Construction Content of Comprehensive Development Project of High-speed Railway New Area in Gu'an County, Langfang City, Hebei Province

Legal analysis: six parts of the municipal transportation engineering, municipal infrastructure supporting engineering, greening and landscape engineering, public **** service facilities engineering, demolition and resettlement housing engineering and smart city engineering within the 5.92 square kilometers of the new high-speed railway area are planned.

(1) Municipal transportation project. Construction of road works 42.937km (including main roads, secondary roads and side roads), road area of 1,121,900 square meters, supporting the construction of traffic engineering, road lighting, slow traffic.

(2) Municipal infrastructure supporting works. 1 boiler house; total length of communication pipeline is about 43,775m; 1 sanitation garbage transfer station, 1 sanitation office, 6 public toilets; 4800m levee of the main canal of the Citation River; 1 first-class fire station (covering an area of about 4100m2).

(3) Greening and landscape project. Construction of three theme parks, namely, Aviation Theme Park, Creative Park and Sports Park, as well as community parks and street green areas, *** totaling 1007300m2.

(4) Public ****service facilities project. Construction of a comprehensive transportation hub with a floor area of 46,000m2, construction of an international hospital (300 beds) with a floor area of 37,000m2, and a business building with a floor area of 43,860m2.

(5) Demolition and resettlement housing project. Involving the demolition and relocation of 1138 villagers, supporting the construction of resettlement houses of 259,560m2.

(6) Smart City Project. Includes network infrastructure, cloud computing center construction, intelligent transportation system, intelligent energy system, intelligent government system, intelligent environmental protection system, intelligent city management system, intelligent security system and intelligent medical system.

Legal basis: "Railway Safety Management Regulations"

Article VIII of the railroad construction project investigation, design, construction, supervision and construction materials, equipment procurement, shall be subject to tender.

Article IX engaged in railroad construction engineering survey, design, construction, supervision activities of the unit shall obtain the appropriate qualifications, and in the scope of its qualification level permitted to engage in railroad engineering and construction activities.

Article 10 of the railroad construction units should be selected with the appropriate qualification level of the survey, design, construction, supervision units for construction, and the construction of quality and safety supervision and inspection of construction works, the production of inspection records to be kept for inspection.

Article 11 of the railroad construction project investigation, design, construction, supervision shall comply with laws and administrative regulations on the quality of construction works and safety management, the implementation of national standards, industry standards and technical specifications.

Railway construction projects, survey, design, construction units according to law on the survey, design, construction quality is responsible for supervision units according to law on the construction quality supervision responsibility.

High-speed railroads and railroad construction projects with complex geological structure of the implementation of engineering geological survey supervision system.

Article XII of the railroad construction project safety facilities should be designed at the same time as the main project, construction, put into use at the same time. Safety facilities investment should be included in the construction project estimates.