What are the insider operations of construction project bidding?

Construction engineering bidding insider operation: the tender is a valid until the date specified in the opening date of the offer or preliminary construction group to prepare, the content must be very clear, after winning the contract with the bidders to include important content should be included in all, and in the validity of the tender shall not be withdrawn, change the tender offer or the contents of the tender to make substantial changes.

The bidder to prepare?

(1) submit a project proposal?

The main contents are: the necessity of the investment project, the proposed scale and construction location of the preliminary idea, the resource situation, construction conditions, the preliminary analysis of collaborative relationships, investment estimates and financing assumptions, the project's general progress arrangements for the preliminary evaluation of economic and social benefits, etc.?

(2) the preparation of the project pre-feasibility study, feasibility study report and submit?

The main contents are: national and local corresponding policies, the unit's existing construction conditions and construction needs; feasibility and necessity of project implementation; market development prospects; technical feasibility; financial analysis of the feasibility of the analysis; benefit analysis (economic, social, environmental) and so on.