Chapter 1 Bidding Instructions…………………………………………
Chapter 2 Contract Conditions ……………………………………………………
Chapter 3 Contract Agreement Terms……………………………………
Chapter 4 Contract Format…………………………………………
Chapter 5 Technical Specifications………………………………………… ………………
Chapter 6 Tender Document……………………………………………………
Chapter 7 Project Budget Document ……………………………………………
Chapter 8 Qualifications and related information……………………………………………………
Chapter 9 Construction Organization Design…………………………………………
Chapter 10 Drawings and Bill of Quantities………… …………
Chapter 11 Bid Evaluation Method…………………………………………
Chapter 1: Bidding Instructions< /p>
1. General Principles
1. Project Description
⒈1 Project Overview: (omitted)
This project has completed the construction drawing design and bidding The unit conducts construction bidding based on the contents of the construction drawings.
Comprehensive description of ⒈2 project:
⒈2.1 Project name: ** project
⒈2.2 Construction location: **
⒈2.3 Structure type and number of floors: (omitted)
⒈2.4 Building area: (omitted)
⒈2.5 Contracting method: Contracting of work and materials
⒈2.6 Warranty requirements: According to the Ministry of Construction Order No. 80
⒈2.7 Quality requirements: Ensure excellent
⒈2.8 Required construction period: The required construction period is **** days.
⒈2.9 Bidding scope: ****.
2. Source of funds: (omitted)
3. Requirements for qualifications and qualifications
⒊1 To perform the purpose of this construction contract, participate in the construction bidding The enterprise (hereinafter referred to as the "bidding entity") must at least meet the qualification level required by item 4 of the previous appendix.
⒊1.1 The construction unit participating in the bidding must be registered with the industry and commerce, and hold an independent legal person with an industrial and commercial business license. The qualifications of the appointed project manager must be grade * or above. After registration, the project manager is not allowed to be replaced without special reasons. If the representative of the bidding unit is not a legal representative, he must hold a "Legal Representative Authorization Letter" (uniform format).
⒉2 Commitment to implement the "Tendering and Bidding Law of the People's Republic of China", "Management Measures for Tendering and Tendering of Housing Construction and Municipal Infrastructure Projects" and "Hunan Province's Implementation of the Tendering and Bidding Law of the People's Republic of China" Bidding Law and Measures, etc.; abide by national laws and administrative regulations, have good reputation and honest professional ethics;
⒊3 In order to be qualified to be awarded a contract, the bidding unit shall provide information that satisfies the bidding unit. Qualification documents to prove that they meet the bidding qualifications and have the ability to perform the contract. To this end, the submitted bidding documents should include the following information:
⒊3.1 Copies of original documents establishing the legal status of the bidding unit [including business license, qualification certificate (in the form of a new certificate issued by the Ministry of Construction) Qualification shall prevail) and project manager qualification certificate, ID card, legal representative qualification certificate (or power of attorney)].
4. Bidding costs
The bidding unit shall bear all costs involved in preparing and submitting bid documents. Regardless of the bidding result, the bidding unit will not be responsible for the above costs.
II. Bidding documents
5. Composition of bidding documents
⒌1 The bidding documents of this contract include the following documents and all documents issued in accordance with Article 7 of this Notice Supplementary information and written records of the bidding Q&A meeting mentioned in Article 13 shall be issued by the bidding party.
The bidding documents include the following contents:
Volume 1 Bidding Instructions, Contract Conditions and Contract Format
Chapter 1 Pre-Tender Instructions Schedule and Bidding Instructions< /p>
Chapter 2 Contract Conditions
Chapter 3 Contract Agreement Terms (omitted)
Chapter 4 Contract Format (omitted)
Chapter Chapter Five Technical Specifications
Chapter Six Tender
Chapter Seven Quotation Form and Project Budget, Chapter Eight: Construction Organization Design
Chapter Nine Qualifications and related information
Chapter 10 Drawings and Bill of Quantities
Chapter 11 Bid Evaluation Method
⒌2 Bidding units should carefully review all the bidding documents Bidding instructions, contract conditions, prescribed formats, technical specifications and drawings. Tender documents that do not substantially respond to the requirements of the tender documents will be rejected.
