Emergency plan for summer heatstroke prevention and cooling

The emergency plan defines the scope and system of emergency rescue, so that emergency management is no longer without basis and rules, especially through training and drills, it can make the emergency personnel familiar with their own tasks, with the corresponding capabilities required to complete the assigned tasks, and test the plan and action procedures, and assess the overall coordination of the emergency personnel. The following is the summer heat stroke prevention and cooling emergency plan that I brought to you, I hope it can help you!

Summer heat stroke emergency plan1

In order to implement the Bureau of Education related to the work of heat stroke notification, to ensure that the majority of teachers, students, staff health and school teaching work in an orderly manner, in the spirit of "prevention is more important than Mount Tai" idea. In the spirit of "prevention is more important than Mount Tai" idea, combined with the actual school, to develop the following emergency plan to prevent heat stroke.

First, the organization:

1, the school set up to the principal as the head of the leading group of summer cooling work.

2, carefully organized to study the relevant documents on the prevention of heat stroke, timely briefings, so that the idea in place, the organization in place, measures in place.

Second, the duties of each department:

(a) Political Education Office, Academic Affairs

(1) to do a good job during the high temperature duty arrangements.

(2) If there is a need for temporary suspension of classes in the event of hot weather to notify the class teacher at the first time.

(3) Do a good job of arranging activities for students in hot weather due to power outages and class closures.

(4) Do a good job in the heat of the period to prevent heat stroke, safety and other knowledge of education.

(2) General Affairs Office

(1) before the arrival of high temperature, the organization of personnel on the school of all cooling facilities to check, if damaged timely repair, to ensure that the normal use of the high temperature season, and the situation will be informed of the departments in a timely manner.

(2) Do a good job of preventing heat stroke and cooling the meticulous work (buy the necessary items to prevent heat stroke, such as green beans).

(3) Do a good job in the school electricity, water (drinking water), ice and other necessary items to protect against heat stroke.

(3) classroom teachers

(1) Each classroom teacher should manage the classroom drinking water, to ensure that the students drinking water ` quality.

(2) The floor of the class should be sprinkled with water in time, and the students should prepare a clean towel and soak it with water to amble over their heads or necks if necessary.

(3) Be sure to diligently observe the students' physical reflections when it is hot.

Third, other work:

Prevention of heat stroke is a comprehensive work, the whole school departments should cooperate with each other, support each other, on call. Departments should strive to do their jobs, combined with the prevention of heat stroke and the actual situation of the post, the scope of responsibility for the work of a check at any time at the disposal of the school heat stroke leading group, *** with the efforts of the collaboration, to do a good job this year's prevention of heat stroke.

Fourth, specific measures:

First, do a good job of heat stroke prevention publicity. The use of campus radio, theme class meetings and other forms of publicity to students to publicize the general knowledge of heat stroke prevention, education students to actively deal with hot weather. Actively guide teachers and students in the hot weather to maintain a calm state of mind, unity and harmony, stable learning and work.

The second is to strengthen dietary safety management. Schools to strengthen the commissary health checks, must be sterilized, must open the doors and windows to ensure ventilation. Guarantee students drinking water hygiene, to prevent infection of gastrointestinal diseases.

Third, reduce the students outdoor exercise. Cancellation of recess, physical education and other strenuous activities, to avoid prolonged exposure to the outdoors, strenuous exercise.

Fourth, to ensure that students have enough rest. The first step is to strengthen the duty, to maintain a safe and stable rest environment, to ensure that the students' mental state.

Summer heat stroke emergency plan2

In order to ensure the smooth construction of the new Xingtai modified asphalt base project in Hebei, to ensure that in the construction of emergencies, the emergency rescue work can be rapid and effective, maximize the protection of the enterprise workers' lives, property safety, according to the characteristics of the project, the development of this plan.

First, this plan is for the construction of a variety of different emergencies developed to ensure that a variety of emergency resources are in a good state of readiness; and can guide the emergency action in accordance with the plan in an orderly manner, to prevent the delay of the accident due to the action is not effective or on-site rescue work in the confusion of the emergency, thereby reducing casualties and property damage. Emergency in construction refers to the emergence of a sudden, causing or likely to cause more casualties, larger economic losses of all types of construction accidents.

