Carpentry labor subcontracting contract model 5 articles

Carpentry is a type of work for the owners to complete various wood projects in the process of house decoration, so do you know how to write a carpentry contract? What do you need to pay attention to? If you are not sure, the following is the carpentry labor subcontracting contract I prepared for you, just for reference!

↓↓↓↓ Click to get more " labor contract "↓↓↓↓↓

★? Temporary labor contract ? ★

★ Construction Labor Contract ★

★ ? Construction Bridge Labor Subcontract ? ★

★ Difference between termination of labor contract and dismissal ★

Carpentry labor subcontracting contract model 1

Issuing party: (hereinafter referred to as party A) Contracting party: (hereinafter referred to as party B)

According to the needs of the project, party A will be the template and installation works contracted to party B construction, in accordance with the "Chinese people's *** and the State Economic Contract Law" and "Construction Management Regulations" and the provisions of relevant laws and policies, combined with the actual situation on the site, the two sides fully negotiated, clear responsibilities, rights and benefits of the relationship between the two sides reached the following terms, both parties *** with the compliance with the implementation.

I. Contracting content

Party B to contract in the form of labor contracting workers apartment and building template installation and demolition of all works.

Second, the price of contracting staff apartments and complex buildings according to the drawings and changes in the drawings of the actual operation of the concrete and formwork contact area, calculated in yuan per square meter.

Third, template and support

This project template staff apartments and complexes Party B must provide two complete sets of templates, peripheral plate and column mold new plate, other allowed to use the old plate, Party A to provide steel pipe, fasteners, the rest of the part are taken care of by Party B. The complexes of three sets of beam bottom. Among them, three sets of beam bottom in the comprehensive building. Bottom mat does not require the use of channel steel, Party A needs to be compacted and leveled, Party B with a plate mat steel pipe.

Fourth, the payment method

Each building each layer of concrete poured after the payment of $ living expenses, after the second floor according to the amount of work done 60% of the settlement; the end of the main structure to pay up to 70% of the project (including previously done

Fifth, the work period

Party B must be signed every month and Party A progress plan for the month, it must be completed in good quality and quantity, or all the work loss by Party B. Bear. (Such as project payment arrears except)

Six, the responsibility of both parties

Party A responsibility:

1, provide the project drawings and the corresponding design changes.

2, provide templates according to the chapter of the required horizontal elevation, axis sampling.

3, to provide the construction site required electricity, wire, lighting.

4. Provide accommodation, canteen, bed.

5, welded wall panels positioning steel, pry bar reinforcement, cement brace provided by the party.

6, such as steel pipe, fasteners can not be supplied in time, should be postponed and bear the corresponding loss of carpentry

7, if Party A caused more than half a month of stoppage (including half a month) to allow Party B to leave the site,

Party B responsibility:

1, Party B must be every day and Party A of the day's time sheet, do the end of each month the payroll to the Party. Workers' wages are directly issued by Party A to the workers, all incoming personnel shall provide body

2, quality requirements: according to the map of construction, construction norms, operating norms, the national quality inspection and evaluation standards for the organization of construction. Ensure that the acceptance of a one-time pass, fail each 1000 yuan fine.

3, the team leader must be the class of personnel for the safety and technical briefing, three safety education, the implementation of pre-shift, class, class quality inspection, to eliminate quality problems.

4, must comply with the "safety first, prevention-oriented" approach to production and production safety regulations, prohibit illegal command and illegal operation. Otherwise, the safety accidents caused by their own party B self-care, within 30,000 yuan party A is not responsible (more than 30,000 yuan in the case, party A paid 50%, party B paid 50%).

5, must obey the Party management personnel unified command and arrangement, must comply with the company and the Ministry of the project rules and regulations, and at the same time to actively cooperate with the other team work, mutual agreement, good solidarity, maintenance of the rights and interests of the Party and do a good job of product protection and other work.

6, such as mold explosion, bursting Party B self-care. Dealing with excessive problems, all material losses are paid by Party B at the price.

7, Party B does not provide material invoices machine labor, does not provide any construction materials.

This contract is in duplicate, Party A and Party B each take a copy of the contract from the date of signature of both parties to enter into force, in the validity of the contract both parties shall comply with the terms of the contract, unilateral breach of contract shall bear the corresponding responsibility.