6. Explanation of bidding documents
After receiving the bidding documents, if the bidding unit has any questions that need clarification, it should submit a written form ( Including written text, fax, etc., the same below) submitted to the bidding agency, the bidding unit will answer in writing (including an explanation of the inquiry, but not the source of the inquiry), and the reply will be sent in writing to all those who have obtained the bidding documents. the bidding unit.
7. Modification of bidding documents
⒎1 Five days before the bidding deadline, the bidding unit may modify the bidding documents by supplementary notice.
⒎2 The supplementary notice will be sent in writing to all bidding units that have obtained the bidding documents. The supplementary notice will be an integral part of the bidding documents and will bind the bidding units.
8. Bid price
⒏1 Bid quotation
3. Bid quotation description
⒏1.1 Bid quotation should be as shown in the quotation table Items listed are listed in detail.
⒏1.2 The bid quotation is the bidding unit’s expected contract price for the bidding project.
⒏1.2.1 The bidding unit shall provide design drawings and submit its own bidding quotation according to the bidding documents according to its actual situation and on the premise of ensuring quality, construction period and not violating relevant national policies.
⒏1.2.2 The bid quotation shall be considered together with the bidding instructions, contract conditions, contract agreement terms, relevant commitments during bidding, technical specifications and drawings. The owner requires a **% discount on the project cost
⒏1.2.3 According to relevant national policies, the bidding quotation cannot be lower than its enterprise cost price.
⒏1.3 The main basis for pricing the bid quotation
⒏1.3.1 The bidding documents and supplementary documents filed and approved by the bidding management agency.
⒏1.3.2 Engineering design drawings and relevant technical information.
⒏1.3.3 Construction site conditions.
⒏1.3.4 Construction plan.
⒏1.3.5 Current budget quotas, fee collection standards and relevant regulations.
The project is based on the quota in **; the installation project is based on the new quota in 2002. The "** Provincial Unified Installation Project Base Price List" and the corresponding charging documents are used to formulate a quotation. There can only be one bid quotation in the bid. .
⒏1.3.6 Price information for labor, materials and construction machinery shifts at the project location.
⒏1.3.7 The price of main materials shall refer to relevant information and market prices.
⒏1.4 Tender quotation fee calculation regulations:
⒏1.4.1********** is not included in the bid quotation according to regulations.
⒏1.4.2 The labor insurance fund is not included in the bidding price.
⒏1.4.3 The bidding quotation does not include special health care fees, non-staple food price adjustment funds, remote construction increase fees, and construction agency relocation fees among the "separately calculated costs".
⒏1.4.4 Adjustment of labor costs and machinery costs shall be in accordance with ***cost management department documents.
⒏2 Bid price adoption method.
⒏2.1 adopts price fixation method.
⒏2.1.1 The bid quotation is a fixed price; the unit price and total price filled in by the bidder will not change due to market changes during the contract implementation period. The bidder can consider a certain risk coefficient when calculating the quotation:
⒏2.1.2 The tenderer does not accept any selective quotations, and only one quotation is allowed for the same project;
⒏2.2 Settlement price method
⒏2.2.1 The settlement price is the contract amount plus the design change visa and the project quantity change price for the construction unit’s on-site management personnel visa. Omissions or incorrect items in the winning bid price will be deemed to have been included in the quotations of other project sub-items during settlement.
⒏2.2.2 The settlement adjustment price shall be based on the same conditions at the time of bidding. That is, the change price = (changed project quantity after review) X (unit price at the time of winning the bid).
⒏2.2.3 If the tenderer adjusts the material standards or changes the bidding scope, the contract price will be adjusted according to the material price and scope approved by the tenderer.
⒏3 Bidding Currency
⒏3.1 The unit price and total price quoted in the bidding document are expressed in RMB.
