Maintenance has three meanings, namely replacement of parts, repair of parts, modification according to function, maintenance and restoration, maintenance, maintenance and repair. Equipment maintenance refers to technical activities performed to restore the functionality of equipment after its technical condition has deteriorated or malfunctioned. For more maintenance contract templates, click "Contract Template" to view.
How to write a maintenance contract agreement 1
Party A:
Party B:
Because Party A There is a water seepage problem on the roof of the company's building during use. Party B is responsible for repairing the water seepage on the roof of Party A's house. After negotiation between the two parties, the agreement is as follows:
1. Maintenance time: from X, month, X, 20X to 20X Ending on X month X day of year.
2. Maintenance location: Peacock Lake Sports Center
3. The maintenance plan must be confirmed by Party A, and Party B should obtain Party A’s consent before repairing.
4. Maintenance and supervision of maintenance quality: All water seepage parts involved in the house must be repaired. During the maintenance period, Party A must regularly send personnel to the site to supervise quality and assist with some work. During the construction period, the construction party is responsible for the safety of personnel during construction. Party B will be responsible for any work-related injuries.
6. Precautions during the house maintenance period: Party A is obliged to assist Party B in making various pre-construction preparations (such as the stacking of garbage materials).
7. Acceptance and review of the quality of the house after repairs: It shall be agreed in advance by both parties (mainly to solve water leakage) or the relevant industry standards shall be used as the acceptance criteria.
8. Party A is responsible for paying all water and electricity expenses incurred during the maintenance period.
9. According to the negotiation between the two parties, this maintenance will be implemented by Party B by contracting the work but not the materials.
10. The total maintenance cost of this project is RMB 10,000 (10,000.00 yuan), and five thousand yuan (5,000.00 yuan) will be paid on the day of completion of the project. The entire balance must be paid on the expiration date of the warranty period.
11. This house leakage repair contract is in duplicate, with each party holding one copy.
12. Regarding warranty: The warranty period is 6 months, starting from the date of completion of maintenance. If a problem occurs during the warranty period, Party B shall immediately send staff to check and take other relevant measures.
13. Other matters not covered shall be resolved through friendly negotiation between the two parties.
Party A (official seal): _________ Party B (official seal): _________
Legal representative (signature): ________ Legal representative (signature): _________
< p> _________year____month____day_________year____month____dayHow to write a maintenance contract agreement 2
Employer (full name ): (hereinafter referred to as Party A)
Contractor (full name): (hereinafter referred to as Party B)
Party A and Party B shall, in accordance with the "Construction Law of the People's Republic of China" and "Construction Law". According to the "Project Quality Management Regulations" and the "Housing Construction Project Quality Warranty Measures", the maintenance of commercial and residential buildings and horizontal resettlement houses in Yining Xincun, Ningxiang Economic Development Zone is contracted to Party B and the following points are reached:
1 , Maintenance project content and requirements
1. After Party B receives the maintenance contact form from Party A or the community property company, if conditions permit, Party B will organize personnel or equipment to carry out maintenance within 1 day, and the maintenance will be completed. Invite Party A and the property management company to jointly accept the property and form an acceptance document for settlement.
2. For repairs for customers who have already moved in, the customer is required to sign for confirmation after the repairs are completed.
3. If the contractor does not send someone to repair within the agreed time limit, the contractor can entrust others to repair it.
4. If an emergency repair accident occurs, the contractor shall immediately arrive at the accident site for emergency repairs after receiving the accident notification.
2. Scope and Content of Project Quality Warranty
The contractor shall provide warranty for the repaired project in accordance with relevant regulations. During the quality warranty period, the contractor shall comply with the management provisions of relevant laws, regulations and rules. It was agreed with both parties that the quality warranty responsibility for the repaired projects shall be carried out in accordance with the "Quality Warranty Measures for Housing Construction Projects" of the Ministry of Construction and the quality warranty period for the repaired projects (at the same location) is as follows:
1. Roof waterproofing Leakage prevention for projects, toilets, houses and exterior walls with waterproofing requirements is 5 years;
3. Decoration projects are 2 years;
4. Electrical pipelines, water supply and drainage The pipeline and equipment installation project lasts for 2 years;
5. The heating and cooling system has two heating periods and a cooling period;
6. Water supply and drainage facilities in residential areas , roads and other supporting projects are 2 years;
7. The warranty period for other projects is as follows:
The quality warranty period is calculated from the date of project acceptance.