Signature of the representative of party A: Signature of the representative of party B:

Date: Date:

Carpentry labor subcontracting contract model 2

Party A:

Party B:

The project is the Zhongqing Caixiang Plaza (location: the former Caixiang School), through the consultation of the two sides, party B voluntary To contract party A the project carpentry labor and part of the small material works. In line with the principle of equality, mutual benefit, fairness and voluntariness. The following contract *** with the same compliance.

First, the content and scope of the contract:

1, the project building construction drawings and design changes. Specific parts (including such as the occurrence of other parts not within the scope of the contract, should be part of the scope of the contract)

2, tools: Party A only provides a large circular saw, Party B brings its own hand saws, cables, drills, raincoats, crowbars, and other carpentry tools required to use.

3, safe and civilized construction: into the construction site must wear a helmet, not allowed to drink bareback into the construction site operations, is strictly prohibited to bring children into the construction site, violators are fined 20 yuan / times. Construction site does not allow fighting, theft, overhead lifting and other behaviors, the lesser each time the fine of 500 yuan / time, the heavier handed over to the public security organs to deal with.

4, Party B must listen to the owner, supervision, Party A construction personnel management, compliance with professional ethics. Fang can carry out operations (eg: demolition template time).

5, such as workplace accidents, each time 200 yuan or less by Party B to pay the cost. Second, the operating procedures and quality:

1, frame, vertical rod spacing is not greater than 1.1m, should be set up sweeping rod and support shear, beam floor, leveling rod must be set up on the horizontal rod, forbidden to connect with the outer frame, the intersection of the beams must be played top support (conversion layer according to the requirements of the Party to reinforce the construction operation).

2, the displacement of base plate is not more than 3mm, the flatness of cast-in-place plate is not more than ±5mm, yin and yang corners must be vertical, straight and square, and the dislocation is not more than 2mm.

3, the first hoop of column is not more than 25㎝ of the floor, the rest of the standard layer is vertical according to the wall limb of 60㎝, 70㎝, 80㎝, and the spacing is not more than 45㎝, and the outer wall, inner wall, and the bottom mold are put on the double-side adhesive, and a control must be set up under 25㎝ of the floor of the outer wall. 25㎝ must be added to set a control rod hoop for the next layer of old wall pre-buried service to ensure the quality.

4, one month standard layer completed 7 layers.

5, side mold, hanging mold height is larger than the actual size of 2㎝ material, axis deviation of 5㎜, greater than 40㎝ beams pulling a silk rod, hanging mold is not allowed to pull wire support on the rebar, it must be in the cast-in-situ template to pull wire support, toilets, kitchens, balconies and other parts of the hanging mold must be on the wooden side of the template can be operated.

6, column, shear wall height according to the actual size of 1㎝ material, greater than 1㎝ seam by Party B is responsible for plugging, less than 1㎝ by Party A is responsible for plugging.

7, all the holes of embedded parts are made by Party B to support (such as: flue, release holes, channel steel holes, tower base, etc.).

8, each layer of the template cleaned up before installation, rotten must be replaced.

9, all templates burst mold, collapse mold 50 yuan starting price, Party B to deal with in place not priced.

10, each layer of owners, supervisors, Party A acceptance, Party B must be present.

11, pouring concrete must be someone on-site mold protection, otherwise 300 yuan per layer / layer, another person to protect the mold.

12, Party B must be supervised by the owner of the quality of the progress of Party A requirements for construction, otherwise Party A has the right to terminate Party B contract, Party B unconditionally withdrawn from the site, pricing according to the terms of the four payment.

Third, unit price table: unit price per square Remarks (according to the actual then area settlement)

Non-standard layer of yuan / ㎡

Conversion layer of yuan / ㎡

standard layer of yuan / ㎡

silo (standard layer) of yuan / ㎡

ladder room of yuan / ㎡

part of the support molding according to the (completed and qualified) 60% / ㎡, demolding according to the 40% / ㎡. Midway out of the 60% / ㎡ settlement of the completed qualified works (one month to pay off).

Fourth, the payment method:

30th of each month to tie the account, before the 15th of the next month to pay the last month's wages, the day after the completion of the project to pay off.

V. Materials:

1, Party A provides nails, wire, the cost of costs deducted from Party B's salary for the month.

2, indiscriminate sawing wood square, wood template founders. Wood square fine 20 yuan / article, wood template 100 yuan / article. Deducted from the month's wages. Pouring board.