⒏3.2 The bid price quoted by the bidder in the bid quotation form attached to the bid document shall include construction equipment, labor services, management, materials, installation, maintenance, insurance, policy documents and provisions contained in the contract. All risks, responsibilities and other expenses.
⒏4 There is no guarantee that the lowest bid will win.
IV. Preparation of bid documents
9. Language of bid documents
Tender documents and bidding-related notices between the bidding unit and the bidding unit, Correspondence and documents should be in Chinese.
10. Composition of bidding documents
⒑1 The bidding documents of the bidding unit shall include the following contents:
The bidding documents are divided into commercial bid (clear bid) and technical bid. (hidden mark), technical mark and commercial mark are made separately. 10.1.1 The commercial bid part (four copies, including one original and three copies) contains the following contents:
Tender Quotation Form
Legal Representative Qualification Certificate
p>Letter of authorization
Project budget and bill of quantities
List of main materials and equipment
Qualifications and related information
< p>⒑1.2 Technical bid part (in triplicate, regardless of original and duplicate)Technical bid requirements:
The technical bid is a hidden bid, and the bidder can only stipulate it on the back cover of the bid document Fill in the name of the bidding unit and project and the name of the bidding unit (within the sealing line), stamp it with the official seal, and sign (seal) the legal representative. Use the uniformly provided sealing paper to cut it to the size of the sealing ring within the sealing line. Seal it, and then seal it with the technical standard bottom sealing strip provided by Uniform (the sealing strip is cut into 21 cm * 21 square meters).
The name of the bidder and the content that can identify the bidder shall not appear in the bid document, and no lines, circles, alterations or any artificial marks shall appear on the bid document.
The contents of the bid document are uniformly in Song Dynasty No. 3 font, the text in the table is in Song Dynasty No. 5 font, and the page numbers are in Song Dynasty No. 5 Arabic numerals, uniformly numbered in the middle and lower part.
Technical standards are not cataloged. The text part of the technical bid shall be on A4 paper, and the construction plan, network diagram, plan and measure diagram and other diagrams shall be on A3 paper; both the text part and the diagram part shall be page numbered. Use a black inkjet (or laser) printer to print (or copy), and technical standards should not be printed in color.
The drawing requirements for CAD drawings must comply with the drawing specifications: the font should be in Song Dynasty style, size 5, the font height should be in the sequence specified in the drawing specifications, and the line thickness should be in accordance with the drawing specifications. There is a picture frame, but there is no countersign bar. The title is written at the bottom of the drawing.
Failure to provide technical standards as required will result in zero points.
⒑2 Bidding units must use the table format provided in Volume 3 of the bidding document, and the table can be expanded in the same format.
11. Bid validity period
⒒1 Valid within ** days (calendar days) from the date of bid opening.
⒒2 Before the original bid validity period expires, if special circumstances occur, the bidding unit may request in writing to the bidding unit to extend the bid validity period with the approval of the bidding management agency. The bidder must respond in writing, and the bidder may reject such request without forfeiting the bid deposit.
A bidder who agrees to extend the bid validity period is not allowed to modify his bid documents and needs to extend the validity period of the bid deposit accordingly. During the extension period, the provisions of Article 12 of this Notice on the return and confiscation of the bid deposit still apply.
12. Bid security
⒓1 Bid security is a necessary component of the bidding documents. The bid bond is used to protect the tenderer from losses incurred due to the actions of the bidding unit. The bidder shall provide a bid deposit of no less than the amount specified in item 6 of the previous appendix. This bid deposit is an integral part of the bid document. The bidder shall pay a bid deposit*10,000 yuan (refundable within one week after the bid winning and bid rejection notices are issued).
⒓2 According to the selection of the bidding unit, the bidding deposit can be a check, bank draft, or cash. However, it must be paid into the deposit account of the bidding company two days before the bidding deadline.
