Scaffolding contracting agreement

In the age of continuous progress, many places will use the agreement letter, signed to ensure that both parties can work together happily. So is it really difficult to write a letter of agreement? The following is I help you organize the scaffolding contracting agreement 3, just for reference, welcome to read.

scaffolding contracting agreement Part 1

Contractor (Party A): (referred to as Party A) Contractor (Party B): (referred to as Party B)

Party A for the construction of the xxxx (Phase IV) project, by the consensus of both parties, Party A will be the project of the 11 ~ 23 blocks of steel scaffolding works contracted to the construction of the Party B. In order to ensure that the construction project contracted for the successful completion of the contracted by both parties to full consultation, *** with the agreement reached as follows In order to ensure the successful completion of the contracted construction project, after full consultation between the two parties, *** with the following terms, hope *** with the compliance.

I. Project Overview:

(a) Project Name:

(b) Project Location:

Second, the content of the contract:

The scope of this project scaffolding erection, including scaffolding, scaffolding transverse, vertical safety net, scaffolding demolition, materials and materials. The materials required for the above construction shall be solved by Party B itself.

Party B also provides steel pipes and fasteners needed for supporting mold frame in carpentry.

Third, quality requirements:

1, according to the requirements of the construction drawings and construction site needs to set up and construction, construction, strict compliance with the "construction scaffolding safety technology provisions" and "building construction inspection standards," the provisions of the construction of scaffolding must meet the requirements of the standardization project.

2, Party B erected scaffolding by Party A's construction workers, technicians in accordance with the construction specifications in the pre-construction testing and acceptance, if Party A believes that the need for rectification, Party A written or verbal notification of Party B, Party B in accordance with the construction specifications and the construction of the actual requirements of rectification, Party B refused to rectify the losses incurred by Party B.

3, the construction of scaffolding in strict compliance with the provisions of the technical provisions of construction scaffolding safety and building construction inspection standards.

3, Party B in the construction in strict accordance with the contract, specifications, design drawings, engineering contact sheets and Party A's technical staff to carry out construction, for Party A's technical management personnel and relevant government departments to provide cooperation with the inspection, but check the following does not interfere with the normal construction of the Party B limit.

4, the two sides of the project quality disputes, agreed by the two sides of the project quality and safety testing organizations to identify the costs and losses caused by the responsible party. Both parties are responsible for, by both sides according to their responsibilities respectively.

Fourth, the progress and duration of the project:

1, Party B must be completed according to Party A's construction plan schedule, carefully organized labor.

2, Party A arranged monthly and part of the plan, Party B according to the monthly and part of the plan supporting the completion of the plan to organize the construction.

3, the duration of the year year Party A in accordance with the daily per square meter / yuan plus pay Party B works, Party A and the two sides to negotiate a solution.

4, the use of internal support mold frame time for the steel pipe, fasteners into the field on the date of Party A in accordance with the daily per square meter /? Yuan plus party B's project payment.

5, Party B steel pipe, fasteners and other materials into the field by Party A to notify Party B or issued a contact list, the demolition of external scaffolding also by Party A to notify Party B, the actual use of external scaffolding for the steel pipe, fasteners and other materials into the field to build to the date of the scaffolding is completely demolished.

Fifth, the unit price of the project and the cost of settlement

1, Party B is actually responsible for scaffolding the construction area of the project, per m2 settlement of 3500 yuan (including the foundation, the main body, the other parts of the project, the field of the other maintenance works), the unit price of the period of time in accordance with the actual floor area of yuan / square meter, the tentative total amount of work for ten thousand yuan.

2, construction area calculation method: one of the car garage 2, according to each m2 yuan settlement, bicycle storage and storage room area according to the area settlement.

3, the project payment: Party A in accordance with the monthly progress of the completion of 60% of the volume of work in the next month before the 10th to pay Party B project, the main body of the roof should be payable to 75% of the total project, scaffolding all removed to pay 90% of the balance of the completion of the acceptance of the 3 months to pay off. Party B's construction personnel wages partly paid in cash (wages partly in accordance with the total project amount of 40% of the approved), Party B to provide the payroll book and list, the rest of the payment in accordance with Party B's designation. Class master shall provide formal limited or lease check after payment, in the event of special circumstances, the two sides to negotiate a solution, such as to be resolved by the Ministry of the project at a cost of 0.75%.