3, the roof should be categorized and stacked neatly according to the place designated by Party A for materials.

4, the construction site to do the work is done.

Six, contracted to work on the project, after signing the contract to pay a deposit of 500 yuan (to complete a floor 3, demolition of cast-in-place board must stay shelf operation, never allow shelf demolition after demolition of the present, take the wages when the deposit is returned), such as not on time into the field, halfway out of the field. The deposit is not refundable.

Seven, this contract in duplicate, the A and B parties each a copy, signed into effect, after the completion of the project, the wages paid naturally expire.

Party A:

Party B:

Carpentry labor subcontracting contract model 3

Issuing unit: (referred to as Party A)

Contracting unit: (referred to as Party B)

According to the "Chinese People's **** and the State Contract Law" and the "Chinese People's **** and State Labor Law" and the relevant provisions of the laws and regulations of this industry. Follow the principle of equality, voluntariness, fairness and honesty, the two sides on the Langxiang Di project carpentry project matters, by mutual agreement, reached agreement, and hereby enter into this contract.

Article I: Project Overview

1, Project Name: Langxiang Di

2, Project Location: Shenyang City, Yu Hong area.

3, the scope of the contract: carpentry works and site scope of ancillary works in the carpentry works, carpentry nails and wire. (Including a variety of reserved holes to stay and blocking, other types of work with the placement of water-stopping boards, timber loading and unloading trucks, carpentry materials used for loading and unloading trucks, demolition of templates, wood in the position specified by the Party A classified stacked neatly. Trimming and nailing of turnover materials for carpentry. Chiseling caused by rising mold. Temporary facilities and civilized construction work content)

4, contracting form: labor cost. Negative one yuan per square meter. Above a layer of yuan per square meter. (Crane workers, elevator workers by the party through a equipped, the cost is shared proportionally)

Article II: unit price and payment:

1, 20_ years to pay the amount of work completed, the main body of the six layers of the top of the acceptance of the completion of the amount of work to pay 80% of the amount of work completed

2, the main body of all the top of the acceptance of the amount of work paid up to 90%.

3, 95% after completion and acceptance.

4, the warranty period is paid to 100%.

Article 3: Project period: September 2, 20_ - November 30, 20_.

Article 4: The scope of responsibility of Party A

1, supervise Party B to enter the site according to the schedule, and complete the construction tasks according to the requirements.

2. Party A is responsible for providing Party B with all kinds of construction machinery and tools, materials and drawings used in the construction process. Do a good job before the construction of construction technology and technical guidance.

3, Party A sends specialists to monitor the quality of the construction process.

4, according to the contract to pay for the work.

Article 5: the scope of Party B's responsibility

1, Party B obey Party A unified management.

2, Party B sent site representatives, responsible for dealing with the construction process, according to Party A's requirements for the formation of quality management team, strict implementation of Party A's construction program, construction requirements, on-time completion.

3, Party B in strict accordance with the drawings and Party A's technical delivery of careful construction, send a full-time staff to check the quality of each day's work acceptance.

4, Party B shall not arbitrarily damage and waste Party A materials, wood, wood support, templates, etc. in the case of Party A has a similar size of raw materials, shall not be arbitrarily cut off. Violators are fined 200 yuan each time. The turnover materials such as clamps, wall bolts, etc. shall be given 3% loss. Exceeding part of the compensation according to the original price. Return the special tools in time after use, and compensate for the loss at the original price. Maintenance of their own use of tools, protect their own use of materials, to do the work is done, civilized construction.

5, Party B according to Party A request for payment procedures to fill in the form of request for payment, such as information is not fully responsible for Party B (including request for payment, on-site staff have signed the real name of the payroll)

6, due to the Party B supporting the mold is not strict caused by the slurry, leakage of concrete by the Party B is responsible for cleaning up. If the cleanup is not timely damage caused by Party B compensation.

Article 6: Project quality requirements:

1.

2. In the construction project, if Party B causes quality accidents, Party B will be responsible for all the costs. Party A will impose a fine according to the severity of the accident.

3, the project according to the state-issued "construction acceptance specification" and "construction and installation quality inspection standards" as the basis for project acceptance.