Margin account name:
Account opening bank: ****** branch
Account number: *********
⒓3 For bids that fail to submit the bid deposit as required, the bidding unit will regard the bid as unresponsive and reject it.
⒓4 The bid deposit of the unsuccessful bidder will be refunded within 7 days after the bid winning notice is issued.
⒓5 The bid deposit of the winning bidder will be returned without interest after submitting the signed contract agreement and fulfilling the commitment as required;
⒓6 If the bidder has the following circumstances, the bid deposit will not be refunded Return:
⒓6.1 The bidder withdraws its bid documents within the bid validity period:
⒓6.2 The bidder colludes in any way during the bidding process, resulting in the failure of the bidding process. Carry out,
13. Bidding Q&A session
⒔1 The bidding unit sent representatives to attend the bidding Q&A session at 9:30 am on *month*, 2003.
⒔2 The purpose of the bid Q&A meeting is to clarify and answer questions raised by the bidders and to organize the bidders to inspect the site and understand the situation.
⒔3 Survey Site
⒔3.1 The bidder will be invited to conduct a survey of the project construction site and surrounding environment to obtain relevant preparation of bidding documents and signing of contracts that are the responsibility of the bidder. All information required. The costs incurred in surveying the site shall be borne by the bidding unit itself.
⒔3.2 The information and data on the construction site provided by the bidding unit to the bidding unit are the existing information of the bidding unit that can be used by the bidding unit. The bidding unit is not responsible for the inferences, understandings and conclusions drawn by the bidding unit.
13.4 Any questions raised by the bidding unit related to the bid must be sent to the bidding unit in writing before the bid Q&A meeting is held. (Before 9:30 am on the day of the month)
Contact unit and contact person:
Unit: Company
Contact person:
Address:
Telephone:
Postcode:
13.5 Minutes of the meeting, including copies of all questions and responses, will be promptly provided to all persons receiving the tender documents the bidding unit. Modifications to the content of the bidding documents listed in Section 5.1 of this Instruction resulting from the Bid Q&A session shall be issued by the bidding unit in the form of a supplementary notice in accordance with the provisions of Article 7 of this Instruction.
14. Number of copies and signatures of bidding documents
⒕1 The bidding unit shall prepare the technical bid and the commercial bid separately according to the provisions of Article 10 of these instructions, and prepare one copy of the bidding document for the commercial bid. "Original" and three "Copies", and clearly marked "Original of Bid Document" and "Copy of Bid Document". If there is any inconsistency between the original and the copy of the bidding document, the original shall prevail. The technical bid shall be made in triplicate, divided into "original" and "copy".
⒕2 The original and copy of the commercial bid of the bidding document should be written or printed with indelible ink, stamped with the official seal of the legal entity, and personally signed or affixed by the legal representative (or authorized agent) of the bidding unit. The seal of the legal representative (or authorized agent) shall be stamped, and the technical bid shall be in accordance with the requirements of the bidding documents.
⒕3 The complete set of bidding documents should be free of deletions and interline insertions, unless these deletions are made in accordance with the instructions of the bidding unit, or are errors caused by the bidding unit that must be corrected. Modifications shall be certified by the signature and seal of the signer of the bid document.
5. Submission of Bid Documents
15. Sealing and Marking of Bid Documents
Bidders can only place bid documents in the places specified on the back cover of the bidding document (within the sealing line) ) Fill in the name of the tenderer and project and the name of the bidder, stamp it with the official seal and signature (or seal) of the legal representative, and seal it according to the sealing line. The name of the bidder shall not appear in the bidding document, and any content that may lead to the identification of the bidder shall not appear in the bidding document.
⒖1 The bidder shall prepare the technical bid and the commercial bid separately and seal them separately. The original and copy of the commercial bid shall be sealed together, and the seal shall have the seal of the bidder and the official seal of the bidder. The bidding number, the name of the bidding project, and the name of the bidding unit should be indicated on the cover. Technical standards adopt unified special sealing bags and sealing strips. The technical tender documents are packed in a unified special sealed bag, and the sealing strips are affixed to the two seals on the back (sealing surface) of the special sealed bag. There should be no markings on the special sealed bag for technical standards.
