Construction internship summary

Summary of Construction Internship

Summary is a written material that summarizes and summarizes the experience or situation in a certain stage of work, study or thought, and it can improve our written expression ability, so we have to do a good job of summarizing and writing a good summary. You want to know how to write a summary? The following is my carefully organized summary of the construction internship, welcome to read, I hope you can enjoy.

Construction Engineering Internship Summary 1

Practice is the source of understanding, indeed good, through this internship, so that they have a further understanding of civil engineering as a profession, really know the difference between theory and practice, inspired the interest in this profession, learned something in the books can not be learned for the future of the course has accumulated a lot of perceptual understanding for the future learning to lay a very good foundation for their own learning. It is a good foundation for the future study, and my knowledge and ability have been perfected and improved in a subtle way, meanwhile, the team consciousness has also been obviously strengthened. This internship activity arranged by the college is a really good opportunity for us college students who have just come into contact with this specialty. In short, through this internship, I have benefited a lot.

On the first day of the internship, we are full of curiosity, before the beginning of the previous things learned to review, review the "Introduction to Civil Engineering", "Architectural Drawing" and other related textbooks, and fervently hope and believe that the internship can be a considerable gain, so that they are really put into practice, do not make the mistake of dogmatism, to achieve the combination of theory and practice. The specific content of the internship is as follows:

A visit to the hospital laboratory

The role of the laboratory is to give structural designers a place where they can test the feasibility of their design, which is crucial to the safety and reliability of the building, but also necessary for scientific experiments. In the laboratory, we saw a lot of large-scale experimental equipment, through the teacher's explanation, we initially recognized some of the experimental equipment and its use, and in the use of the process of precautions, including the measurement of trabecular bending, evaluation of asphalt performance of the instrument, and universal experimental apparatus, quadruple straight shear, lightweight consolidation apparatus and other instruments. They are all in essence to provide the specimens with stresses in compression, tension and shear, so as to test their ability to withstand forces, that is, their strength. Some instruments are very advanced, such as the concrete laboratory to determine the tensile, compressive, torsional, shear strength of steel and lightweight consolidation instrument, through the setting of the sensor in the components of the stress and deformation of the relevant information transmitted to the relevant instruments, the experimenter to record the data and analyze and process the results can be derived! Very convenient. In the laboratory we also saw some made workpieces, such as bar-shaped cement blocks and so on. In addition, by visiting the laboratory teacher also combined with the experimental equipment to give us a vivid introduction to several experiments, such as pure bending experiments, evaluation of asphalt expansion and softening point experiments, the determination of sand (small) dry density experiments.

Through the teacher's explanation, we usually see some of the instruments on the construction site has a clearer understanding of their use, working principle, and in the use of the process should pay attention to the problem, the real mouth can say the name of the heart to know the use of the requirements.

Second visit to the design drawing room and technology research institute

Drawings are indispensable to the construction of important technical information, all personnel engaged in engineering technology, must master the skills of drawing. Will not read the map, you can not understand the design intent of others; will not draw, you can not express their own ideas. Therefore, the drawings are known as the engineering community **** the same language. It is obvious that the importance of drawings is extraordinary. Based on this, Mr. Kong seriously and in detail to take out specific drawings to give us an explanation of the type of drawings, drawings of the steps, format, precautions and so on. In addition to give us a detailed introduction to the drawing process (design - proofreading - review and revision, etc.), a complete set of drawings should include: drawing catalog, drawings of the general description and standards, building construction drawings (general plan, plan, elevation, section, detail, etc.), structural drawings (foundation plan, foundation plan, structural floor plan, etc.), equipment drawings, electrical drawings, and so on. In addition, the teacher also talked about the scope of application of various drawings. Finally, the teacher took out the graduation design for us to watch, and explained to us the problems we should pay attention to when doing graduation design. Finally, he gave us the advice that we should study our professional knowledge so that we can complete the graduation design better.

Through the teacher's explanation, we have a further understanding of the importance of the drawings, so that we approached the language known as the world of engineering. For our future in the project to read the drawings laid a solid foundation.