Article VII: Engineering Maintenance

The warranty period of this project is calculated from the date of handing over procedures for the project. The period is one year. In the warranty period, due to quality defects caused by construction, Party B should be repaired in a timely manner. If you do not repair or repair is not timely, Party A will send someone to repair, the costs incurred in the warranty deducted.

Article VIII; Party A and Party B should be responsible for production safety

A, Party A should be responsible for

1, the organization of the construction staff to enter the site of Party B for compliance, rules and regulations of safety education. Check Party B's construction team leader and special types of operators, must be qualified by the relevant departments of the higher training exams and licensed to work.

2, the new party B construction personnel, "three-level education", only after passing the examination.

3, Party A to provide all safety facilities and safety tools, appointing specialists to check the safety facilities, the division of the project for the delivery.

4, the operation behavior of Party B workers to implement safety checks, violations of discipline personnel to investigate and deal with.

Second, Party B's responsibility

1, grasp the safety of civilized construction, the implementation of standardization, standardization of the construction site, subject to the management of Party A personnel, with the management of Party A's inspection and supervision of the work. For illegal operation initiative to accept punishment, found hidden dangers in a timely manner to rectify, the construction of safety problems encountered in a timely manner to the A party personnel report. If the safety accidents are caused by your own reasons, Party B will be responsible for them, and any expenses incurred will be borne by Party B itself.

2, Party B must set up a safety officer, responsible for on-site construction safety management, according to the construction design or construction program to do a good job in parts, sub-projects, sub-species of targeted specific work, safety and technical delivery must be stored and checked.

3, for the project or Party A to provide life, production facilities, equipment, Party B is not allowed to unauthorized demolition, alteration.

4, construction personnel reasonable use of helmets, seat belts and other protective equipment, otherwise the resulting safety accidents by Party B is responsible for.

5, in the construction site, living area is strictly prohibited fighting, especially not allowed to fight. If there is a violation of both the team leader and the parties involved in a fine of 1000 yuan, the circumstances are serious and sent to the local public security departments.

6, strengthen the fire, not allowed to use electric stoves and other electric heating equipment heating, cooking, boiling water, not allowed to urinate and defecate in the building. Strictly abide by the rules of law and order, fire prevention system, traffic laws and regulations, and obey the security personnel inspection and management.

7, the site is strictly prohibited theft, found stealing steel fined 1,000 yuan, found stealing wires fined 3,000 yuan, serious cases sent to the local public security organs.

Article 9: Liability for breach of contract and dispute resolution.

1, this contract from the conclusion of the effective date, A, B both sides must fully fulfill the obligations set out in the contract, no party shall not change or cancel the contract without authorization.

2, A, B due to the responsibility of a party caused by the contract can not be performed or can not be fully performed, by the responsibility

3, A, B in the performance of the contract in the process of dispute resolution in accordance with the relevant state regulations and provisions.

Article 10: the number of copies of the contract

This contract is two copies, A and B each take one.

Article 11: the contract period

This contract shall enter into force after both parties sign it, and the contract shall expire after the warranty period is over and the project is paid off

Party A: Signature of the person in charge :

Party B: Signature of the person in charge :

Month and year:

Carpentry labor subcontracting contract model 4

Party A:

Party B:

Party A will undertake the construction of Dongsheng street Dongsheng three phase low-cost housing two standard section (5# building) ceiling single project, contracted to Party B to use the way of package construction. In order to clarify the content of the project and the responsibility of both parties, in line with the principle of mutual assistance and equality and mutual aid, based on the circumstances of the project, agreed on the following terms, *** with the compliance with the implementation of:

Article 1: Project Overview

Name of the project: Dongsheng Street, Dongsheng three low-cost housing, second section of the 5 # building Construction location: Dongsheng a pole flag Construction content: stores, aisles, kitchens and bathrooms, ceiling Contracting method: Labor cost single package. Party A to provide the above contracted content of the main materials required, Party B to provide the completion of the above contracted content of the auxiliary materials required (Note: nails, helmets, construction of the necessary tools, buckets and temporary electricity, etc.).

5, construction period: months of calendar days. According to the actual situation on the site, the construction arrangements for the flow of work, the duration of Party A arranged by Party B to sign the confirmation of the progress of the plan shall prevail.

Article II: labor compensation settlement payment mode

1, contracting unit price: comprehensive above contracting content and contracting methods, ceiling according to the yuan/square meter (this unit price for the tax price).