Second, the establishment of construction emergencies emergency leading group, responsible for the command and coordination of emergency rescue work. Leading group commander-in-chief by the branch manager Sun Qi is responsible for the implementation, if the commander-in-chief out of the assistant manager Lu Zhili as deputy commander-in-chief to give implementation, when the deputy commander-in-chief is not in the case, by the team leader to implement. The implementation of rescue work, specific personnel arrangements see emergency plan organization.

Third, when the project and building construction in the occurrence of high temperature in a variety of emergency symptomatic situation, received an emergency report, should immediately start this plan. In the first time, respectively, to the company's emergency rescue command center, "120" ambulance center for help, and to the municipal Bureau of Work Safety Supervision, the Federation of Trade Unions and other relevant departments to inform the situation. After the emergency, should also be uninterrupted to the relevant leaders, departmental feedback follow-up.

Fourth, in the construction of emergencies, the branch that is, as appropriate, set up a rescue site command, by the manager of the Sun Qi as the accident scene commander, and set up the following leading groups:

1, heat stroke protection group

summer work process, due to the more open-air working environment; personnel work in the distribution of the region is complex and variable; labor intensity and other aspects of the impact In order to protect the legitimate rights and interests of workers and life, property safety, for the staff to create a secure, comfortable environment, in the staff of the occurrence of high-temperature adverse reactions, by the team leader to immediately organize the members of the group, the accident personnel to transfer and control, to prevent the increase in the surrounding scene of the accident personnel. Make the emergency action has a stronger target, improve the efficiency of the action. So as not to cause huge accident losses.

2, information liaison group

by the head of the group is responsible for understanding the casualties and economic losses and the scope of the impact of emergencies, the daily organization of the collection of weather and temperature conditions, and then take the necessary precautions, and on the measures taken and the development of the situation, and timely reports to the superiors and the liaison of relevant departments.

3, safety and security (vigilance) group

The evacuation area and the settlement area of the security work, the team leader is responsible for organizing team members to monitor the development of dangerous conditions, to prevent the impact of the construction period, and to strengthen the safety education of the personnel of the various shifts in order to further enhance the awareness of safety and the organization of the site management personnel to carry out a safety inspection of the construction site to eliminate potential safety hazards, in order to prevent the occurrence of accidents and once an accident occurs, how to prevent the occurrence of accidents and how to prevent the occurrence of accidents. The occurrence of accidents and how to minimize the impact of accidents once they occur.

4, on-site medical rescue team

When the accident occurred, the team leader organized by the team members of the casualty on-site classification and first aid treatment, is responsible for the first time to the injured to implement effective rescue; and timely transfer to the hospital. The main responsibilities of the ambulance staff are: to enter the accident area to rescue the injured; to guide the people in the hazardous area to carry out self-rescue and mutual rescue activities; to centralize, count, transport and admit the injured. According to the specific circumstances, the rapid development of emergency treatment programs and organization and implementation.

5, logistical support team

by the head of the organization is responsible for mobilizing rescue personnel, materials and equipment, supervise and check the implementation of rescue and relief measures in place.

5, in the construction of the emergency occurred, the rescue site command according to the specific circumstances, can be nearby from Xingtai Road and Bridge asphalt library mobilization rescue teams, personnel, materials and equipment. At the same time professional rescue team, materials and equipment from the emergency reserve rescue team mobilization.

Six, after the occurrence of various types of emergencies, the need to mobilize the main professional rescue teams, emergency rescue materials. The main materials and personnel duties are arranged as follows:

1, personnel, materials preparation:

The acquisition of branch materials by the manager is responsible for the main medicines and medical rescue appliances are as follows:

(1) medicines: cold medicines, fever medicines, diarrhea medicines, anti-inflammatory medicines such as therapeutic medicines and Rentan, ten drops of water, Zhengqi Shui, Chrysanthemum Tea, fire-reducing herbal teas, green health food, green bean The company's website is a great source of information about the company's products and services.

(2) ambulance apparatus: single frame, ambulance cars, small oxygen cylinders, earpiece, hospital beds, towels, medicine boxes, freezers (ice) and so on.