To truly understand civil engineering, but also must have zero distance contact with the construction, otherwise to truly understand can only be empty talk. In view of this, we went to the campus health care center and academic exchange center construction site to in-depth understanding. The danger of the construction site is relatively large, therefore, before entering the construction site of the health care center, we all put on a helmet, in addition to ensure the safety of the construction, the site with a brick wall enclosure, only through the person in charge of the consent to enter. In addition, in order to ensure the safety of the workers, it was surrounded by green window screens around the formwork and supports. In front of the main project, there is a big sign with the list of project managers and their division of labor, as well as the civilized construction guarantee system, quality assurance system, construction layout plan, etc. The teacher explained to us one by one. The teacher explained to us one by one, and the students actively asked when they encountered places they didn't understand. Into the construction area, we saw the main body of the building, the main body in front of a large open space for the stacking of construction materials, these materials are mainly steel, no cement, sand, stone and other building materials.

We followed the teacher into the side of the stairs while listening to the explanation, first in front of the wall to give us the wall columns, plates, beams, etc., and then, to give us the types of stairs, and the scope of application of each type. We went to a corner, see the wall has a few bars sticking out, the teacher told us is in order to prevent the later laying of the wall and the main wall between the cracks, and after that, we recognize the construction joints to stay and treatment methods (temperature joints, settlement joints, vibration joints), cracks in the concrete has a variety of reasons, mainly temperature and humidity changes, the brittleness of the concrete and the unevenness, as well as structural irrationality, raw materials are not qualified (such as alkali aggregates), and the concrete is a good choice for the construction of the concrete. The main causes of cracks in concrete are temperature and humidity variations, brittleness and unevenness of concrete, as well as structural irregularities, unqualified raw materials (e.g., alkali aggregate reaction), deformation of formwork, and uneven settlement of foundation. During the hardening of concrete, the cement releases a large amount of heat of hydration and the internal temperature rises, causing tensile stresses on the surface. Later in the cooling process, due to the constraints of the foundation or the old concrete, tensile stresses will appear inside the concrete again. The lowering of temperature also induces large tensile stresses at the surface of the concrete. Cracking occurs when these tensile stresses exceed the concrete's ability to resist cracking. Many concrete internal moisture changes are small or slow, but the surface moisture may vary greatly or change drastically, and finally the teacher talked about roof waterproofing (oil-based waterproofing, rigid waterproofing) and roof drainage gutter and slope. Finally, the teacher talked about some other aspects of the problem.

Through these internships, we have a lot of feelings, a lot of harvest. As a new college student, the profession is still only from the books know a little theoretical things, in practice is almost blank, but after this internship, the situation has changed.

Through the internship, I learned a lot of practical knowledge. The so-called practice is the test of truth, through the side station, so that I close observation of the entire housing construction process, learned a lot of very applicable specific construction knowledge, this knowledge is often in the books I rarely contact, rarely pay attention to, but is very important basic knowledge. I firmly believe that through this period of internship, the practical experience gained for my lifelong benefit, in the future, the actual work will continue to be verified, I will continue to understand and appreciate the knowledge learned in the internship, in the future work and study I will be the theoretical knowledge and practical experience I have learned to continue to apply to the actual work, to fully demonstrate the personal value of the self and the value of life. In order to realize their own ideals and bright future efforts.

The internship is very fruitful, really pleased, but this is due to the strong support of the director of the hospital, the teacher's seriousness and responsibility and the enthusiasm of the project leader to cooperate with the feeling of you, thank you for your support!

I, internship time: 20xx-3-19~20xx-4-20

Second, internship unit: Guangdong xx Construction Engineering Co.

Fourth, the internship: xxx

Fifth, a personal summary:

From the internship to the company, I y appreciate the campus life of the good, but also recognize the importance of the theoretical knowledge of the teacher's teaching of the actual operation. Also got a more comprehensive, systematic exercise, learned a lot of books in the classroom can not learn things: how to deal with interpersonal relations with colleagues, how to deal with their own work attitude. In the construction site operation, I y appreciate the importance of the school classroom knowledge. When we learn professional knowledge in school, it is like the basic work needed to construct a building. Because of the lack of experience in the field practice, so I only as a spectator, actively ask all the unknown do not understand the place, seriously think about every problem.

