The former paragraph other than the established towns can refer to the implementation of these measures. Article 3 The provincial housing and urban-rural construction department is responsible for the supervision and management of drainage and sewage treatment in towns within the administrative area of the province.
The municipalities and counties (cities) people's governments in the districts of urban drainage and sewage treatment department (hereinafter referred to as the competent department of urban drainage), is responsible for the supervision and management of urban drainage and sewage treatment in the administrative area.
Development and reform, finance, land resources, environmental protection, water conservancy, audit, public security and other relevant departments in accordance with these measures and other relevant laws, rules and regulations, in their respective areas of responsibility *** with the work related to urban drainage and sewage treatment. Article 4 The people's governments at or above the county level shall incorporate urban drainage and sewage treatment into the national economy and social development planning, encourage and support scientific and technological research on urban drainage and sewage treatment, promote the application of advanced and applicable technologies, processes, equipment and materials, and promote the recycling of wastewater and the utilization of sludge, rainwater resource utilization, and improve urban drainage and sewage treatment capacity.
The people's governments at or above the county level can take franchising, purchase of services and cooperation with social capital and other forms of multi-channel fund-raising for the construction and operation of urban drainage and sewage treatment facilities. Chapter II Planning and Construction Article 5 The competent department of urban drainage shall, in conjunction with the development and reform, urban and rural planning, environmental protection, land resources, water conservancy and other departments, the preparation of the administrative area of urban drainage and sewage treatment planning and urban flood prevention and control of special planning, the people's government of the approval of the implementation of the organization, and reported to the next level of the competent authorities for the record.
Planning guidelines organized by the provincial housing and urban-rural construction department. Article 6 The people's governments at or above the county level shall, in accordance with the urban drainage and sewage treatment planning and urban flood prevention and control of special planning, the development of annual construction plans, and organization and implementation; increase the construction and maintenance of urban drainage and sewage treatment facilities, the purchase of emergency emergency equipment for flood control and flood control of emergency engineering construction of the investment.
Dependent on the road construction, renovation of urban public **** drainage facilities, should be synchronized with the road construction, renovation. Article VII of the new urban construction and renovation of old urban areas, shall be in accordance with urban drainage and sewage treatment planning to determine the rainwater runoff control requirements for the construction of related facilities, and the implementation of rain and sewage diversion.
The development and construction of new urban areas, should give priority to drainage and sewage treatment facilities; not built or built but did not meet the relevant national standards, should be in accordance with the annual construction plan for construction and renovation. Article VIII of the people's governments at or above the county level shall, in accordance with the special planning for the prevention and control of urban flooding, strengthen the rainwater network, pumping stations and rainwater storage, discharge of excess rainwater runoff and other drainage facilities construction and renovation, prioritize the flood-prone sections of drainage facilities construction and renovation.
New construction, alteration and expansion of municipal infrastructure projects should be based on national and provincial sponge city construction norms, standards supporting the construction of rainwater collection and utilization facilities, increase green space, gravel ground, permeable pavement and natural ground on the seepage capacity of rainwater, the use of buildings, parking lots, squares, roads and other construction of rainwater collection and utilization facilities, cut rainwater runoff. Article IX urban drainage and sewage treatment facilities construction projects, planning, design, construction and acceptance of completion and operation of the unit shall be determined in accordance with the relevant provisions of the state and the province.
New construction projects, alterations, expansion of construction projects need to build drainage and sewage treatment facilities, should be designed with the main project at the same time, the same time construction, put into use at the same time. Article X urban drainage and sewage treatment facilities after completion and acceptance, the construction unit shall be transferred within three months of the project file information to the city construction archives management organizations and urban drainage authorities.
Belonging to the urban underground pipeline project, should be in accordance with the provisions of the "Hebei Provincial Urban Underground Pipeline Network Regulations", within three months of the relevant information to the urban underground pipeline network integrated management department. Article XI of urban sewage treatment facilities to accept industrial sewage water shall not exceed forty percent of the total amount of water admitted. More than forty percent, the local people's government shall separately organize the construction of industrial wastewater treatment facilities. Chapter III Drainage Management Article XII of the town drainage department shall, in conjunction with the relevant departments to delineate the coverage of urban drainage facilities. Discharge of sewage within the scope of coverage, should be in accordance with relevant state regulations will be discharged into the urban drainage facilities. Article 13 Units engaged in industrial, construction, catering, medical and other activities and individual businesses (hereinafter referred to as drainage households) to the urban drainage network and its ancillary facilities to discharge sewage, shall apply to the local town drainage department for a permit for sewage discharge into the drainage network, and have the conditions stipulated in Article 22 of the "Regulations on Urban Drainage and Sewage Disposal". Article XIV of the drainage households for sewage discharge into the drainage network permit, shall submit the following materials to the competent urban drainage department:
(1) application form;
(2) in accordance with the provisions of the construction of sewage pre-treatment facilities of the relevant materials;
(3) permit application for acceptance of the date of the one month prior to the date of the water quality testing agency with metrological qualification of the water quality of the drainage water quality, water quantity Detection report; proposed sewage discharge of drainage households to submit water quality, water forecast report;
(d) included in the list of key sewage discharge units should provide the main water pollutants installed in the drainage household automatic monitoring equipment related materials;
(e) new drainage facilities are also required to provide the drainage of the hidden project completion report, the internal drainage network, a special test well, sewage outfall location and caliber of drawings and descriptions of materials. Caliber of the drawings and descriptions and other materials;
(F) laws and regulations provide for other materials.
The competent department of urban drainage shall promptly inform the operating unit of the permit processing.