⒖2 If the tendering unit fails to seal and mark the tender documents in accordance with the above provisions, the tendering unit will not be responsible for the misplacement or early opening of the tender documents, and the resulting early opening of the tender documents will be rejected or technically The bid is invalid and returned to the bidding unit.
⒖3 Bid documents shall be submitted to the unit and address mentioned in item 10 of the previous appendix.
⒖4 Bid opening list
1) The bid document should include a bid opening list. In order to facilitate the singing of bids during the bid opening, bidders should also submit the bid opening list and bid deposit in separate seals, and mark the envelope with the words "Bid Opening List".
The bidder shall seal the original and all copies of the bid documents in separate envelopes, and mark the envelopes with the words "original" and "copy". All envelopes are then sealed in an outer envelope.
2) Both the inner and outer envelopes should:
①Clearly indicate the address specified in the bidding document;
②Indicate the name of the project and the invitation to bid. Title, number and the words “not to be opened before (bid opening date and time)”, and fill in the bid opening date and time specified in the bidding documents.
3) The name and address of the bidder should be written on the inner envelope so that late bid documents can be returned intact.
4) If the outer envelope is not marked and sealed as required, the bidding agency is not responsible for misdirection or early opening.
Bidders who modify bid documents should also seal and mark them in accordance with regulations.
16. Bidding deadline
⒗1 The bidder shall submit the bid documents to the bidding unit before the date and time specified in item 11 of the previous appendix.
⒗2 The bidding unit may, at its discretion, extend the deadline for submission of bid documents by way of supplementary notice as stipulated in Article 7 of these Instructions. In the above circumstances, all the rights, responsibilities and obligations of the tendering unit and the bidding unit in relation to the bid deadline will be applicable to the new bid deadline after the extension.
⒗3 Bidding documents received by the bidding unit after the bidding deadline will be returned to the bidding unit intact.
17. Modification and withdrawal of bidding documents
⒘1 After submitting the bidding documents, the bidding unit may submit modifications or withdrawals in writing to the bidding unit before the specified deadline for bidding. Notification of its tender documents. Tender documents cannot be changed after the tender deadline.
⒘2 The bidder’s notice of modification or withdrawal shall be prepared and sealed in accordance with the provisions of Article 15 of this Notice. Mark and submit (mark "Modify" or "Withdraw" on the inner envelope).
⒘3 According to the provisions of Article 12 of this Notice, during the period between the deadline for bidding and the expiry date of the bid validity period specified in the bidding documents, the bidding unit cannot withdraw the bidding documents, otherwise its bid deposit will be confiscated.
6. Bid Opening
18. Bid Opening
⒙1 The tenderer shall host a public bid opening at the time and place specified in the bidding documents. The bid opening ceremony will be hosted by the tenderer and attended by members of the bid evaluation committee, bidding units and relevant personnel.
⒙2 The bid opening meeting is organized and hosted by the bidding unit under the supervision of the bidding management agency to check the bidding documents to determine whether they are complete, whether the bid deposit is provided as required, whether the documents are signed correctly, and Whether compiled in order. However, bid documents submitted with a qualified withdrawal notice in accordance with regulations will not be opened.
⒙3 The bidding unit must send a legal representative (or authorized agent) with an original copy of the business license, an original copy of the qualification certificate, and a certificate of qualification for the legal representative of the enterprise (or a power of attorney); the project manager must hold Original project manager certificate and ID card to attend the bid opening ceremony. If the bidder has any of the following circumstances, the bid will be deemed invalid:
⒙3.1 The bid document is not sealed as required:
⒙3.2 The commercial bid does not have the official seal of the bidder and its legal seal Seal (or signature) of the representative (or authorized principal): The seal on the business bid does not match the name on the qualification certificate, and the relevant information, certificates, and supporting materials provided by the bidding unit are false or forged.