The first day of my internship, because they are unfamiliar environment, unfamiliar people, so they do not understand the work, and do not quite dare to ask them to teach. So the beginning of the time are very uncomfortable. Later, I slowly realized that as long as I treat people with sincerity and ask colleagues for advice, they are also very happy to socialize with me. From this, I y feel the importance of sincerity, in the company not only to learn how to do things, but also to learn how to behave. Correctly handle the relationship between colleagues is very important, it will be related to whether you can carry out the work. Loneliness does not mean that you have personality, too high is very difficult to integrate into the collective. Because although the major in the university is a professional construction, but are theoretical knowledge, practical experience is not enough. And because experience is important for newcomers, but to learn is the most important thing. Therefore, I need to take the initiative to ask the masters questions about everything. Just arrived at the company to work, it is inevitable because of the unfamiliar environment and work content is inevitably a little powerless, and the heart is anxious to learn more specialized knowledge, so some times will inevitably show impatience. Did not come to this is, the work is frequently wrong. Later I realized that, in fact, things can not be too impatient. Anything to be patient, slowly learn, impatience will only get twice the result with half the effort. Of course, in the company to work, not only for people to learn a lot, more importantly, in the professional knowledge to learn a lot of classroom can not learn. My internship was at a construction site in a residential area that was to be built. My job is to settle, in the school did not learn a lot of settlement knowledge, and this time there is an opportunity to learn from the senior master settlement. I am very glad that my colleagues in the company are very friendly and can answer my questions patiently. So I am very grateful and thankful that the company can give me this internship opportunity, this exercise platform. It allows me to learn from my seniors in the construction profession, and also to improve myself and exercise myself well before employment, so that I can be more confident in my ability to work. Of course, I also want to thank the company's seniors for their care and patience during this internship period for me to explain to me, thank them for teaching me. They really taught me a lot of knowledge and reasoning. The society is ruthless, but they let me see that in fact, there are still people in the society who have true feelings.

During the internship, I conscientiously complete the work, after a period of internship, I understand the budget and settlement of the two the same place and different places. Also let me understand why the seniors said that the budget is much more difficult than the settlement on the meaning. Because I am in the company to do settlement work, and settlement time and there are a lot of drawings on the unknown or unclear place is required to go to the scene to understand the situation. And the accuracy of the settlement requirements than the budget is high. Because the settlement is the basis of Party B's request for Party A to deliver the project, so there are many times on the project volume calculation of A and B disagreement. This also determines that we can not be sloppy settlement, must be serious, ready to do a good job. This is when I just took over the settlement work, the predecessor's teachings. So I have always kept in mind, do not dare to forget.

Because my job is to do settlement, so I spend a lot of time doing settlement. Although at this stage I am just an intern, more precisely, just learning. So I need to ask the master for advice on a lot of things I don't understand on the job. Take the calculation of floor area for example, the master always warned me, in the settlement to be a little more careful, especially the axis on the drawings to see clearly. Whether the axes are labeled inside, outside or in the middle has a certain impact on the amount of work. Especially the project is relatively large works, even get along with ten centimeters of the width of the floating line, will should be levied to accumulate a small amount of the arrival of a large number. Once I made a big mistake because of carelessness. Fortunately, I was able to correct it in time without any consequences. Because the most contact in the school is the budget, so for the calculation of the same type of calculation, sometimes will inevitably be used in accordance with the way to do the budget to calculate the inertia. But after all, the settlement is not the same as the budget, there are many changes. Fortunately, the master pointed out the problem in time, and explained to me the difference between the pre-settlement. Before making the settlement, it is necessary to collect and organize the relevant design changes, not only to put an end to fraud, overestimation and overcounting, overcounting and undercounting, but also to adhere to the principle of reason, to protect the legitimate interests of the construction unit and the construction unit of the two sides. Today I finally reacquainted with the meaning of settlement. The budget is just an estimate of the project cost, and the settlement should be done accurately in place, which is the difference between the pre-settlement. Because the site is now under construction is a residential area consisting of six buildings, six buildings above ground room connected, is a very basement. Because of the irregular shape of this basement, in order to accurately figure out the area of this basement, I made many plans to delineate the basement as a regular shape before settling on the final plan for calculating the slab. I thought this would make the basement area easier to calculate. In fact, it was better than before, but there were still some irregularities and bumps. Just as I was depressed about the bumpy places, my predecessor told me that the protruding part can be left out or only half of it can be calculated to make up for the area that is not recessed.