3. Rights and Obligations of Party A and Party B
(1) Rights and Obligations of Party A
1. Party A’s engineer will cooperate with Party B Construction, exercise the powers stipulated in the contract, issue instructions and visas to Party B to ensure the smooth progress of the project.
2. Determine the construction scope on site and verify the project quantities.
3. Organize relevant units to conduct acceptance and assess quality standards.
4. Pay the project fee according to the time limit stipulated in the contract.
5. Responsible for the relationship coordination between various departments.
(2) Rights and obligations of Party B
1. Provide relevant construction plans.
2. Carry out construction management according to building regulations, and construct in strict accordance with the established plan and construction operation specifications to ensure project quality.
3. Pay close attention to production safety and strictly prevent accidents. Party B will be responsible for the losses and impacts caused by safety accidents or liability accidents.
4. The environment must be kept neat and clean after completion every day.
4. Maintenance pricing and payment
Maintenance is priced separately for each location. The cost is determined by Party A in conjunction with the property owner based on market conditions, and is settled monthly after summary. , 5% will be reserved as a quality deposit, which will be paid after passing the re-examination one month after acceptance.
5. Maintenance costs
Maintenance costs shall be borne by the party responsible for the quality defect.
6. Liability for breach of contract
Party A and Party B must strictly perform all the terms of the contract and shall not breach the contract. Otherwise,
the other party has the right to pursue its liability for breach of contract and 10% of the total project price will be imposed as liquidated damages.
The following situations are breach of contract:
1. Failure to construct according to the prescribed plan and quality standards, resulting in poor quality.
2. Unable to complete the project tasks within the specified time limit.
3. On-site management was chaotic and was criticized and punished by relevant functional departments.
7. This contract is made in triplicate, with two copies for Party A and one for Party B. It shall be signed or stamped by both parties and take effect. The project will terminate automatically after it is fully completed and accepted and the project payment accounts are settled.
Contractor (official seal): Contractor (signature):
Legal representative (signature): ID number:
Authorized agent (signature) :
Year, month, day, year, month, day
How to write maintenance contract agreement 3
Party A: ______________
Party B: ______________ < /p>
In order to promote the socialization process of our school’s logistics work, in accordance with the "___________", Party B will undertake the sporadic maintenance of campus properties. After negotiation between the two parties, the following agreement was reached.
1. Trusteeship time
From _________year________month________day to _____________year________month________day.
2. Party A’s Responsibilities
1. Ensure the normal teaching, work and living order of the whole school, and supervise the school’s fixed assets and equipment.
2. Plan and approve large-scale equipment maintenance projects. Supervise Party B’s maintenance responsibilities.
3. Supervise Party B’s maintenance business and evaluate the quality of maintenance services.
4. Evaluate Party B’s target responsibilities, and supervise Party B to make corrections if the requirements are not met until the requirements are met.
5. Pay custody maintenance expenses on schedule.
6. Organize and manage the use of audit maintenance funds.
3. Party A’s requirements for Party B
1. Responsible for the daily management, maintenance and repair of the school’s water, electricity and power facilities (pump room, high and low power distribution, indoor and outdoor water and electricity lines) .
2. Responsible for the daily maintenance of school-owned buildings and doors, windows, tables, chairs, and beds in the buildings, as well as the daily management and sporadic maintenance of infrastructure (manholes, sewers, septic tanks, etc.).
3. Responsible for the maintenance of school communication equipment.
4. Carry out frequent and proactive inspections and timely repairs to ensure that school equipment is in good condition and operating normally, and to save costs and improve item utilization as much as possible.
4. Party B
1. Ensure the normal teaching, work and living order of the whole school, and maintain the school’s fixed assets and equipment.
2. Manage the maintenance personnel well, with clear responsibilities, proficiency, good work style, good service attitude.
3. Establish and improve effective project business maintenance and repair rules and management rules and regulations.
4. Take full custody of state-owned assets, strictly prevent damage or loss of state-owned assets, and maintain equipment integrity rate above 95%.