VII. Rescue methods :

1, mild patients

When the site staff dizziness, fatigue, dazzle phenomenon, the staff should immediately stop the operation, to prevent secondary accidents, other peripheral staff should be symptomatic personnel arranged to the cool, well-ventilated area to rest, the supply of cool water, wet towels, etc.. And notify the leadership of the branch.

2, serious patients (fainting, shock, severe body dehydration, etc.)

When the work site appears heat stroke personnel, the operation of the peripheral staff should immediately notify the leadership of the branch plant, and promptly transfer the accident personnel to a cool, well-ventilated area to observe their symptoms, so as to facilitate the arrival of medical personnel to grasp the first-hand information on medical treatment. The branch plant should be based on the specific circumstances, the emergency commander decides whether to start the emergency plan for heat stroke prevention and cooling. And immediately organize ambulance personnel in person to the scene of the accident personnel treatment. In case of serious symptoms, if the medical equipment of the branch plant can not save the person, the person should be transferred to the nearest hospital for observation and treatment at the first time. And reported to the company.

Aftermath work:

1, according to the accident "four do not spare" principle, do a good job of investigating and handling accidents, take targeted preventive measures, strengthen the publicity and education for the team, so that each person masters the precautions in the summer construction process, so that each person knows how to protect themselves; know how to save others. Know how to save others. Summarize the lessons learned, to prevent the occurrence of similar events, the specific precautionary measures are as follows:

(1) by the information team in the construction site set thermometer, and the daily weather conditions for the collection, processing, and then reported to the plant to prevent heatstroke protection team, according to the specific circumstances of the corresponding safety precautions taken.

(2) When the outdoor temperature is higher than 39 ℃, the plant should be the construction of each team to cool down the special safety briefing, so that the team to stop the site construction work.

(3) The logistics support team should be able to ensure that the staff site at any time drinking water, emergency drugs.

(4) by the heat stroke emergency rescue organizations in accordance with the temperature of the year to develop a set of reasonable and effective "staff schedule" to avoid the highest temperature every day time (11:00 ~ 15:00) section of the construction work. Discussed by the branch, the development of the company's summer (based on the city's calendar year high temperature months for July to September) construction schedule, as follows:

Morning: 8:00 to 12:00

Afternoon: 15:00 to 19:00

In case of a rush or other special circumstances require overtime work, and then make a further notice.

(5) Branch of the safety education of the team to enhance the ability of staff to deal with various situations should be tight. Strengthen the summer construction safety publicity work, so that each person understands and masters the safety of heat stroke prevention and cooling common sense, improve the staff's ability to cope with the strain of practice and processing capacity.

Eight, emergency recovery, re-entry

When the emergency recovery, re-entry must be evaluated before the hazardous area, and should be analyzed for accidents, to be determined by the hazardous area has been safe before entering the scene, continue to operate.

IX, emergency drills

Emergency plans and emergency plans established, after effective training, branch or company before the arrival of the summer each year to carry out large-scale rescue drills. At the end of each exercise, a timely summary, there are certain gaps in the future work to improve.

1, the purpose of the exercise

1) test the effectiveness of the emergency plan and implementation procedures and the degree of adequacy

2) test the emergency equipment

3) to ensure that the emergency response organization is familiar with their tasks and responsibilities

4) test the coordination of the emergency response personnel

5) identify and correct the defects in the plan

6)Test the adequacy and effectiveness of emergency equipment

2. Emergency plan drills

In order to improve the technical level of rescue personnel and the overall ability of the rescue team, so as to achieve rapid, orderly and effective results in the rescue operations of the accident. The branch will regularly carry out a rescue drill, emergency rescue training has become an important work of the rescue team, so in the emergency rescue process, the branch also emphasizes the following four points:

(1) the drill personnel must be on time in place, and with their respective protective equipment.

(2) In the rescue process should do "self-protection, rescue others" and active and effective rescue.

(3) must strictly abide by the command of the relevant leaders, to do "false to the truth", the effective implementation of rescue measures.

(4) The basic task of emergency training and exercises is: to exercise or improve the team's unexpected accident situation of rapid rescue and blocking the source of timely rescue of the injured, correctly guiding and helping the masses to protect or evacuate, effectively eliminating the consequences of the hazards, to carry out on-site emergency first aid and casualty evacuation and other emergency rescue skills and emergency response to effectively reduce the hazards of the accident, reduce the accident losses.