⒙3.3 Tender documents are not filled in as required, the content is incomplete or the handwriting is illegible;
⒙3.4 Tender documents are delivered after the bidding deadline;
⒙3.5 The bidding unit fails to send a legal representative (or authorized agent) as required to hold an original copy of the business license, an original copy of the qualification certificate, and a corporate representative qualification certificate (or power of attorney): the project manager holds the project The original manager certificate and ID card are required to participate in the bid opening ceremony;
⒙3.6 The name of the project manager does not match the name of the bidding unit or the person;
⒙3.7 The project manager qualification is below level * ( (excluding those with * grade);
⒙3.8 More than two bid quotations appear in the bid;
⒙3.9 A bid that fails to submit a bid deposit as required in Articles 12.1 and 12.3 ;
⒙3.10 Bidders who collude to raise or lower their bid prices violate the relevant provisions of the Bidding and Bidding Law of the People's Republic of China;
⒙4 The bidding unit shall announce the verification results in public, and read out the name of the valid bidding unit and the bid price.
7. Bid evaluation
19. Confidentiality requirements for bid evaluation content
19.1 After the public opening of the bid, until the award of the contract to the winning bidder is announced, all Information related to the review, clarification, evaluation and comparison of bids, and information regarding the award of a contract, shall not be disclosed to the bidder or to other persons not involved in the process.
19.2 During the review, clarification, evaluation and comparison of bid documents and the award of the contract, any behavior of the bidding unit that exerts influence on the bidding unit and other members of the bid evaluation committee will result in the cancellation of the bid. qualifications.
20. Bid evaluation principles and methods
20.1 Bid evaluation work should follow the principles of fairness, impartiality, science and merit.
20.2 The bid evaluation committee will only evaluate bid documents that substantially respond to the requirements of the bidding documents in accordance with these instructions. and Municipal Infrastructure Project Construction Tendering and Bidding Management Measures, Order No. 12 "Interim Provisions on the Bid Evaluation Committee and Bid Evaluation Methods" jointly issued by seven ministries and commissions, and "**Provincial Measures for the Implementation of the Tendering and Bidding Law of the People's Republic of China and the State", etc. Provisions are enforced.
⒛3 The specific implementation method shall be in accordance with the provisions of the comprehensive evaluation method in the Xiangjianjianzi (2002) No. 394 document. And set bonus points in the competency and credibility score table to comprehensively evaluate the score ranking of bidding units.
⒛4 The bid evaluation procedure is divided into preliminary evaluation, detailed evaluation, recommendation of winning candidates and bid determination.
⒛4.1 Preliminary review: Based on the bid evaluation standards and methods specified in the bidding documents, the bid evaluation committee will systematically conduct a preliminary review and comparison of the bid documents to determine the unqualified bidders and the bids that have entered the detailed evaluation stage. list of people.
⒛4.2 Detailed review: Based on the bid evaluation standards and methods determined in the bidding documents, the bid evaluation committee will further evaluate, compare and determine the bidders on the technical and commercial parts of the bid documents that have passed the preliminary review. ranking order.
⒛4.3 Recommendation of bid-winning candidates and determination of bids: The bid evaluation committee recommends a list of bid-winning candidates and submits a written bid evaluation report. The bidding leading group will determine the winning bidder among the winning candidates based on the bid evaluation report.
⒛5 The content of the technical part of the bidding document (technical bid) is the construction organization design part required to be provided in the bidding document: the content of the business part (commercial bid) is other than the construction organization design required to be provided in the bidding document. other parts. The technical bid shall be hidden and the commercial bid shall be made explicit. The technical bid shall be evaluated first and then the commercial bid shall be evaluated.
Technical bids must comply with the relevant format provisions in the bidding documents; technical bids that are not provided in accordance with the requirements will be awarded zero points. The technical bid seal will be opened during the summary calculation of bidder scores during the detailed review stage.
