory south building overhaul project tendering and construction; (4), the completion of the 2501 practice room renovation; (5), the completion of the 1 # building toilet renovation; (6), the completion of the cafeteria (including the headquarters and the West) Renovation, remodeling work; (7), the completion of the second half of the company's engineering and construction inspection work; (8), complete the ___ year maintenance project final account review; (9), complete the maintenance of the dormitory building in the Western District; (10), the completion of the 5 # equipment such as computer room procurement work.

5, love and dedication, bold speech, do a good job in the leadership of the staff In the work, do not follow the crowd, do not deliberately attached to the leadership, dare to put forward their own point of view for the leadership of the decision-making as a good adviser. Engineering construction is characterized by large investment and high rework costs. Therefore, in the determination of the design and construction stage, as an engineering professional I can objectively and pragmatically put forward their own point of view, do not follow the crowd, do not like the leadership and against the will of the concordance. I think, people are not sages, the leadership can not be proficient in everything, if you know it is not good and do not point out, it is not a good cadre, not to mention the leadership of a good assistant, the result is not only can not maintain the prestige of the leadership, but also will make the country, the collective interests of the damage. Such as in the treatment of Jinlan Avenue soft ground foundation process, the college leadership for fear of foundation subsidence, was ready to underground 3 to 4 meters deep silt all dredged and replaced, this idea is also recognized by the relevant designers. At that time, I can do it, even if the project overrun is also caused by the site conditions, not to mention the instructions of the leadership, the designer's approval, I will not take any responsibility. However, with years of construction management experience and professional knowledge, I felt that this was not a very proper way to handle the matter, so I did not implement it immediately. Afterwards, after consulting a lot of information and seeking advice from experts, I put forward a new treatment plan to the leaders: according to the site conditions and the bearing requirements of the site, as long as the soil replacement treatment is carried out within the depth of 0.8 meters, it is completely possible to avoid subsidence and meet the requirements for use. Practice has proved that this program is not only economic, reasonable and feasible, it not only makes the project quality has been effectively guaranteed, but also for the company to save a large amount of construction funds.

Third, the existing problems and the direction of future efforts

Looking back on the work of the past six months, although we have made certain achievements, but in some areas there are still deficiencies. Such as political theory learning is not yet the depth and breadth of work is not bold enough, the lack of creativity to carry out the work, the work is not solid enough, sometimes there is a fear of difficulties, individual work is not perfect. In the future, I will consciously strengthen the study, constantly improve personal cultivation, and strive to improve the level of work, to avoid the shortcomings of the strengths, hard work, and make greater contributions to the development of the College.

Infrastructure Work Summary Part V

The end of the year 20_ is so unknowingly approaching us, time is always so unforgiving. Thinking back to the work of a year in the experience of the little by little, there are successes and shortcomings. The following is my personal work in 20_ and some ideas briefly reported as follows.

First, review the work of 20_year

20_year I mainly carried out the following aspects of work:

1, the construction drawings of the Railway Institute for review. Drawings are an important basis for engineering construction, construction drawings design level of the quality of the project, cost, progress has a great impact. At present, the responsibility and technical level of the designers are generally low, there are always more problems in the drawings, and more importantly, we should dominate the design, rather than being led by them by the nose. To this end, before the start of construction we spent a lot of time repeatedly on the drawings for review, to the design institute put forward many version of the problem and modification of the views, so that many problems in the formal drawings before the completion of the modification of the remaining part of the problem and then in the form of drawing review, negotiation for the solution. In this way, we have basically achieved the drawings of the problem in the formation of engineering entities before the discovery and resolution of the control objectives.

2, on the construction site of the Railway Institute of safety management. For the construction site, effective safety control is the fundamental guarantee for the smooth progress of the construction project, there is no safety there is no everything! According to the project division of labor I am mainly in charge of the project's safety management, railway academy two supervisory units of safety director of the more experienced, construction contracting unit of two and three bureaus, although the country's special construction enterprises, but the technical level of their project safety management personnel and work responsibility is far from meeting the needs of the site safety management. Neither can fully discover the existence of site safety hazards and for the discovery of the problem can not be well implemented corrections. To this end, on the one hand, we make full use of supervision, supervision units require daily inspection must be in place, as far as possible to find the problem of notification of the General Contractor at the same time weekly use of half a day to carry out special safety inspections, supervise its rectification. Second, for the technical level of the participating units are not the same, the standard is not consistent, the site of the safety management of the implementation of the sample lead, while requiring the construction unit to make the construction site safety management control points, as the basis for management. Third, the organization of supervision and general contracting, subcontracting safety officer to open a special meeting, to the general contracting, subcontracting units of the safety officer delineate the responsibility area, the responsibility building, the responsibility to the person, they are required to the existence of hidden dangers of dead eyes, staring at the death of a problem solved and then go to solve the next, at the same time on the irresponsibility of the personnel resolutely retired from the field. Fourth, for the general contractor can not effectively manage the subcontracting situation, by the supervision unit and our project department personnel to help the general contractor to implement. Fifthly, we focus on the safety hazards in different periods and construction sites and conduct detailed inspections. For example, in summer and winter, we strengthen the inspection of the dormitory for civil workers, the inspection standard is to carry out an all-round inspection of each dormitory and each bed, and the forbidden electrical appliances found are confiscated and dealt with by the general contracting unit, and the general contracting unit will be penalized for the recurrence of the problem. Through the implementation of the above measures, the site safety management has been under control.

