1, docking station:
For the connection between the SMT production line, can also be used for PCB buffer, inspection, testing or electronic components manual insertion.
2, applicable range of 50mm-500mm width PCB board.
3. Responsibilities
3.1 Development Department: Revised by the Development Department according to the validity and appropriateness of the document.
3.2 Production Department: Responsible for the operation of equipment.
3.3 Public Works Department: Responsible for the maintenance of equipment.
3.4 Non-relevant personnel shall not adjust the parameters of the machine at will.
4, the operation process:
4.1 Check before energizing the machine
1, check the supply power line for any damage.
2, check whether the equipment is well grounded.
3. Check whether the control buttons are reset.
4, check whether the width of the guide rail is appropriate.
5, check whether the belt is loose.
6, above no abnormality can be started ready to work.
4.2 Operation sequence
1, control panel description
FINISH?button without self-locking, each press, indicating that the inspection is complete,
PCB board through, continue to run.
PASS/CHECK? button is not pressed to indicate that
PASS? PCB does not need to be checked and passes through automatically; press
CHECK? indicates that PCB needs to be checked manually and needs to be used in conjunction with FINISH.
POWER? is the power switch, press to energize.
LIGHT? is the lighting switch.
2, the operation step by step instructions
A, according to the front and rear connected to adjust the speed of the belt running.
B?Automatic control mode
1?Press the POWER button;
2?Press the LIGHT button;
3?Press the PASS/CHECK button.
3. Manual control mode
1. Press the POWER button;
2. Press the LIGHT button;
3. When the check is finished, press the FINISH button.
4. Turn off the machine and press the POWER button
5. Precautions
1. Make sure that the transportation part, the belt, the pulley and the transportation guide are free of foreign objects, and make sure that the transportation is smooth and steady.
2. Regularly refueling the transmission part and rack and pinion or widening screw, refueling must be carried out in the state of shutdown.
3. In case of power failure, turn off the power switch of the equipment immediately.