In the site internship, although only in the office to do settlement work, but occasionally free time can follow the masters to the scene to learn. Sometimes, to the scene, even if not personally work, only with both eyes to see, can also let you benefit a lot. Once when I went to the site to see, I happened to see the elevator into the field. The elevator was transported to the construction site by a big truck from the elevator company. I always thought that the elevator entering the site only required a few trips of trucks. After Uncle Yan's explanation, I realized that I was very wrong. Take my construction site as an example, six buildings, two elevators per building, the elevator into the site also need dozens to hundreds of trucks. Straight to say that each floor elevator doors are enough not just a few trips trucks can solve the problem. Elevator installation is an elevator company sent professionals to install. The cost is also by the manufacturer. And the cost of each elevator is millions of packaging into the field of wooden boxes will not be transported back to the company, but also just do waste disposal. Here I think the wooden crates are very improperly handled and are not environmentally friendly. So the elevator are elevator company sent special staff to install, so should be after the installation of the elevator, the elevator packaging wooden box recycling to the company. This will reduce costs and save resources. Although I work in an office and have no influence on the weather. But after coming here, I realized that the original construction process, the weather is good or bad on the construction has a significant impression, originally I just know in the construction program, there is a rainy season construction measures, but I am not clear that there is even a small rain can not work. Now the site is now a lot of places in the finishing, interior wall plastering, exterior wall decoration, garden construction and most of the outdoor work can not be carried out because of the rainy days, but also because of this, the site than in the past to be a little bit cooler.

During the work at the site, I happened to hear the construction workers around me discussing the problem of concrete pouring. In the site of a large area of pouring concrete, a carload of concrete to the site to send, each carload of concrete have a certain amount. For example, a truckload of concrete can be loaded with 9 cubic meters of concrete, but when the car is driven over, a truckload of concrete is simply not enough for 9 cubic meters, but in the settlement of the concrete is based on how many cubes of a truckload of small bills to calculate the total price. If a truckload of concrete is not used up, the rest of the concrete will be shipped back to the concrete company, but still have to calculate the money for a truckload of concrete. So that makes the concrete company very profitable. I asked the builder, why can not be calculated according to the drawings of the amount of concrete pricing, the builder said that this way the concrete company does not recognize the amount of concrete. Here not only to the party to do settlement, but also to some team to do settlement.

Construction internship summary 3

Time flies, soon a month's time is so past. This week's internship is mainly to learn about the construction project bidding knowledge. A construction project it is not to carry out bidding mainly depends on whether its cost is more than 200,000, but more than 200,000 to carry out bidding. Construction project bidding mainly experienced so many stages: bidding, bidding, bid opening, bid evaluation, winning.

Bidding: the need to prepare tender documents, the preparation of documents should have the qualifications of the bidders, requirements, and the requirements of the bidding documents, bid opening time, location, bid deposit and so on and so forth. Bidding is divided into open bidding and inviting bids. The former through the state designated newspaper, information network or other media public release. The latter is generally used for projects with complex technology or special requirements, only a small number of potential bidders can be selected. As well as the design of national security, state secrets or disaster relief, it is not suitable for public tender.

Bidding: the bidding documents should respond to the substantive requirements of the bidding documents. The contents of the tender documents should include The project leader to be sent with the main technical staff resume, performance and proposed for the completion of the bidding project, such as machinery and equipment.

