Party A: _________
Party B: _________
By consensus of the two sides, the following terms are concluded, *** with the letter.
A. Party B undertakes the following projects
1. equipment moving to the new school: _______ yuan/table, _______ table, _______ yuan, computer tables and chairs _______ yuan/set, _______ set, _______ yuan. Podiums ______, _______$. Other stuff moving costs _______$ (including switch moving, remaining _______ computers and remaining desks and chairs to the main control room, etc.). Total _______ dollars.
2. Computer dismantling and installation: _________ yuan per computer and _________ yuan for _________ computers.
3. Network connection: there is already a network cable in the server room, so no longer buy a network cable. But the network cable is not installed to connect. Network cable production, _____ yuan / node, *** production _____ nodes, counting _______ yuan. Podium, switch, hub, cabinet installation, broadband incoming cable installation and connection, system debugging, etc. _______ yuan, rj45 connector ______, _______ yuan. All wires are centralized to the podium. Adopt double network isolation program, need to add a network card, _______ yuan. Replace the network cable ______, the original cable is not long enough, _______ yuan. Total _______ yuan
4. Power lines and installation: there are two computer rooms in the new area that are not in use, and one of them has not been installed with power lines. Need to assemble _______ line line, ______ outlets. _______ yuan/each, counting _______ yuan, distribution box installation and three-phase power deployment costs _______ yuan, materials _______ yuan (including ______ sockets, ______mm2 copper wire _____ package, ____ copper wire _____ package, _______mm2 copper wire ______ meters, _______ road distribution box, etc. ). Reliable power delivery of 20 kW or more. Total _________ dollars.
Two, other projects
1. new area of the first floor of the multimedia classroom to add a podium floor, multimedia system can not be moved directly pan, had to dismantle and re-installation. Including the dismantling of the original podium base plate (_____ yuan, the original base plate for the 5 meters × 2 meters of the whole plate), dismantling the multimedia system (______ yuan), assembling the podium base plate (by the production of the base plate of the carpentry with), reinstallation of the multimedia system (______ yuan). Total cost _________ dollars.
2. Power line repair in the _________ computer room, replacing one set of lines, for a labor cost of _________.
3. 1 computer (school computer) keyboard replacement, _________ dollars.
Three, other terms
1. The quality of materials, the quality of installation, must meet the requirements of each item in the table, network 100m to the desktop. There are additional items of work, another negotiation.
2. The duration of the project _________ days, over the period of fine, calculated at _________ yuan / day.
3. After completion, Party A organizes personnel acceptance, payment after acceptance.
4. This contract is in two copies, the original Party A 2 copies, Party B 1 copy.
5. The date of signing this contract: _________ year _________ month _________ day
Party A (official seal): _________ Party B (official seal): _________
Legal representative (signature): _________ Legal representative (signature): _________
_________ year ____ month ____ day _________ year ____ month ____ day