2, the amount of work: according to the actual construction area to receive the party for settlement.

3, the amount of work to confirm: the foreman to receive the party's signature, Party A designated the person in charge of the site audit signature shall prevail.

4, payment method:

1) 25th of each month, Party A on-site verification of the amount of work completed by Party B, the beginning of the next month to pay the cost of the amount of work completed in the month of 70% of the amount of money as progress payments, and so on.

2) Party B in accordance with Party A's plan to complete the construction tasks on time, within one month of completion of the project, Party A to pay Party B to complete the project as 80% of the total cost of progress payments; increase 10% as a reward; such as can not be completed in accordance with Party A's plan to complete the construction tasks on time, within one month of the completion of the project, Party A to pay the Party B to complete the project at a cost of 60% of the total cost of 10% deduction as a penalty.

3) to be completed after acceptance of the project, Party B construction of the volume of work for the receipt of party confirmation, to be signed by both parties to confirm, within one month to pay to the completion of the volume of work of 95% of the total cost of the remaining 5% as a warranty, from the date of completion and acceptance, within two years, no quality problems. Party A will pay the remaining 5% to Party B without interest.

Article 3: responsibilities of both parties

I. Party B's responsibility

1, in the contract to complete the contract construction tasks have the right to obtain the appropriate terms of labor remuneration;

2, in the performance of this contract due to Party B's reasons for the occurrence of accidents occurring in the work of safety by Party B to bear;

3, in the performance of the contract to have the right to the construction of defective drawings, safety and quality hazards, such as proposed modifications, rectification and improvement of opinions. In the fulfillment of this contract, the right to make modifications and corrections to the construction drawings defects, safety and quality of hidden dangers, the right to refuse to work in unsafe conditions.

4, must be in accordance with the construction drawings, construction specifications, quality and quantity to complete the construction tasks identified in this contract. Through self-inspection, mutual inspection, special inspection to acceptance, the implementation of the "three inspections and one inspection" system shall not leave the construction quality of hidden problems, to ensure the quality of construction.

5, must strictly abide by national safety regulations, strict organization of safety construction seriously accept the addition of that three-level education and safety and technical briefings, and effectively prevent safety accidents;

6, must accept the Party A supervision and management of safety and quality, Party A put forward the views of the Party B should be immediately rectified;

7, must comply with national laws and regulations, the representatives of the Party B should be effectively take responsibility, strict management, shall not be in the construction of the construction of the Party B, and shall be strictly controlled. Responsibility, strict management, shall not occur in the construction site fighting, theft, gambling, prostitution, prostitution and other illegal and criminal activities.

8. Labor remuneration must be paid on time and in full in place, and shall not be withheld, arrears of wages, and accept Party A's supervision. If the arrears of wages, after verification by both parties, Party A will directly pay the wages of workers, double deducted from Party B's project payment.

9, Party B shall not use child labor and not suitable for high-altitude crime industry workers, special types of work must be licensed.

10, Party B construction personnel into the construction phenomenon must wear a good helmet, high work must be fastened with a safety belt. Party A management personnel inspection found Party B construction workers did not wear helmets as required, did not fasten the seat belt, Party A to give Party B 200 yuan per person as a penalty, deducted in the project payment.

11, Party B should pay attention to clean up at any time within the scope of their own construction of the main materials, auxiliary materials, semi-finished products, hand-picked categorized.

12, Party B should be six days in advance of the material plan, so that Party A acquisition. If the proposed material plan is not in line with the actual material idle or waste, Party B compensation for all the resulting economic losses.

13, Party B should have the ability to manage safety, in the construction project, such as the occurrence of safety accidents of less than 10,000 yuan or due to safety violations were fined more than 5 times Party A has the right to reduce the contract unit price of 10-20% or terminate the contract.

Second, Party A's responsibility

1, Party B's construction progress, quality supervision and management, supervise and urge Party B to conscientiously fulfill their contractual obligations;

2, Party B supervision and management of safe and civilized construction, supervise and urge Party B to conscientiously implement the various safety management measures, and to effectively prevent the occurrence of various types of accidents;

3, supervision and inspection of Party B's representative to pay the full amount of labor compensation, not to default on labor payments. Labor remuneration, shall not default on wages of laborers;

4, supervision of Party B's representatives to strengthen the management of laborers, and timely supervision to deal with the occurrence of violations of law and discipline;

5, the right to pursue Party B's breach of contract in accordance with the provisions of this contract and the state law;

6, the fact that the Party B and its representatives can not be proved to be unable to accept the supervision or performance of the contract, the Party has the right to unilaterally change or terminate the contract;

6, Party B and its representatives cannot accept the supervision or performance of the contract, Party B is entitled to Unilaterally change or terminate the contract;

7, according to the time limit agreed in this contract, standard, proportion of labor remuneration, no arrears;

8, according to the agreement of this contract to deal with the occurrence of industrial accidents.