The bidder may require the bidder to submit a tender security in the bidding documents. The bid deposit shall generally not exceed 2% of the total bid price, but shall not exceed a maximum of 800,000 RMB. Bid bond should exceed the bid

Construction Internship Summary 4

As a civil engineering students, we can y appreciate the practice of our temptation, because it will quickly improve our professional ability, as the saying goes, practice is the second classroom of university life, is the source of knowledge is always new and development, is the touchstone of the test of truth, but also college students to exercise the growth of an effective way. Now everywhere in the construction of housing, either residential or office or other role of the structure, we can always see everywhere, but the construction site can not be casually enter, so before it is also a long-distance view, can only see the external structure. Always want to go in and see what's inside. We all know that a person's knowledge and ability to play a role only in practice, in order to be enriched, perfected and developed. College students to grow, we must be diligent in practice, the theoretical knowledge learned and practice together, in practice, continue to learn, constantly summarize, gradually improve, and innovation, and in practice to improve their knowledge, ability, wisdom and other factors into a comprehensive quality and ability to lay a good foundation for the success of their own careers . Therefore, production internship is an indispensable practical teaching link in the teaching program of civil engineering, which is the unification of the learned theoretical knowledge and engineering practice. So the school can give us this opportunity, we all cherish it, and hope to improve our professional knowledge and quality through this internship, laying a foundation for our future work.

According to the arrangement of the college, we had a ten-day civil engineering production production internship. Our group was divided into ××××, the introduction of our eyes is three buildings are under construction, after the introduction of the senior brother only to learn that this building, building No. 1, building No. 2, building No. 3, are low-cost housing. My first feeling is that the cheap house, but later realized that the low-cost housing is the state money to build people's livelihood projects, specifically for some poor groups to build housing. Three tower cranes are working methodically. The visual height has been repaired to thirty meters high. Due to the special geographical location, these three buildings are built on a hillside, from the back to see their foundations to be more than ten meters higher than the road. It looks rather spectacular. There was also a project underway to level the site. Some staff are working hard, there are excavators and slag trucks on the site. Due to the special geology of Panzhihua, the foundations are also some extended rocks, and there are also two stone crushing machines on the site, which are used to break up the rocks. We were outside for a few moments to take a closer look at the site. After taking the helmets, we entered the first building to observe the internal operation under the leadership of our senior brothers. The first thing I noticed was that the space was very small, whether it was the bedroom, the kitchen, or the living room, it all felt very small. All of them are in the layout of one room and one hall. My senior said that this is the rent built for the poor group, all of them are like this, this is also the first time I saw the low-cost housing. Since the workers were all working up there, we stayed on the lower floors for a while and then headed up. Walking up to the top, I saw some workers working on the infill walls, and I could also see the internal reinforcement arrangement of some structural columns. The ones above were still pouring concrete, which was transported up by the tower crane and then pushed by the workers to the side of the construction site to make it easier for them to work. No matter what we do, there are a lot of us is to learn the place, although we have received so many years of education, but are still "weak students", we even the most simple bricklaying are still not good, some more complex more will not, there is a saying: the paper to get the end of the shallow, I think that this is the status of the college students, theoretical knowledge is very rich, but the practice of the district committee know nothing. I think this is the current situation of college students nowadays, the theoretical knowledge is very rich, but the practice of the district committee know nothing. So it is every student's expectation to be able to observe on site. And the school provides us with this opportunity to let us experience the site life before graduation, so we are particularly serious to observe and learn.

Looking back on these days, we really learned a lot of real things and thought about many issues. We have a lot of feelings, but also benefit a lot. The internship in the construction site, can see the construction process of each team, can hear the technical staff for the discussion of the problem, can personally participate in the regular meetings of the project, is our biggest gain. All these made me have a perceptual understanding of the basic situation of project management, and also made a good warm-up for the workplace immediately. Short-term learning in the field has also improved my professional skills.

The following are some of the gains, understanding and thoughts of this internship:

1. Through this internship, the knowledge of the books in the internship process can be digested, for some of the terminology, the specific construction procedures have an in-depth understanding of the consolidation of theoretical knowledge. Previously, the teacher said some knowledge when we do not have this concept in mind, it is difficult to produce a sense of picture, a blank mind, understanding is also half the effort. For example, for the process of steel processing, structural column reinforcement binding, from the previous just listen to the teacher to explain and learn from books, but for the specific operation is not clear. This time in the field to see with their own eyes after the theory with the actual connection is very intuitive, especially impressive. In the internship we will also look at some construction drawings every day, do some electronic documents, these also strengthened our CAD and spreadsheet EXCEL in the project, which is a great help to the future work.