Summer Heat Stroke Emergency Response Plan3

In order to protect the occupational health of employees, to prevent heat stroke affecting the health of employees, this plan is formulated.

First, the emergency leadership group personnel list

Leader: ____

Deputy Leader:

Members:

Second, the emergency leadership group office:

Emergency response office is located in the office of the project department.

Telephone:

Nanjing Hospital Tel: ____

___ Phone:

Third, the start and termination of the plan

In summer, the outdoor temperature of 37 ℃ or more, by the emergency response team leader ___ declared the start of the emergency plan. Outdoor air temperature for 15 consecutive days at the bottom of 37 ℃ or less, by the emergency response team leader announced the termination of the heat stroke prevention plan.

Fourth, the symptoms of heat stroke

In the summer heat season, headache, dizziness, vomiting, nausea and other symptoms, can be judged as heat stroke.

V. Emergency measures:

1, the emergency team leader announced the start of the heat stroke emergency plan, by ____ is responsible for the development of new construction operation time, the operation time must avoid the high temperature at noon.

2, ___, ____ is responsible for the staff dormitory to buy and install fans and other cooling equipment.

3, ____, ___ do a good job of summer heat knowledge publicity, in the form of a letter to the staff, blackboard newspaper, etc. to teach employees a variety of measures to prevent heat stroke.

4, ___ is responsible for the construction line employees issued heat stroke medicines, such as Ren Dan, chrysanthemum tea, wind oil essence.

5, by ___, ___, supervision of the project department and the team canteen, required to do every day to the staff of the green bean soup and other heat stroke food, the site has a supply of boiled water equipment.

6, employees appear heatstroke, immediately report to the emergency response team, the team leader according to the heatstroke situation to organize the emergency response team part, all and other personnel of the project for emergency treatment.

7, other members of the team for the motorized personnel, do a good job with the work.

Six, external contact telephone:

Nanjing Emergency Center Tel: 120

Nanjing Environmental Protection Bureau Tel: ____

Summer Heat Stroke Emergency Response Plan4

1, Purpose:

In order to prevent the company's employees in the high temperature climate work phenomenon of heat stroke. Heatstroke phenomenon, to ensure that the company's production goes smoothly, to ensure that employees appear heatstroke and other emergencies, can quickly and effectively start the emergency rescue work, to maximize the protection of employees' physical and life safety specially formulated this plan.

2, responsibilities and scope of application:

The company's safety management committee for the implementation of the plan responsible for the department, the plan applies to all departments of the company, the key preventive units are: stereotypes process, composite process, inspection sections, warehouses, boiler room, equipment and power department, canteen, and so on.

3, the emergency plan to start:

Based on the maximum temperature of the day published in the local newspaper, the highest temperature for three consecutive days above 37 ℃ or the highest temperature of the day up to 38 ℃ automatically start the emergency plan, the company's all departments in accordance with the emergency plan for the implementation of the work measures.

4, emergency plan implementation

(1) equipment and power department should strengthen the management of summer water and electricity supply, to ensure that the workshop production of electricity and water needs. In the event of special circumstances require power outages, water outages, should be notified to the relevant departments in advance, and according to the specific circumstances of the development of appropriate preventive programs.

(2) widely publicize the prevention and treatment of heatstroke knowledge, so that employees master the basic knowledge of heatstroke prevention and cooling; workshop management cadres should strengthen the workshop every day to inspect the production situation, and timely understanding of the workshop's high-temperature environment and the physical condition of the workers, and deal with the problems that arise in a timely manner, to nip the accident in the bud.

(3) Equipment and Power Department is responsible for purchasing a batch of cooling medicines in advance, and distributing the medicines to each process and each position according to the requirements. The company has set up herbal tea buckets in each drinking water place to ensure the supply of herbal tea every day.

(4) Workshop key processes and key high-temperature positions equipped with cooling fans. Every day at 10:30 am and 2:30 pm to arrange for employees to take a 20-minute break in the shade and ventilation.