5. Not only ensure supply, but also prevent waste and loss, actively save water and electricity, establish a responsibility contracting system and a patrol inspection system, and link rewards and punishments.
6. Insist on visiting sporadic maintenance services every Monday and Thursday morning.
7. Reasonably use and strictly manage maintenance funds, and accept Party A’s audit.
8. If you fail to meet the target requirements, you will be dealt with by Party A.
5. Matters not covered in this agreement shall be resolved through negotiation between the two parties.
Party A (seal): ____________
Legal representative (signature): ______
_________year_______month____day
p>Place of signing: ______________
Party B (seal): ____________
Legal representative (signature): ______
_________year______ _Month____
Place of signing: _______________
How to write a maintenance contract agreement 4
Party A: Legal representative:
< p> Party B: Legal representative:The total length of the road from Pupian to Zhongmen Sugarcane Area is 22 kilometers. Since June this year, it has been rainy and interrupted everywhere, especially in the Pulong and Dadian mountains. The landslide was more than 130 meters long and the road collapsed so badly that even bicycles could not pass. In order to repair the Pupian-Zhongmen highway as soon as possible and ensure the normal transportation of sugar cane, the following agreement has been reached through negotiation between Party A and Party B.
1. Project Quantity and Content
1. Party B is responsible for clearing the earth and rocks from the landslides in Pulong and Dadiang.
2. Party B is responsible for filling 22 kilometers of road from Putian to Zhongmen Sugarcane Area, clearing roadside landslides, and improving side ditches.
2. Project quality and requirements
1. Party B will remove all the earth and rocks from the landslides in Pulong and Dadian, ensuring that the road is 5 meters wide and retains slope protection.
2. Party B is responsible for maintaining the 22-kilometer road in the sugarcane area from Pupian to Zhongmen, clearing roadside landslides, improving side ditches, and filling the road surface.
3. Project Cost
All expenses incurred by Party B during the construction such as machinery, labor, materials, etc. shall be lump sumed up to a total of RMB 40,000 ( ¥40000. 00 yuan).
4. Payment method
After Party B completes the construction, Party A and Party B organize the acceptance, and once the project is qualified, a one-time payment of 40,000 yuan (¥40,000.00 yuan) will be paid. .
5. Safety Responsibility
Party B must pay attention to safety during construction. Party A does not bear any responsibility for any casualties that occur during construction.
6. Project duration
From the day of the month to the day of the month of
7. Legal Liability
This agreement is made in duplicate, with Party A and Party B each holding one copy. It has the same legal effect and must be abided by by both parties. Matters not covered in the agreement must be resolved through negotiation between both parties.
Party A: (signature and seal) Party B: (signature and seal)
Legal representative: Legal representative:
How to write a maintenance contract agreement 5 < /p>
Party A (contractor)
Party B (contractor)
Signing date:
Party A: Party B:
In accordance with the provisions of the "Contract Law of the People's Republic of China" and other relevant laws and regulations, combined with the specific conditions of this project, Party A and Party B, on the basis of voluntariness, equality, fairness and good faith, and upon consensus reached by both parties, signed this contract.
Article 1 Project Overview
1. Project Name:
2. Project Location:
Article 2 Project Scope
p>The scope of the project contracted by Party B:
Demolish 176 square meters of the original defective pavement and excavate 30 centimeters vertically, make a two-step 3:7 lime soil cushion, and pour 20 centimeters thick C30 concrete pavement , install road buds on road sections without road buds, make asphalt joints between old and new concrete pavements, remove construction waste generated on site, and maintain finished products.
Article 3 Contracting Method
Contracting Method: Contracting Work and Materials
Article 4 Contract Duration
1. The duration of this contract is Five working days, calculated from the date Party B enters the site.
Article 5 Project Price
(1) The project price (tax included) is: (uppercase) (lowercase) RMB yuan.
Article 6 Project Price Payment
The project drawings and details in the attachment to the contract and the content specified in the scope of the project shall be paid once and for all, and the project price will not be adjusted for any changes in conditions. The entire project must be completed according to the above "project scope" and the project payment shall be paid in one lump sum after passing the inspection and acceptance.
Article 7 Project Quality
1. Party A shall provide Party B with a set of construction drawings and make technical disclosures to Party B one day before Party B enters the site.