9, seriously implement the three levels of education and safety and technical delivery.

Article IV Quality Requirements

The quality of Party B's construction must meet the requirements of GB50210-20__ "Quality Acceptance Specification for Building Decoration and Renovation Works", "Acceptance Standard for Chengdu Residential Engineering Subdivision", design drawings and relevant norms of Chengdu City.

Article V Project Warranty and Service

1, the warranty period, warranty period since the completion of the project acceptance and Party A in the acceptance of the certificate of signature date of the calculation, according to the national provisions of the warranty terms, the warranty period of two years.

2, the scope of responsibility for warranty: In addition to Party A's use of the process of damage, third-party intentional or unintentional damage, natural disasters and human resistance to damage, where the quality of Party B's construction and acceptance of the handover of Party B's custodial disadvantage caused by damage to the scope of damage to the scope of the project damage and construction quality is poor and can not meet the requirements of the original design, are the scope of the Party B's warranty responsibility.

3, warranty costs: from the project settlement retained, stay in the project settlement of 5% of the total price as a warranty. Warranty period expires after deducting the costs incurred during a one-time return of the balance. If the cumulative warranty fee exceeds the total amount of warranty fee retained, the exceeding part is still paid by Party B.

4. During the warranty period, Party B shall send someone to repair within 24 hours after Party A sends out a notice, otherwise Party A may entrust other construction units or personnel to repair, and its cost is deducted in the warranty, and the insufficient part shall be paid by Party B. In case of quality dispute, it shall be submitted to the quality inspection department for adjudication. Damage occurs outside the warranty period, Party B is responsible for undertaking the repair work, and charge the labor and material costs as appropriate.

Article 6 Responsibility for breach of contract

The following cases are considered as breach of contract, if Party B is in breach of contract, it will be dealt with as follows:

1. Party A pays the labor remuneration late, and it should pay interest to Party B according to the prevailing interest rate of the time deposit of the bank;

2. The quality of Party B's construction work is not qualified, and Party B should be responsible for reworking. Reworking time costs by Party B is responsible for; and bear the loss of materials and Party A has the right to reduce the contract unit price of 10-20%

3, Party B in the construction, Party B personnel in violation of the rules leading to accidents occurring in the accident, the person in charge of Party B should bear 100% of the loss, the person in charge of Party B to bear the loss of laborers do not withhold their wages.

4, laborers in the site fights, theft, gambling and other illegal and disciplinary events, Party A deducted 5000 yuan each time the labor fee, the circumstances are serious and double the penalty, Party B and bear the corresponding legal responsibility.

5, Party B delayed without good reason, proposed by Party A, Party B does not strengthen the deployment of personnel, Party A has the right to terminate the contract or compression of the scope of Party B's contract; resulting in Party A's losses, Party A has the right to reduce the contract price by 30% as a loss of contract, and Party B received the notice of termination of the contract by Party B must be withdrawn from the site within two days automatically, Party A should be given within 30 days to the settlement of the settlement of the Party B and pay 60% of the total price of the settlement. Party A shall complete the settlement within 30 days to Party B, and pay 60% of the total settlement price, and the balance shall be paid within one year after the completion and acceptance of the project.

Article VII Dispute Settlement

A and B in the fulfillment of this contract dispute, should be the first two sides to negotiate a solution. If consultation fails, either party may apply for labor arbitration or file a lawsuit with the People's Court.

This contract is in duplicate, each party holds a copy of each signature and seal of the contract in force, has the same legal effect, protected by state law, the balance of the settlement automatically expires.