(5) The company's cafeteria should be supplied with ice water twice a day to the production line of the workshop, respectively, at 10:30 am and 2 o'clock in the afternoon. Every day at noon to supply employees with two buckets of free seaweed egg soup. Specifically by the company office is responsible for the implementation.

(6) The company's fleet should ensure that at any time to set aside a car and equipped with a good driver, in order to cope with the handling of emergencies. Specifically by the company office is responsible for.

(7) heatstroke rescue methods:

Mild patients: company employees in the normal operation of dizziness, fatigue, dazzle phenomenon, should immediately stop the operation, to prevent secondary accidents, other peripheral employees should be arranged to the symptoms of the person to the cool, well-ventilated area to rest, the supply of cool water, medicines, wet towels and so on. And notify the workshop or departmental leadership.

Severe patients: (fainting, shock, severe dehydration of the body, etc.) company employees appear heat stroke, the operation of the surrounding staff should immediately notify the workshop or departmental leadership, and promptly transfer the accident personnel to a cool and ventilated area, observe their symptoms, so as to facilitate the arrival of medical personnel to grasp the first-hand medical information. The company office immediately organize rescue personnel in the first time to transfer the heatstroke patients to the nearest hospital for observation and treatment. And reported to the company.

Attachment: clinical manifestations of heatstroke:

Mild heatstroke: clinical manifestations of dizziness, headache, flushing, thirst, profuse sweating, generalized fatigue, palpitations, rapid pulse, lack of concentration, uncoordinated movements and other symptoms, body temperature rises to 38.5 ℃ or more.

Severe heat stroke: including three types of pyrexia, heat cramps and heat exhaustion, can also appear mixed. Among them: pyrexia (including diarrhea), also known as heat stroke hyperthermia, which is characterized by a sudden onset in a hot environment, body temperature up to 40 ℃ or more, a lot of sweating in the early stages of the disease, followed by "no sweating", which can be accompanied by dry skin and varying degrees of impaired consciousness. Heat cramps mainly manifested as obvious muscle spasm, accompanied by contraction pain. Prevalent in the more active limb muscles and abdominal muscles, especially the gastrocnemius muscle. It is often symmetrical. It may flare up from time to time, and may be relieved from time to time. The patient's consciousness is clear and body temperature is usually normal. Heat exhaustion has a rapid onset, mainly characterized by dizziness, headache, sweating, thirst, nausea, vomiting, followed by cold and clammy skin, decreased blood pressure, cardiac rhythm disorders, mild dehydration, and a slightly high or normal body temperature.

(8) Emergency response process:

Normal working hours and holidays:

The incident occurred --- notify the department or workshop leaders --- office --- arrange vehicles to hospital treatment --- processing and aftercare work

Night:

The incident occurred --- notify the team leader or duty cadres --- company security team The head of the company's security team --- arrange vehicles to hospital treatment --- processing and aftermath work

Attachment contact number:

Summer heatstroke prevention and cooling emergency plan 5

Currently, the summer season, the intensity of sunshine is high, the high temperature of the weather continues, in order to effectively do a good job of summer construction of summer heatstroke prevention and cooling work for the high temperature of Haiyang city's actual situation, the actual situation. Take effective measures to actively respond to the hot weather, in order to effectively protect the staff's health and safety, and strive to improve the staff's working environment and living conditions, and effectively prevent the occurrence of safety accidents and high temperature heat stroke and other events, to ensure the safe production of wind farms.

Continued high temperature in summer, the site operators are very easy to fatigue, heat stroke, in order to ensure that the site of the front-line personnel personal safety and health, now on the site of the personnel of the heat stroke prevention and cooling work to take the following measures:

1, the development of heat stroke prevention work plan, rationalize the arrangement of work, to prevent the hot weather caused by the operators of the heatstroke and all kinds of production and safety accidents.

2, the proper arrangement of operation and production during the high temperature, reasonable adjustment of operating hours, reasonable arrangement of workers' rest time, reasonable labor rest system, according to the specific circumstances in the conditions of higher temperatures in the operating hours adjusted to: 8:00 am to 12:00 pm 15:00 pm to 19:00 (according to the weather temperature can be reasonably adjusted), strict control of overtime work, the heat The wind farm stops outdoor open-air and high place work during the time, to prevent workers from fatigue, overworked, resulting in casualties.