2. Party B shall organize the construction according to the engineering drawings, construction instructions, etc.
3. If a concealed project is involved, Party B shall notify Party A to come to the site for acceptance inspection before the project is concealed. If the inspection fails, Party B shall make rectifications and re-accept.
4. Party B guarantees that the project complies with relevant national technical standards for engineering construction.
5. The concrete, lime, asphalt, and other materials used in this project must comply with relevant national quality standards.
Article 8 Acceptance
1. After the completion of the project, Party B shall notify Party A for acceptance. Party A shall organize a joint acceptance inspection by both parties within days of receiving the acceptance notice.
2. This project shall be unanimously accepted by Party A and Party B based on the relevant standards and specifications of the construction drawings and design instructions. If the acceptance quality standards stipulated in the contract are not met, Party B will rework the work free of charge within the specified period.
Article 9 Quality Warranty
1. Party B is responsible for the warranty during the construction period in the area to ensure that the road surface is smooth and firm, and Party B also provides quality warranty. If Party B is not responsible for the warranty, Party A has the right to deduct the warranty costs incurred by Party B from other project payments, and Party B shall not question it.
2. During the warranty period, if Party B meets the warranty conditions, Party B shall repair the damaged road surface within a limited time after receiving the written warranty notice from Party A.
Article 10 Rights and Obligations of Party A
1. Before starting construction, the construction drawings shall be provided to Party B and an on-site disclosure shall be made. The disclosure shall be confirmed by both parties on-site.
3. The representative of Party A of the project shall supervise the quality and progress of the project and be responsible for confirming the project.
Article 11 Rights and Obligations of Party B
1. Party B shall cooperate with relevant departments to carry out on-site safety protection, safety facilities and garbage disposal.
2. Participate in on-site disclosures organized by Party A and cooperate in forming written disclosure documents.
3. Comply with national or local government regulations on construction site management, and properly protect surrounding buildings, equipment and pipelines encountered during construction and excavation.
4. Party B must carry out construction and installation in accordance with the construction drawings confirmed by Party A on site or provided by Party A and the installation plan and method confirmed by Party A, and shall not make any unauthorized changes. If there are any changes, a written change notice shall be provided. shall prevail.
7. If Party B violates relevant safety operating procedures or regulations during the construction process and causes quality accidents or safety accidents, Party B shall bear full responsibility and all losses caused thereby. Party A is not responsible for any joint and several liability.
Article 12 Liability for breach of contract
1. If the completion is overdue due to Party B’s reasons, Party B shall pay Party A liquidated damages for the price of the project for each day overdue. Article 13 Effectiveness and termination of the contract
1. Effectiveness of the contract
This contract shall take effect from the date of signature or sealing by both parties. The attachments attached to the contract have the same effect as this contract. This contract is made in four copies, with each party holding two copies.
Article 15 Dispute Resolution Methods
If a dispute arises between the two parties, they can resolve it through negotiation or apply to the relevant department for mediation.
Article 16 Payment Method
Party A shall pay Party B 90% of the total settlement price after the acceptance is passed and settlement is completed; the remaining 10% of the project payment shall be paid to Party B from the date of passing the acceptance. Pay in full one year from now. Party B shall issue an official national invoice approved by Party A's finance department for payment, otherwise Party A has the right to refuse payment. During the construction process, any actions by Party B that affect the construction due to villagers shall be resolved by Party B themselves. This shall not affect the progress of the construction and cannot be passed on to Party A. All costs incurred shall be borne by Party B.
Attachments to the contract:
1. Brief description
2. 1 construction drawing and a list of road maintenance project costs
(No text below)
Party A: Party B:
Representative: Representative:
Address: Address:
Telephone: Telephone:
Date: Date:
How to write a maintenance contract agreement Five 2021 related articles:
★ 2021 Five latest maintenance contract templates
★ Five formal 2021 maintenance contract formats
★ Five simple maintenance contract templates for 2021
★ 2021 standard maintenance contract Templates
★ Five practical maintenance contract templates in 2021
★ Five formal maintenance contract templates in 2021
★ Five practical maintenance contract templates in 2021
p>
★ 5 Standard Maintenance Contract 2021 Styles
★ 2021 Full Maintenance Contract Sample
★ 2021 Maintenance Agreement Format Template