3, on the Railway Institute of water and electricity works reserved and buried management. Reserve buried for the installation of water and electricity in terms of the project is not large, but it is vital. To this end, we have taken the following measures. First, before the commencement of construction held by us, supervision, general contracting, subcontracting and other units to participate in the briefing, our company for the quality of the project requirements, standards to instill, unify the mind, exert pressure, and inform the company's policy of rewarding the best and punishing the worst, all the way to the subcontractor in charge of the site. Second, the general contracting unit is required to make a special program of pre-embedded, every detail and quality problems are out of specific quality control measures. Third, the sample to lead the way, in each project before construction, the general contractor is required to make a high standard sample, as a basis for future construction. Fourth, in the beginning of the formal construction of the fault, whip. The expansion of small problems, serious treatment, so that the construction unit in the future construction dare not take it lightly. Fifth, continue to whip, high-pressure management, adhere to the principle of not letting go of a problem, so that the construction unit to produce fear. In this way, through more than half a year's efforts, now a structural stage of the basic completion of the reserved buried, the overall quality than a period of greater improvement.

4, as the company's old staff not only their own integrity and self-discipline, in the treatment of new comrades and young comrades to the company, but also adhere to the integrity and self-discipline is the company's core competitiveness of the concept of inculcation of them, at the same time, their own lessons learned from their work unreservedly tell them.

Second, the creation of high-quality engineering ideas

For the second phase of the project quality standards, the company asked to create high-quality engineering, a hundred years of engineering, relative to a period of time to have a significant improvement. From the beginning of June piling to now more than half a year, it should be said that our project department to do more hard, but in terms of project quality there are still many unsatisfactory places. Now in the construction market, like us, in-depth management of the project construction unit is very few, but I think we do not do enough, because our quality goal is a high-quality project, a hundred years of engineering, we have to go deeper, but also because now the construction unit, supervision unit management personnel's sense of responsibility and technical level in the declining, we have to go deeper.

But the extended management is only a beginning for us to create a high-quality project and a hundred-year project. I think we have to really achieve this goal, in the extension of management at the same time to refine the management, the best way is to refine the quality of the project management. The establishment of our company's own project quality management standards, this standard should be very specific, detailed, accurate description of the quality standards that should be achieved by each sub-part of the project, to achieve this standard control points are what? How to eliminate quality problems? What work must be done and never let go, otherwise it will not meet our requirements, this standard is strictly followed by the whole company. In this way, we can try to avoid the risk caused by the level of employees, experience, handling different ways of doing things to the enterprise. So that every employee of the company, no matter where they come from, can be in accordance with the same work ideas, the same work methods, the same quality standards to complete their work.

To build high-quality projects, I think it is necessary to establish a set of normative, refined, standardized, institutionalized things to guide and constraints, so that we can create high-quality projects, century-old projects on the road the better.

Third, the work of the experience and lessons learned and on the work of 20 ___ envisioned

The company has been insisting on the clear thinking, clear goals, competent style, staring at the dead work style does play a great role in promoting my work. But there are still some shortcomings in the work, for example: the work is still not meticulous, did not find the ceiling fan and projector is too close to meet the requirements of the use of the problem, the later will cause some changes. In the work of the construction unit's management methods and management still need to be improved and strengthened. Next year is the key year of the Railway Academy project excellence, for this reason, in 20__ I want to focus on the following work:

1, must continue to adhere to the clear thinking, dry, competent work style. Good work style is the basis for any good work.

2, in a clear and accurate grasp of the drawings at the same time. Adhere to the dominant design, design for my ideas.

3, explore the implementation of refined management. In each project before the start of construction organization construction, supervision units of the project in advance for detailed planning, on how to do to ensure quality to come up with specific ways to strive to do a good job of the project.

4, on the basis of detailed planning, adhere to the management of the sample lead, expand the sample area, so that it can play a more effective role in the sample lead the way, but also more problems can be found for the construction of a large area to be fully prepared.

5, for the construction site safety, quality issues in line with the principle of one are not spared to work. For the construction unit, supervision unit management to do a long and unremitting, increase the construction unit, supervision unit management efforts.