IE engineer common written questions

IE engineers common written questions

1, you originally worked in those companies, why did you leave the last company?

2, you hope to find a what kind of company, you hope to get what from this company? What can you do for the company?

3. What is IE and what is its abbreviation? How long have you been working in IE?

4. What are the main responsibilities of a modern IE?

5, IE should play those roles?

6, IE should have the expertise? How much you have prepared, what are the deficiencies, how to make up for the future?

7, IE should have those awareness?

8, ECRS is what? Can you talk about how you understand or how to apply it?

9, what is PDCA, talk about how you understand or how to apply it?

10, IE has the seven techniques? QC has the seven techniques? Can you give examples of how you work in the application of these techniques?

11, line (pull) balance is how to calculate, you think in what range is reasonable?

12, what is called standard working hours? Calculate the standard working hours usually use those methods?

13, in your work, there is no use of MTM, WF, MODAPTS and other methods, they are called what? Among them, MTM is divided into those kinds?

14, calculation questions: MTM-1, MTM-2, MTM-3, MOST, WF, MODAPTS and other methods were used to calculate: "from the pull (assumed to be 875px) to take the electric batch to lock the 4 screws into the woofer to the hand to return to the natural state of the" time for how much?

15, what is called through rate? How is it calculated?

16, what is called gross efficiency, what is called net efficiency? How are they calculated?

17, Calculation questions: H line in the production of A221-SUB models:

1) In the panel installation workstation found that a subwoofer box stained with UL yellow glue and wooden box crash,

2) In the polarity test workstation there are two units of polarity reversal,

3) Pure tone test workstation there are two units of vibration sound, a leakage of bad air,

4) Appearance of the workstation to check out four units of bad appearance. Checked out 4 units of bad appearance of the woofer.

The line produces 226 units of finished product in the 3rd hour, what is the line's throughput rate in the 3rd hour?

18, Calculation question: I line in the production of X3-SUB models, the standard establishment of the IE is:

1) standard manpower: 34 people;

2) standard hourly output: 150 units / hour;

3) standard working hours: 0.23 hours.

Now the actual attendance of 32 people (2 people sick leave), and because of the panel quality problems, to find the relevant units to confirm, stop the line 0.5 hours, the results of the day's output of 1,110 units (planned output: 1,200 units). Q: the line on the day (in 8 hours) of the gross efficiency and net efficiency of each is how much?

19, Calculation: A251 machine type

1) SUB part, IE`s standard establishment is:

A, standard manpower: 40 people;

B, standard hourly output: 180 units/hour;

2) SAT part, IE`s standard establishment is:

A, standard manpower: 50 people;

B, Standard hourly output: 90 sets/hour;

3) For Packaging section, the standard establishment of IE is:

A, Standard manpower: 16 persons;

B, Standard hourly output: 180 sets/hour.

Now received the PMC plan, the requirement of the A251 machine type SUB, SAT and packaging are adjusted to the hourly output of the same, in order to support the matching, can be assigned to the personnel 102 people.

Try to calculate, what is the hourly output of this machine type?

20, you think in the electronics industry, a company's indirect personnel and direct personnel ratio of how much more appropriate? Have you ever done this calculation or planning experience?

21, what is called process analysis? Try to talk about your understanding of process analysis.

22, IE received a new type of machine, what should be done, should contact those units?

23, you think in order to cope with shipments, temporary investment in a large number of manpower to production, is not a waste? Why? How to calculate this waste?

24, the factory introduced a large and expensive equipment, should be evaluated? Evaluation of what? How to evaluate?

25, there has been a factory Layout, talk about your views on the layout of the factory?

26, you think IE to the production department management or engineering department management, why?

27, can you say, IE need some hard and soft tools? You have mastered those? If necessary, on-site operation.

28, why do you want to join the company? If the company is not consistent with your aspirations, what will you do?

29, you think how to be a qualified supervisor or you like how a boss? What do you want from your boss?

30, you work for the company's environment, living environment and welfare treatment requirements?

;