2. In the construction process, many times the actual construction operation and the theoretical knowledge on the books do not necessarily match. Books are the theory of the situation, but the project will encounter many complexities of the actual situation. At this time the books are not suitable, we have to rely on the experience of the staff, these help us a lot, it can improve our ability to improvise. For example: a 400m beam its lower reinforcement for 12φ32, in theory to ensure that the minimum spacing between the steel bar & gt; 25mm, but in practice because of too much reinforcement somewhere and often can not do. This requires years of construction experience with the combination of theoretical knowledge, to make appropriate adaptations. We must learn a good solid theoretical knowledge, a lot of things in the classroom, although they have learned, but we have not learned to be precise, not transformed into their own capital, not be able to learn to use. Whether in the future engaged in construction or budgeting, we need to pay more attention, more observation, more questions, we need to continue to accumulate and collect a wide range of information. We live around, many things are worth to learn to think.

Construction internship summary 5

I have gained a lot in the internship, I learned about the construction of the corridor, measurement and placement, earth excavation, pad construction, waterproofing of the floor, floor construction, side wall, roof construction, lightning protection and grounding works, waterproofing works, decorative works in the corridor, backfilling of earth and stone. I learned a lot of things that I could not learn in school.

Because of the different environments, contact with different people and things, the things learned are different, exercise yourself well, become a useful person to the community originally felt that the release line is a non-technical work, but a week of work so that I changed my mind: 1 release line first of all to be familiar with the drawings; 2 release line can be familiar with the project's specific processes; 3 release line can learn the process of technical specifications of the engineering process to go to the site every day to learn some new knowledge, so that I have to go to the site. Learn some new knowledge, so that I live every day is very fulfilling, learned a lot of school to learn the knowledge, so I benefit a lot, I feel very happy every day.

Learning new skills, watching workers work and then learn from it, from learning to measure the spare time to learn, the quality of each part of how to reach the standard, what kind of problems exist inside, how to rectify. Deeply appreciate the living to learn the meaning of the phrase learning without end, harvested my profession do not understand the other knowledge, so that my own working life is more fulfilling.

The internship is to expand the knowledge of the basics. Learning the main construction process:

1. Measurement of the line with a total station measuring the foundation longitudinal and transverse centerline, put out the upper mouth of the excavation side line piles, the size of the pit excavation should be to meet the requirements of the foundation construction;

2. The pit excavation operation mode to mechanical operation, the use of backhoe operation supplemented by manual clearing, an excavation from the pit bottom surface to be set aside above the 20 30cm, to be checked before the manual clearing to a trench, the bottom surface to be set aside before the trench to the 20 30cm, to be checked. To be checked before the slot manual clearing to the elevation, to ensure that the top surface of the pit solid.

3. Tying reinforcement pit after excavation, tying the foundation of the internal reinforcement, should pay attention to the protective layer of reinforcement, the number of reinforcement, diameter, location, the encryption of the hoop, as well as pre-embedded squatting reinforcement, hoops and the main reinforcement of the layout of the situation in line with the specifications, the plate reinforcing steel spacing in line with the requirements of the drawings, and so on.

4. template production and installation according to the location of the sample accurate installation of solid templates. Brush mold release agent, assembling template should pay attention to the sealing, to prevent slurry leakage. In order to prevent groundwater from affecting the normal operation of the pit, set up drainage ditches and water collection wells in the pit along the perimeter of the base and each corner point.

5. concrete pouring and maintenance of standing mold acceptance, pouring concrete. Control the mixing quality of concrete, concrete using concrete pump delivery pouring method. During the pouring of each layer of concrete, inserted vibrating rod is used to vibrate densely. The vibrating rod should avoid collision with the template. 24 hours after the completion of the foundation concrete pouring, it is necessary to watering maintenance, watering maintenance time of not less than 10 days.

Concrete pouring is really very tired, but learned a lot of basic standards, the road to go later and the future work is still very much play a role in paving the way.

;