3, the strict implementation of workers to prevent heat stroke items and medicines, the purchase of mineral water, to ensure uninterrupted supply of drinking water at the site, the kitchen cooking green bean soup drinks (including tea, various soups, etc.) its salt concentration is generally 0.1% to 0.3%, to prevent dehydration, heat stroke; wind farms are equipped with the necessary medicines to prevent heat stroke, equipped with a medical box. Regularly issued to all shifts and front-line workers in sufficient quantity to prevent heatstroke medicines, these drugs are: the water Qingliang oil and so on.

4, in the hot season to ensure that workers have enough rest, reduce fatigue. Shandong Runhai Wind Power Development Co., Ltd. wind farm regulations:

(1) collective dormitory, 22:00 pm on time to rest, to avoid interfering with and affecting sleep.

(2) carry out publicity and education work to ensure that the operating personnel after work can eat well, sleep well and rest well.

(3) In order to ensure that the operating personnel to fully rest, to do with labor and avoid overtime.

5, in the summer season according to the needs of the work, as far as possible to take diligent shift method to shorten the time of a continuous operation, to strengthen the work of the rotation of rest. Operators should be pre-employment and into the summer before the physical examination, where suffering from cardiovascular system diseases, hypertension, ulcer disease, emphysema, liver disease, kidney disease and other diseases should not be engaged in high-temperature work and work at height.

6, for the summer heat, dry weather, fire accidents are prone to the actual situation, to further strengthen the fire prevention measures, distribution boxes, warehouses and other flammable places to carry out regular inspections, found that the problem is immediately dealt with, and at the same time, according to the provisions of the effective fire-fighting equipment.

7, to strengthen the publicity of the knowledge of prevention of heatstroke, to carry out measures to prevent heatstroke education, combined with the elimination of pests and disease hygiene, should be the high temperature workers to strengthen the prevention of heatstroke and first aid first aid in the Department of publicity and education.

8, effectively do a good job of wind farms. The wind farm, the strict implementation of food hygiene laws and regulations, to strengthen the drinking water, food hygiene management, to avoid food spoilage caused by poisoning. At the same time, strengthen the monitoring of summer-prone diseases, to eliminate the occurrence of infectious diseases on site operators. Food poisoning can be reported to the relevant departments in a timely manner.

9, summer in order to prevent the occurrence of infectious diseases, wind farms living garbage should be concentrated in the parking lot east of the dumpster, and to do timely cleaning. Strengthen the canteen, toilet hygiene inspection, and resolutely prevent the consumption of rotten and spoiled food, strictly control the entry of disease by mouth, attach great importance to the prevention and control of infectious diseases in the summer, found that employees are not feeling well to rest in a timely manner, the disease should be treated in a timely manner.

10, strengthen the wind farm temporary power management. High-temperature season operation, the operator's body more exposed parts of the body, the body is easy to sweat, very easy to cause electrocution accidents, the operation site should be strictly enforced electricity norms, to strengthen the safety of electricity management, is strictly prohibited to connect the wires, and to strengthen the electricity daily inspection system, found that the problem, the timely rectification and implementation.

11, strengthen the supervision:

(1) wind farms will be operating personnel life security and labor protection into the scope of the daily supervision of production safety, and is included in the civilized production of one of the necessary conditions.

(2) Wind farms conscientiously implement and formulate effective protective measures for operations during the high temperature season, and strengthen the management of the work belonging to them to ensure safe production.

12, pay attention to the summer high temperature cooling work, self-check and self-correction of this project, the above measures to seriously implement, to ensure the stability of summer safety production and the physical and mental health of the operating personnel.

Summer Heat Stroke Prevention and Cooling Emergency Plan Related articles :

★ 2022 first half of the work summary report of 30

★ safety knowledge contest activities program compilation

★ the latest safety inspection reflection summary report

★ high school examination during the safety of the emergency plan

★ ★ The notice of the summer cooling 3 articles

★ Rainy season flood control production safety work plan 8 articles

★ In the production safety meeting summary speech

★ Production safety work program

★ Kindergarten safety precautionary system summary of the work of the report of the preferred ten

★ Production safety work plan 2022 the latest