⒛6 The bidder for this project sets a minimum bid price, and the benchmark price during bid evaluation is calculated as follows:
A: +A: +A, +...An
Basic price two B*30% ten (A1+A2+A3+.+An)/N*70%
B is the bidder's base price. An is the bid quotation that enters the arithmetic average, and N is the number of bid quotations that enters the arithmetic average.
When the highest bid price is ≥1.04X the highest bid price, the highest bid price will not be included in the arithmetic average bid price; when the lowest bid price is ≤0.95X the lowest bid price, the lowest bid price will not be included in the arithmetic average bid price. The bids entered into the arithmetic mean: The bids in other cases are entered into the arithmetic mean.
The bid evaluation committee shall submit a written bid evaluation report and recommend the winning candidate within ten days after the bid opening. The tenderee shall publicize the recommended bid-winning candidates on the designated media for ten days from the date of receipt of the bid evaluation report and the list of recommended candidates. The tenderer shall determine the winning bidder within ten days from the expiration of the publicity period.
⒛8 Principle of winning the bid: The bid evaluation committee evaluates bids in accordance with the provisions of the comprehensive evaluation method in Document No. **********, and recommends ranked bid-winning candidates according to their scores.
8. Contract Award
21. Contract Award Criteria
The bidding unit will award the contract to the bidder with the best comprehensive comparison and determine it as the winning bidder. Must have the ability and resources to implement this contract.
22. Notification of winning the bid
22.1 After the winning bidder is determined and before the bid validity period expires, the bidding unit will notify the winning bidder in writing that its bid has been accepted. In this notice (hereinafter referred to as the "Bid Winning Notice" in the contract conditions), the bidding unit's winning bid price (called the "contract price" in the contract conditions) for the winning bidder to implement, complete and maintain the project in accordance with this contract, as well as the construction period, Quality and the date and place of signing of the relevant contract.
22.2 The bid winning notice will become an integral part of the contract.
22.3 The bidding unit will promptly notify other bidding units of the unsuccessful bid results.
23. Signing of the contract agreement
The winning bidder shall have its legal representative or authorized agent sign with the representative of the tenderer according to the date, time and place specified in the bid winning notice. contract.
Chapter 2: Contract Conditions
The contract conditions of the "Public Bidding and Bidding Documents for Construction Projects" are adopted from the "Construction Project Construction Contract" issued by the State Administration for Industry and Commerce and the Ministry of Construction. (GF-1999-0201) Contract Conditions.
Chapter 3: Contract Agreement Terms (omitted)
Clear requirements during bidding:
Default on construction period:
Commitments during bidding The construction period is the contract period. The actual construction period is one day later than the contract period (including visa extension period) and is delivered for use. A penalty of 20,000% of the total construction cost will be imposed every day.
Project quality:
This project implements high quality and low price to ensure excellence.
The construction party must obey the management and arrangements of the construction party, and work closely with other professional construction parties, and must not pass the buck. Otherwise, the construction party has the right to terminate the contract, and the construction party will be responsible for all losses.
Chapter 4: Contract Format (omitted)
Chapter 5: Technical Specifications
1. On-site natural conditions: (omitted)
< p>2. On-site construction conditionsThe on-site construction conditions of the project shall be inspected by the bidding unit. This project is located in ** District of *** City. Construction water, electricity and relevant exploration data have all met the construction conditions.
3. Technical requirements
1. Design:
⒈1 The design unit of this project is ** Design Institute, and the construction drawing design has been completed. The main technical requirements are detailed in the fourth volume of drawings.
⒈2 Design change: For details, please refer to the design change information of the design institute.
⒈3 The seismic design is six degrees.
2. Technical requirements:
⒉1 Strictly follow the current national design, construction, installation standards and technical specifications, and construct in strict accordance with the drawings.
⒉2 Pay attention to foundation treatment during construction.
Must work closely with designers to resolve problems in a timely manner.
3. Materials:
⒊1 All construction and installation materials must have factory certificates and test reports, and meet relevant national and industry standards. The main construction and installation materials must be provincial and ministerial quality products.