The person in charge of party A: Signature and seal of the person in charge of party B:

Month of year

Month of year

Carpentry labor subcontract model 5

The contracting party: (referred to as party A)

Contractor: (referred to as party B)

By the friendly agreement of both parties, the following agreement has been reached. Reached the following agreement

I. Contracting content:

1. Subcontracting form: the package of work

2. Subcontracting project: unit price

(1) carpentry: the comprehensive unit price of 24 yuan / square meters (according to the contact area settlement).

The above unit price includes the wire, nails and other auxiliary materials required for each type of work and the work machine tools used.

3. Subcontracting content:

(1) Carpentry work:

All the work of carpentry throughout the building;

① template batching, production, installation, dismantling, load-bearing frame. Template reinforcement cleaning, return to the pile, cleaning and oiling of the template. Line, column insertion tendons leave holes, embedded parts buried. The production and installation of steel plate waterstop.

4. Tools and machinery: including repair

The tools and machinery used by Party B (except the derrick) are all taken care of by Party B, including repair, maintenance and management.

5. Duration: according to Party A's requirements, the final guarantee of the total progress plan.

Second, the quality of the project:

The quality of this project masonry project must reach a one-time acceptance.

Party A to carry out technical briefing, Party B strictly abide by the construction specifications, according to the drawings or technical changes in contact with the single carefully operated, the construction of Party B need to comply with Party A on-site command.

Party B causes the quality does not meet the requirements must be reworked to redo, and all the costs caused by Party B is responsible for. Deducted in the month when the project settlement.

Third, the payment method:

1. The project payment is based on the principle of "do first, pay later".

2. Party A according to the amount of work actually completed in the month, the remaining three months after the completion of the project, a one-time payment.

Fourth, incentives and penalties:

1. The implementation of the project quality deposit system, Party B's construction quality does not meet the requirements of the contract, the quality deposit of 10,000 yuan was forfeited. Party A has the right to retire Party B.

2. This project implements safety production, civilized construction deposit system, Party B in the construction process can not reach Party A safety production, civilized construction requirements, safety production, civilized construction, Party A has the right to dismiss Party B.

3, . Party B during construction must implement the project department on quality, safety, civilization, material management system, the implementation of the project department related rewards and penalties.

V. Safety, civilized production:

1. Party B shall strictly abide by the safety operation procedures during the construction period and the six disciplines and ten safety technical measures for safety production, and implement the relevant provisions of the company and local safety production management departments, and effectively achieve safety production. During the construction of all kinds of accidents occurred by the responsible party.

2. Party B strictly abide by the project and the local management of civilized construction management system, and obey the project to create a civilized standard chemical site arrangements. Put an end to barbaric construction, illegal operation, do a good job of the construction site of the falling hand clear work. Do a good job to clear the site after the work. The materials will be positioned neatly according to Party A's requirements. If Party B is not found to be timely recovery of materials, found once, a penalty of 1000 yuan.

3, if Party B does not match all the labor insurance products, not according to the provisions of Patron helmet, etc., every time by each person each time a deduction of 50 yuan.

Six, other:

1. 70% of the time the person in charge of Party B must be at the construction site. Party B must be equipped with each type of sample turnover personnel.

2. Party B must be recruited during the construction of the three certificates, and in a timely manner for a variety of documents, the costs borne by Party B, due to incomplete documents, all the consequences caused by Party B is responsible for, shall not be illegally recruited underage workers, found once a fine of 500 yuan.

3. Party B should comply with the relevant policies and decrees of the local public security departments during the construction period, and found that fighting, stealing, gambling are dealt with strictly, and fined 1,000 yuan for each occurrence.

4. Party B commits to all the conditions of the contract terms, such as breach of all the consequences of Party B, Party A has the right to terminate the contract, the balance of the money will be forfeited by Party A as a loss of Party A.

5.

5. The two sides of the contract to resolve any outstanding issues through friendly consultation.

This contract is in triplicate, Party A executes two, Party B executes one. The two sides stamped and signed after the entry into force.

Party A: Party B

Representative: Representative:

Date of Signing: Monthly

Carpentry Labor Subcontracting Contract Book Related Articles :

★ Carpentry Labor Subcontracting Contract Book Model 3

★ Ceiling carpentry labor subcontract model

★ Carpentry construction contract model 3

var _hmt = _hmt || []; (function() { var hm = document.createElement("script"); hm.src = "/hm .js?fff14745aca9358ff875ff9aca1296b3"; var s = document.getElementsByTagName("script")[0]; s.parentNode.insertBefore(hm, s); })();