New fixed assets application report

New Fixed Assets Application Report

How is the content of the new fixed assets application report? Below I will introduce you to 4 new fixed assets application report sample, to give you a reference.

篇(一):新增固定资产申请报告范文

Coking Plant Comprehensive Department:

Now because of the work need to purchase a laser rangefinder, the reasons for the purchase and the funding budget is briefly described as follows:

1, the reasons for the requisition:

2, the model and the funding budget:

Applicant:

20xx year xx Month x

篇(二):新增固定资产申请报告范文

市南区政府:

In order to adapt to the needs of the modern office, improve office conditions, improve work efficiency, approved by the district government, the office of the Bureau of the Office of the Longjiang Road relocated to the 21st Wushengguan Road, due to the new change of the office address, the need to purchase air conditioning, office desks and chairs, conference room tables and chairs, filing cabinets, etc. valued at about 210,000 yuan. Special plea to the district leadership to be resolved.

The above instructions when or not, please approve.

Applicant:

20xx xx month x

Attachment: a variety of office equipment schedule

Part (3): new fixed assets application report

To: Tianyang County Water Conservancy Bureau

Hereby I Guangxi Xinyuan Road Construction Engineering Company Limited through the bidding contract Guangxi Tianyang County Lumi high-efficiency water-saving irrigation project called the eye of the Tuen Mun to the high-level pool section pipeline and laying installation project. Ltd. is hereby contracted through bidding for the pipeline and laying and installation project from Calling Eye Tun to High Level Pool of Lumi Efficient Water Saving Irrigation Project in Tianyang County, Guangxi Province.

My company in the 3 # irrigation piece pile number 1 + 350 to 1 + 400 section of the trenching process, encountered the section of the foundation for the rock masonry, pavement for the cement mortar poured cement road a, after my construction personnel with a measuring tape, the pipeline passes through the cement road part of the road section of the thickest part of the road, the road surface from the ground is 1.6 meters high, the width of the road is 4.5 meters. So that the excavator can not dig the cement section, you must invite other drilling excavator for the road digging, at the same time, due to the road engineering vehicles through more, digging the pit must be immediately after the release of the pipe and backfill and in the evening vehicles less time to arrange for the construction of the construction personnel on the road surface of the concrete pouring to restore the original appearance of the road.

In view of the above, after my company related personnel costing, the 1.6 meters high,

4.5 meters wide cement pavement construction (excavation, restoration) will greatly increase my company. Cost, so the preparation of the report, I hope that your bureau can be based on the actual situation to my company to increase the part of the corresponding construction costs, after the total amount of RMB yuan.

I implore you to approve the leadership, and give the approval as a sense!

Applicant:

20xx xx month x

Part (4): new fixed assets application report model

Departments:

In order to adapt to the needs of the school's development, to promote the standardization of asset management, with the school's financial budget and the organic combination of budget management, according to the "Provisional Measures for Management of State-owned Assets in Public Institutions" (Ministry of Finance Decree no. In order to meet the development needs of the school and promote the standardization of asset management, in accordance with the "Interim Measures for the Management of State-owned Assets of Institutions" (Ministry of Finance Decree No. 36) and "Interim Measures for the Management of Fixed Assets of Henan Commercial College", and according to its own development plan, discipline construction, scientific research direction, professional settings, work needs, etc., the preparation of the 2009 annual acquisition plan of fixed assets, the relevant matters are notified as follows:

1. Instrumentation units, according to the unit's disciplinary development, professional construction, experimental teaching and research direction, the development of the 2009 annual acquisition plan for experimental teaching equipment. The acquisition plan should state the number of planned experimental hours to be undertaken by the project or equipment applied for, the feasibility analysis report, and the number of existing equipment, the use of the situation, and so on. Departmental leaders signed and stamped with the departmental seal on December 25, submitted to the Center for Modern Education and Experimentation, the Center for Modern Education and Experimentation of the units declared plans to make a full demonstration of the summary of the January 5, 2009 forwarded to the Office of Fixed Assets Management.

2, declare the fixed asset plan other than experimental teaching equipment:

need to declare the purchase of administrative, logistical equipment, books, etc., the unit should be fully investigated, carefully prepared short-term plan that is the 2009 annual purchase plan, including the name of the equipment, the reasons for the purchase, the number of, the direction of the use of, the amount of money required, etc., and the approval of the head of the unit to be signed and stamped with the departmental seal, and then submitted directly to the Office of Fixed Asset Management before December 25th. December 25 before directly reported to the Office of Fixed Asset Management.

3, the preparation of the plan must be arranged in the order of importance of the project.

4, the leadership of the units should attach great importance to the preparation of the plan, not only to ensure that the work of the unit needs, but also to avoid blindly applying for the purchase of assets caused by waste. The departments need to take into account the actual needs of the department teaching, research, management, combined with the current situation of the school's financial resources, in line with the realistic, economical and efficient, the principle of resource **** enjoy the reasonable declaration of the acquisition program. Each unit must report the acquisition plan on time. In addition to special circumstances, in principle, the future will no longer be given to the implementation of not included in the annual plan for the purchase of assets

5, the departments to report the content of the procurement plan need to include

Including: procurement projects, configuration requirements or specific models, the required funds for the purchase, etc., and to indicate the level of urgency. In the process of compiling the procurement plan, the departments are required to arrange visits and inquiries in a conscientious and responsible manner, focusing on the practicality of the equipment, improving the availability of quotations, and minimizing errors.

Applicant:

20xx, xx month x

;