4, such as Party A needs to build the contracted content outside the sporadic projects, Party B to assist in building, building the costs required by the two sides to determine the negotiations, specifically by the Party's construction workers or technicians to issue a contact sheet or certificate.

5, the project settlement volume to the completion of the settlement of the building area shall prevail.

Six, civilized construction

1, Party B must be in the workers into the field within ten days after the workers roster and ID card copies (including photos) to Party A, personnel mobilization should be adjusted in a timely manner on the roster. Otherwise, Party B is fully responsible for all accidents. Strictly prohibit children and other non-construction personnel to enter the construction site, was Party A found at the construction site per person times a deduction of ¥ 50-100 yuan, disobedience to the advice of unauthorized mixing into the construction site and the occurrence of `accidents by Party B is fully responsible.

2, Party B shall not use non-adult workers under the age of 18, and shall not use elderly workers over the age of 60 and patients suffering from diseases that are not suitable for this type of work, and Party B must comply with the implementation. Once Party A found on the scene, each time the deduction and fine of 100-200 yuan, unauthorized use of unauthorized personnel in violation of the provisions of the workplace accidents caused by Party B is fully responsible.

3, Party B should follow the relevant government decrees to complete the construction of the relevant documents, Party A to give supervision and assistance.

4, Party B's construction personnel to do licensed to work. License rate and Party A to put the badge belt have reached 90%, where Party A inspection found that the documents are incomplete penalty of ¥ 10-50 yuan / person.

5, Party B should be strictly in accordance with Party A's construction program and the relevant safety norms, safety regulations for construction, for the construction site must be removed to set up barriers, civilized construction measures should be achieved to achieve a certain degree of safety protection temporary construction before construction, immediately after the completion of the construction to restore.

6, Party B dormitory, it is strictly prohibited to haphazardly drag 220v wires; it is strictly prohibited in the dormitory use of electric stoves, electric casseroles, electric rice cookers, gas stoves, once found in addition to confiscation of the equipment and a fine of ¥ 100 / only; it is strictly prohibited to defecate, the violator of the fine of ¥ 50; it is strictly prohibited to fight and brawl, such as the occurrence of fights and thefts and other incidents, each time a fine of ¥ 1,000 / person: the circumstances are serious by the public security department to deal with. Public security departments to deal with the seriousness of the case.

7, in the construction period, such as the occurrence of industrial accidents, Party A has the obligation to assist in emergency rescue, the aftermath of its negotiation between the two sides to deal with the situation in the construction of Party A safety facilities, equipment is complete. Because party B construction personnel violate labor discipline and safety accidents, all the consequences of party B is responsible for, party A does not bear any costs of the accident.

8, Party B should take care of Party A's various equipment, facilities, and according to Party A's requirements for a good dormitory cleanliness and hygiene and layout. Party B to implement inspection and supervision, violators can be fined ¥ 20-100 yuan, and is responsible for ordering the deadline for rectification.

9, Party B can apply for the team staff for the "accidental injury life insurance" or by Party A site co-ordination payment.

10, Party B must fully comply with safety regulations, safety systems, Party B violates the regulations, systems, Party A has the right to punish depending on the severity of the case.

11, for Party B in the construction of the conditions and reasonable requirements of Party A to provide the necessary assistance and facilities for Party B's construction personnel, if a minor violation of the system of anti-systems first of all to the education-based, if repeat offenders can be punished from the heavy.

Seven, the protection of finished products:

1, Party B contracted within the scope of internal and external scaffolding, protective gates and other facilities in the project is not completed, the use of Party B shall be responsible for the protection of facilities during the use of the protection of the work and to maintain the integrity of the facilities, the effectiveness of the protection; protection of the period of time, if the need to repair the reasons for the need for repair due to natural wear and tear by the B party to be repaired, if it is because of Party A man-made factors damaged or exceeded the contract, the contract shall be repaired. Party B will repair the facilities if they need to be repaired due to natural wear and tear during the period of protection, and if they are damaged by Party A due to human factors or exceed the agreed period of the contract, Party B will repair the facilities after Party A has issued the repair contact list, and the costs will be borne by Party A.

2. The building shall not be damaged when taking up and tearing down the frame, if it is damaged, it must be repaired in time and meet the quality standard, and Party B shall be responsible for the required cost.

