(1) In this work, we should be really serious and responsible, and the whole staff should comprehensively find out the bottom of the house, and carry out a detailed investigation of all the equipment and facilities, operational activities, and public and auxiliary equipment, especially digging into the hidden disaster-causing factors, and never carry out the work with an approximate or almost mentality.
(2) in the risk grading work, we should be detailed against the relevant standards, norms, operating instructions, equipment operating instructions and other relevant provisions, a detailed and comprehensive analysis of the relevant risks, only in the risk hazard analysis phase of the relevant risk analysis in place, measures to take, design in place, in order to systematically identify the risks at the source, grading and control of risks, in order to truly reduce the potential for accidents and ensure production safety.
(3) risk level grading, control
In the risk grading work, we must control the risk grading and control implementation rules requirements, against the standard description, accurately selected the possibility of accidents (events), the occurrence of accidents and events deviation generated by the severity of the consequences of the seriousness of the severity of the exposure to the hazardous environment of the frequent degree of scores, the accurate calculation of the risk value, to carry out the correct grading.