What are the duties of the receipt and inspection clerk

Acceptance acceptance clerk job responsibilities are checking and recording medical device packaging, reporting acceptance materials.

1, acceptance should be at the same time on the medical device packaging labeling instructions and the relevant requirements of the certificate or document to check one by one, and record.

2, the import of medical devices in accordance with the relevant provisions of the two-person acceptance, and check the relevant documents.

3, check the first varieties of inspection reports and all medical devices product certification.

4, responsible for medical device quality standards and related information collection and reporting.

5, the acceptance of the acceptance of the acceptance of the content: check whether the project is completed according to the approved design documents, supporting, auxiliary works are completed in parallel with the main project; check whether the quality of the project is in line with the state and the Ministry of Railways issued by the relevant design specifications and acceptance of quality standards for construction; check the matching of engineering equipment and equipment installation and commissioning, the completion of the contract for the introduction of equipment from abroad; check the budget estimates and financial completion of the preparation of accounts Check the implementation of budget estimates and the preparation of financial completion accounts; check the joint commissioning, dynamic testing, operational testing; check the environmental protection, water security, labor, safety, health, fire prevention, disaster prevention and safety monitoring system, safety protection, emergency evacuation routes, office production and living housing and other facilities according to the approved design documents are completed, qualified, fine-testing network retesting is completed, the results of the retesting and the relevant information is transferred to the equipment management unit, tools and equipment, standing materials are in accordance with the approved design documents, and the quality and acceptance standards of construction. Machine tools, standing materials are equipped according to the design in place, geological disaster remediation and building seismic defenses are in line with the provisions; check the completion of the project completion document preparation is completed, the completion of the documents are complete and accurate; check the construction of land ownership source is legal, the area is accurate, the boundary address is clear, whether the procedures are complete.