VIII, materials and equipment management

1, the project requires the inner wall supporting molding frame, the outer wall scaffolding steel pipe, fasteners, scaffolding piece, safety net, wire and other turnover materials, consumable materials are provided by Party B, and their own storage, maintenance. (Steel pipe, fasteners, including walls, columns and plates, and other components of the template project reinforcement materials)

2, the quality of the products supplied by Party B required by the national standard and the higher level of the relevant provisions of the requirements of the Ministry of the project and the requirements of the qualified products, and to provide the appropriate information. And according to the relevant provisions of the testing of incoming materials.

3, carpentry class required steel pipe, fasteners and other support frame materials, 5 days in advance to report to Party B, Party B must be timely in accordance with the specifications of the number of field, Party A needs to supervise the carpentry class to properly store and construction of the above materials, resulting in damage to the materials in accordance with the market value of compensation.

4, derrick, ladder and crane provided by party A.

5. Party A will provide necessary assistance and cooperation to Party B for proper storage and management of the above materials, and prohibit other team members from using the materials stored by Party B without consent.

Nine, safety requirements:

1, Party B shall be responsible for three-level safety education and safety and technical briefing for workers, strictly in accordance with the standard requirements of the construction, in order to ensure the safety and reliability of scaffolding works.

2, Party B should strictly abide by the safety, civilized construction of the relevant laws and regulations, to comply with the rules and regulations of Party A, shall not be unauthorized command, unauthorized operation; seriously wear good labor protective equipment on duty, to ensure construction safety. During the construction of safety accidents and injuries occurring during the work by Party B is fully responsible for their own, the cost of Party B to take care of themselves.

3, Party A shall organize project supervision, construction unit of scaffolding acceptance in stages, acceptance is not qualified shall not be used, Party B shall unconditionally rectify until qualified. Party B should not accept the scaffolding for closed management, Party A to assist. Party B should carry out regular inspection and maintenance of the scaffolding to ensure that the scaffolding is absolutely safe during the period of use, otherwise Party B will be responsible for all the responsibilities of safety accidents.

4, Party B's construction personnel must be licensed to work at work, work at height must be fastened with a safety belt, not to work after drinking and work against the rules.

X. Liability for breach of contract:

1, due to Party B's own organization and management reasons for the delay, Party A punished Party B 3000 yuan per day.

2, Party B should be required by the progress of the full complement of workers, due to Party B's production capacity can not meet the specification requirements, the progress of the project can not be guaranteed, Party A can require Party B to speed up the construction system, if Party B still does not meet the requirements, seriously affecting the progress of the project Party A can terminate the contract, the two sides of the actual occurrence of the project payment for the settlement of the construction of the Party B to withdraw from the construction of the works, engineering materials by Party B to retrieve their own.

3, Party A did not provide construction conditions in accordance with the contract and to provide the obligation to cooperate, Party B can not carry out the construction, the duration is not deducted.

4. If Party A fails to pay the project payment and other expenses on time, Party B can refuse to construct the project, and the loss caused has nothing to do with Party B. Party B can ask Party A to pay one thousandth of compensation per day according to the part of non-payment.

XI, the other rights and obligations of the two sides:

1, the project Party A's performance on behalf of the construction of engineering, technical personnel, safety, materials and other construction personnel and management, Party B's performance on behalf of the actual contractor for the project, on behalf of the behavior of a party's conduct without further authorization.

2, the construction of this project in the process of both sides of the contract needs to be changed by the representatives of both parties to sign a supplementary agreement or by the relevant personnel to the Party B issued a contact list.

XII, outstanding matters:

This agreement is not exhaustive, can be supplemented by the two sides of the negotiation. Supplementary agreement and this agreement has the same legal effect. Thirteen, other:

1, the two sides in the performance of this contract in the process of dispute, the two sides should be negotiated to resolve, such as can not be resolved, both sides can be signed to the contract (Hangzhou Yuhang District) court sued each other.

2, this agreement in triplicate, Party A executes two, Party B executes a copy of this agreement by the two sides signed and sealed after the entry into force of the project payment, the agreement naturally terminate.

Party A (seal): Party B (seal):

Party A's representative (signature): ID card number:

Date of signing: January,

Scaffolding Contract Agreement Part 2

(Party A)

(Party B)

In accordance with the "Chinese People's Republic of China*** and the State of the contract law" and the provisions of the relevant laws and regulations to ensure that the delivery of the work by the deadline, the two sides in good faith and trustworthiness, both sides of the agreement to ensure that the work will be completed on time. Delivery, the two sides in line with the principle of honesty and trustworthiness, through voluntary and equal consultation, on the basis of mutual benefit, on the ******** project scaffolding erection and safety protection engineering construction matters to reach agreement on the terms of the agreement:

I. Project Overview

Construction Unit

General Contractor:

Name of Project:

Structural Level: Storied Frame Structure

Building Area: ㎡

II. Contracting Mode and Scope

Contracting Mode: Contractor's Work and Materials

Contracting Content: internal and external wall scaffolding, protection shed, safety channel, staircase entrance protection, "four five edge" protection, material platform and other construction and demolition as well as "safety and quality standardization demonstration site" must be erected temporary guardrail (including steel pipe, buckle, connectors, channel steel) The temporary guardrail (including steel pipe, buckle, connectors, channel steel, safety net (including inspection), bamboo fence, wire, steel pipe painting, etc., as well as all the materials and mechanical equipment and tools and appliances that must be invested in order to complete the contracted content, as well as the in- and out-of-field transportation of the materials, machinery, and tools and appliances, etc.).

Third, the contract price and payment

1, the contract price: the contract content that the total cost of the whole yuan. After the completion of each square meter of floor area of yuan, to party B for final settlement, the price for a one-time package dead comprehensive price, regardless of what happens, the price is not adjusted. The price includes: machinery, materials, safety and protection, civilized construction costs, insurance, medical costs, safety risk, and Party B for the completion of the contracted content and the construction of emergencies must be paid for the other costs.

2, payment: protection shed, safe passage, stairway, etc. completed, and scaffolding and indoor safety protection (including mold support), three main structure is completed, acceptance of the standard, pay ﹪ of the total price, five (structural layer) at the end of the construction to pay the total price of %, the main project is completed, the end of the frame and protection, testing, and did not occur the party responsible for the safety accidents, the party shall pay the total price of %. Party A will pay ﹪ of the total price, and the remaining amount will be paid one month after the end of scaffolding dismantling (completion of all contracted contents) (without interest).

3, the project payment according to the actual completion of the progress of each building were paid. The calculation base is the actual cost of each building.

4, from the first floor of each main building within the frame to start building, the steel pipe on-site stopping time for six months (the actual construction time does not include rain, snow and other force majeure impact time). If Party A needs to continue to use the external scaffolding at the end of the period, Party A shall pay the lease to Party B according to the actual steel pipe usage of the external scaffolding.

〈2〉Cooperate with Party B to do a good job in coordinating the work at the construction site.

〈3〉Cooperate with Party B to do a good job of safety education and pre-job training of the personnel entering the site, and in accordance with the special construction program, check and supervise the construction of safety protection.

〈4〉The right to investigate and deal with the violation of rules and discipline of Party B's personnel.

〈5〉The right to monitor the construction safety and quality of Party B in all aspects.

〈6〉Fulfill the contractual agreement to pay the progress and settlement payments on time.

2. Responsibilities and Obligations of Party B

〈1〉Strictly abide by the safety laws and regulations promulgated by the state, fully implement the Safety Technical Operation Regulations, take positive and effective measures, do a good job in the safety education of the personnel belonging to the party to ensure the safety of the construction, and prevent all casualties from occurring.

〈2〉Strictly abide by the rules and regulations formulated by Party A, and obey Party A's unified scheduling and management.

〈3〉Strictly in accordance with the specification requirements, to ensure that the erection of the frame and protection of the quality to meet the needs of Party A use.

〈4〉When working at high places, you must fasten the safety belt and wear good labor protection equipment.

〈5〉The steel pipe and other materials entering the construction site must be stacked in accordance with the location designated by Party A, and neatly stacked, so as to achieve safe production and civilized construction.

〈6〉Educate the construction personnel belonging to the party, abide by national laws and regulations, consciously maintain stability and unity, and put an end to the occurrence of illegal and undisciplined behavior, or else all the economic, civil and legal responsibilities arising therefrom shall be borne by Party B.

〈7〉Bear all the safety responsibilities of yourself and your subordinate personnel, and the handling of all emergencies and compensation responsibilities.

〈8〉Pay the material payment and honor the workers' salary on time, and bear the full responsibility for the prosecution cases and mass visits caused by your own reasons.

V. Penalties for non-compliance

1. Party B and its personnel, in violation of the national safety regulations and the requirements of the "Safety Technical Specification for Fasteners or Scaffolding", or failure to follow the relevant standards of safety protection resulting in safety accidents, in addition to all the responsibility for the accidents and damages to be borne by the Party B, according to the Party according to its circumstances and severity of the other penalty **** yuan fine. ** yuan fine.

2, Party B must synchronize the erection according to the main structure, regardless of the reasons for the delay in the construction period, every delay of one day Party B must bear the Party A ***** economic penalties, and bear the responsibility for damages.

3, Party A's responsibility to Party B caused by the loss, its loss and responsibility borne by Party A.

4, Party B and its personnel into the field, must effectively maintain the safety of Party A's property, and cooperate with Party A **** with good site security. If found to have damaged or stolen property behavior, all according to its purchase price of 10 times the penalty, the circumstances are serious and transferred to the public security organs according to law.

5, Party B arranged the site caretaker, must obtain the consent of Party A before entering the site, and according to the location designated by Party A to set up temporary housing. The caretaker is prohibited to use electric stove, electric rice cooker, electric kettle, etc. to boil water for cooking, otherwise it will be penalized according to **** yuan each time.

6, Party B personnel into the field, must strictly obey Party A management, prohibit fighting, brawling, verbal abuse and other phenomena, otherwise, no matter what the reason, Party A will be per participant **** for the first penalty, and according to the severity of the case, to give criticism and education, written review until the transfer of the judiciary to deal with.

7, Party B and workers in the construction must be in accordance with the provisions of the helmet, seat belt wear, otherwise, once found, each person each time a fine of **** yuan.

8, due to Party B's reasons led to the occurrence of group visits to its own personnel, in addition to the losses caused by Party B, Party A in addition to each incident by ***** yuan penalty.

9, due to Party B's mismanagement led to fire accidents, in addition to the responsibility for the accident and all the losses borne by Party B, Party A in addition to each incident ****** yuan for punishment.

10, Party A defaults on project payments, Party B has the right to demand compensation or stop work. The losses caused by Party A.

11, construction period, Party B must be in accordance with the time specified by the Party A supply template support, or if there is a delay in addition to the corresponding extension of the use of Party A time, and another penalty of ****** yuan per day, used to compensate for the loss of Party A delay.

Six, the responsibility for breach of contract

This agreement signed by both parties to enter into force, the two sides must *** with the fulfillment of any party shall not be any excuse to violate any of the terms of the agreement, otherwise, will be considered as a breach of contract, in addition to the party in breach of the payment of the other side of the breach of *********, and bear the breach of contract to the other side of all the losses caused by the other side.

The defaulting party shall, in addition to the payment of dollars to the other party, bear all losses caused by its default to the other party.

VII. This agreement will enter into force after both parties have signed it, and will be null and void after the conditions of the agreement have been fulfilled.

VIII, this agreement in triplicate, A and B each party, reported to the relevant departments for the record a .

Party A (on behalf of) Party B (on behalf of)

Year Month Day Year Month Day

Scaffolding Contracting Agreement Part 3

Contractor: (hereinafter referred to as Party A)

Contractor: (hereinafter referred to as Party B)

According to the "Contract Law" and the "Regulations on Contracting for Construction and Installation Works" and the current relevant provisions, in order to specify the rights, obligations and financial responsibilities of the two sides in the process of construction, and the contracting authority will be responsible for the construction of the scaffolding. Rights, obligations and economic responsibilities, the two sides agreed to sign this contract, *** with the implementation of the letter, specially formulated the following terms:

First, the content of the contract:

Party A agreed to ______________________________ project exterior steel pipe scaffolding project in the form of package contract to the contracting of Party B.

The specific project:

The contracting of the project, the contracting of the project, the contracting of the project, the contracting of the project, the contracting of the project.

Specific projects include the erection, dismantling and maintenance of external steel pipe scaffolding, round-trip transportation costs, labor costs for the erection of external scaffolding, the materials include steel pipes, fasteners, vertical safety nets, bamboo skewers and so on, the above materials belong to Party B, the demolition of the completion of the removal of the Party B transported away on their own.

Second, quality requirements:

The distance of the external steel pipe scaffolding is 1600mm-1800mm, the distance of the internal and external poles is 800mm, and the distance of the fa?ade is 1800mm, and there is a guardrail at the height of 900mm for each step of the frame, and the distance of the internal poles and the wall is 250mm-300mm, and the distance of the external fa?ade is 250mm-300mm. The distance between the inner pole and the wall is 250mm-300mm, scissor braces shall be set up on the outer face, and a safety net shall be hung up on the outer face after each step, and a bamboo string board shall be laid on the outer frame of the main building for every three natural floors, and the additional cost shall be counted separately if needed. All scaffolding erection according to Huizhou City Safety Inspection Station specification erection.

Third, the project and calculation: (the following amounts involved are excluding tax price)

(1) comprehensive scaffolding area of the external wall calculation: according to the concave and convex perimeter of the building each corner plus one meter multiplied by the height (calculated to the top of the daughter wall, there is a pitched roof should be in the eaves at the drip another 1.2 meters), the unloading platform mouth of the external scaffolding is not deductible, the comprehensive scaffolding of the external wall of each square meter of RMB _______ yuan.

(2) unloading platform: (unloading platform width of 2m: the area is calculated by 2m times the height; more than 2m: the area is calculated by the side of the long side times the height), per square meter according to the unit price of the external wall scaffolding.

(3) safety channels, safety baffles, operation protection shed, etc., according to the actual area, external up and down stairs according to the perimeter multiplied by the height of the building, per square meter according to the unit price of the external wall frame.

(4) indoor staircase single-row steel pipe guardrail per staircase per layer _______.

(5) construction work aisle (footbridge) to the side of the two sides of the length multiplied by the height, per square meter according to the unit price of the external wall frame.

(6) elevator shaft within the perimeter of the length plus width multiplied by the height, per square meter by the unit price of external wall frame.

(7) Spreader platforms, entrances and exits of people and freight elevators, and tower crane parapet walls, each _______ yuan per floor each.

(8) Full hall racking per cubic meter _______ yuan.

All materials and labor wages for planking work of the above items are the responsibility of Party A.

Fourth, the duration of the calculation:

The above items, unit price is calculated in accordance with the duration of ______ days, such as the extension of the project caused by the overrun, Party A must be built according to the area of rent to Party B per square meter per day rent of RMB 0.15 yuan, and pay off every month. The construction period is calculated from the date of starting the erection to the date of dismantling the outer frame for the construction period.

V. Payment:

Party A pays Party B according to the progress of erection, when the outer frame completes 50% of the main body, Party A pays the total price of the project _______ of the project, and after the outer frame is capped, it pays the total price of the project _______ of the project, and pays all the remaining _______ during the dismantling period of the outer frame, and Party A should calculate the actual area of the frame within one month before dismantling of the frame. Party A shall calculate the actual area of the frame within one month before Party B dismantles the frame.

VI. Responsibilities of both parties:

(1) Party A shall provide a site for Party B to stack materials and living water and electricity and vertical transportation of equipment and materials.

(2) If Party A fails to pay Party B on time, Party B shall have the right to stop the work and recover the outstanding payment.

(3) Party A shall cooperate with Party B to impose fines on the crews for theft of steel pipe fasteners. (If the theft of steel pipe is found to be 20 times the original price of steel pipe punishment, theft of fasteners to each fastener 200 yuan punishment)

(4) Party A should pay attention to the management of the finished product of the external frame, shall not be arbitrarily dismantled safety nets, wall rods, etc., which results in all rework work by the Party A is responsible for.

(5) Party B must obey the arrangements of Party A's management personnel, strict control, ensure safety, ensure quality, and ensure construction progress.

(6) The cost of reworking the items added outside this agreement or modified by Party A shall be compensated to Party B by Party A separately, and visa formalities shall be handled and paid off month by month.

(7) Party B must ensure that the material is sufficient, and shall not affect the progress of Party A's construction, or a fine of 500 yuan each time.

(8) Party B is responsible for the safety accidents during the erection of the outer frame.

(9) Party B in the erection process of buried parts by Party A to dispose of their own.

(10) Party B's personnel should be civilized construction, no fighting at the site, gambling and trouble, or else accept the punishment according to Party A's management system.

VII. Liability for breach of contract:

Party A and Party B shall keep the contents of the agreement *** with the implementation of the implementation of the agreement, if one party default shall compensate the other party for economic losses. During the construction process, if the project is suspended for more than 30 days due to Party A's factors, Party A will settle 90% of the completed works to Party B. Party B has the right to dismantle the completed works or rent according to the fourth item of this agreement. The two parties shall negotiate and settle any outstanding issues or make additional agreements.

This contract is in duplicate, Party A and Party B each sign a copy, with the same legal effect, effective from the date of signature or seal of the two sides, the completion of the project settlement after the payment of natural expiration.

Party A: Party B: Huizhou Tengda Scaffolding Engineering Co.