⒊2 The main materials required for the project must be of a grade and price approved by the tenderer.
4. Quality standards:
The quality of this project must be excellent.
Chapter 6: Tender and Tender Appendix (Commercial Tender Part)
Tender
Construction Unit: -------—— ——————
1. According to the received bidding documents for the —————————— project with the bidding number ————————,
In compliance with the provisions of the "Management Measures for Bidding and Bidding for Engineering Construction", our unit inspected the site and studied the bidding instructions, contract conditions, technical specifications, drawings, bill of quantities and other relevant documents of the above-mentioned project bidding documents. Finally, we are willing to use the bid quotation in the bid quotation table——————————————.
2. Once we win the bid, we guarantee that the entire project will be completed and handed over within ----------- days (calendar days), and that the quality will meet our commitment to excellent projects. Warranty period————————————year.
3. If we win the bid, we will bear legal responsibility in accordance with the terms of the contract and the commitments in the bidding document.
4. We agree that the bid documents submitted are valid within the bid validity period specified in Article 11 of the "Tender Instructions". During this period, our bid may be successful, and we will be bound by this. .
5. Unless otherwise agreed and effective, your bid winning notice and this bidding document will constitute a contract binding both of us.
6. We are willing to submit a bid deposit of 30,000 yuan together with this bid.
7. If the tenderer adjusts the material standards or changes the bidding scope, the bidding unit agrees that the winning price will be adjusted according to the material price and scope approved by the tenderer.
8. If we win the bid, we will submit a performance bond in accordance with regulations as a guarantee for assuming responsibility. If not submitted, the tenderer has the right to disqualify us from winning the bid and refuse to return the bid deposit.
9. We promise that the project manager, technical director, constructor, and quality safety officer stated in the bid will not be replaced during the construction process and must work on site; under special circumstances, after Replacement and departure from the site must be approved by the construction unit. If the construction unit discovers that our unit is affiliated or subcontracted during construction, the contract can be terminated and the performance bond will be confiscated.
Bidder unit: (seal) Unit address:
Legal representative: (signature, seal) Postal code:
Telephone: Fax:
p>
Name of opening bank: Bank account number:
Address of opening bank:
Date: Month and day, 2003
Bid opening list
< p>Name of the bidding unit:Serial number project name
The total bid price is: (uppercase RMB):
(lowercase RMB):
< p>Please put the bid opening list in a separate envelope for easy bidding.(Put it into the commercial bid)
Quotation form
Construction unit name:
Tender document number:
Serial number project name
p>l Bid quotation (uppercase)
Amount unit: RMB
2 Required construction period (calendar days)
3 Warranty commitment
p>4 Quality Level
5 Bid Security
6 Project Manager
7 Project Manager Qualification Level
8 Remarks< /p>
Tendering unit: (seal)
Legal representative: (signature, seal)
Year, month and day
Note: Quotation The form is bound in the business bid;
Legal representative qualification certificate
Unit name: -------——————
Address: ——————————————
Name: ————————————Gender: —---- Age: — -------------------------- Position: --------------------------
Department -------------------------- —’s legal representative. For construction, completion and warranty projects, sign bidding documents for the above projects, conduct contract negotiations, sign contracts and handle all matters related thereto
Hereby certify.
Tendering unit: (seal) Superior authority: (seal)
Date: year, month, day Date: year, month, day
Authorization letter< /p>
This power of attorney declares that I, ------- ------- (name), am ------- ------- (name of the bidding unit) The legal representative of the company is hereby authorized to entrust ----------------------- (name) of (unit name) to be the agent of the company, In the name of the company, participate in the bidding activities of the ----------------------- project of ------- (tendering unit). I recognize all documents signed by the agent during the process of bid opening, bid evaluation and contract negotiation and all matters related to them.
The agent does not have the right to delegate. Hereby entrusted.
Agent: Gender: Age:
Unit: Department: Position:
Tendering unit: (seal)
Legal representative Person: (signature, seal)
Date: