E-contract

Six examples of electronic contracts

With the growing popularity of the concept of law, many occasions can not be separated from the contract, the contract coordinates the relationship between people and people, people and things. Then the question comes, in the end, how to draw up the contract? The following is my carefully organized e-contract 6, for reference only, we take a look at it.

Electronic Contract Part 1

Electronic Products Purchase and Sale Contract

Party A:

Party B:

Electronic Products Purchase and Sale Contract

Party A: (hereinafter referred to as Party A)

Party B: (hereinafter referred to as Party B)

Based on the "People's Republic of China **** and the State of the Law of Economic Contracts", Party A and Party B In the spirit of equality, voluntariness, reciprocity, the principle of mutual benefit, on the distribution of Party B, Party A agent products, the two sides reached the following agreement terms:

First, the contract period: the contract signed by both parties since the A and B came into force, in Party B to pay all the money after the contract is automatically terminated.

A and B on the basis of equality and mutual benefit, by friendly consensus to reach an agreement on the purchase and sale of electronic products, to enter into this contract for both parties *** with compliance: First, the product sales price:

1, the price of the product to the party's quotation shall prevail. In the event of manufacturers price adjustment, Party A will be days in advance to notify Party B in writing to implement the new price.

2, Party B should be strictly in accordance with Party A's wholesale reference price for product sales.

Second, the contract settlement:

1, in order to protect the smooth performance of this agreement, Party B shall pay Party A a deposit of RMB yuan; deposit in the fulfillment of this agreement, Party B has not violated the relevant provisions of this agreement, by Party A one-time interest-free return to Party B.

2, Party B shall pay a deposit of RMB yuan, which shall be returned to Party A without interest.

2, A and B contract settlement, Party B to Party A issued the order form fax, copies and Party A delivery notes can be directly as the basis for the settlement of the two sides.

Third, the mode of transportation of goods:

1, Party B's written order, Party A will deliver the goods to the location of the agreement between the two sides within 2-5 days.

2. Location: Party A is responsible for delivering the goods to Party B's designated location, the costs incurred by Party A is responsible for .

Article 1 Product Name, Price and Quantity

The details of the purchase and sale of electronic products, unit price and quantity are shown in Exhibit I and the detailed quotation. This price is recognized by both parties and is attached to this contract.

Article II contract amount of the total amount of goods yuan. Article III: Payment

Party B placed the order within 2 days after Party B to Party A payment for goods. Party B and Party A agreed that Party B in the contract year to Party A goods not less than 10,000, Party A shipments within 1 day before Party B will be the remaining amount of the payment of goods transferred to the account opened by Party A.

Article 3 Delivery place and time

1, location: Party A is responsible for delivering the goods to the location designated by Party B, the costs incurred by Party A is responsible. 2. Time: within _____ days from the signing of this contract and Party A's receipt of the advance payment. Article IV Delivery Conditions

If problems are encountered in the delivery process, the two sides should be in the spirit of mutual benefit, sincere cooperation attitude of negotiation to solve. 1, late delivery: without the permission of Party B late delivery, Party A late delivery of one day deducted in addition to Party A overdue product payment of 5% of the total amount of liquidated damages; Party A overdue 10 days of non-delivery, Party B can refuse to accept, and at the same time have the right to terminate the contract. And according to the prepayment of two times require Party A to pay liquidated damages.

2, late pickup: If Party B holds back the goods, Party A will charge 1% of the amount of the storage fee for holding back the goods. If Party B wants to suspend the goods for more than 15 days should be written in advance to obtain Party A's consent. Article V Party A responsibility

1, Party A shall ensure product quality, quality problems with the product, Party A shall be responsible for replacing or returning the product. 2, according to this contract delivery date, on time delivery.

Matters not covered in this contract, by mutual consensus, may sign a separate supplemental agreement, supplemental agreement and this contract

have the same legal effect. Article VI Responsibility of Party B

1, Party B has adopted the electronic products, the contract shall not be unauthorized changes in the process of entry into force and implementation. 2, according to this contract payment date, on time payment.

3, timely inspection of goods, Party B should receive the goods within 3 days after inspection. This contract is effective from the date of signature and seal of both parties. This contract in two copies, Party A, Party B, each party to one

Party A: Date:

Party A's representative signature (seal):

Party B: Date:

Party B's representative signature (seal):

E-contract Part 2

Party A:

Party B:

Party A, Sinopec Material Purchasing e-commerce site ( Hereinafter referred to as the e-commerce platform) operating company, Party B is a member of the Sinopec supplier network, is a supplier of e-commerce platform users.

In accordance with the relevant provisions of the Contract Law of the People's Republic of China and other laws and regulations, by consensus, the two sides signed this e-commerce platform service contract (hereinafter referred to as the contract) on matters related to e-commerce platform services:

Article I. Services and conditions

1. Party A provides e-commerce platform to provide Party B with the use of services, the specific features include but are not limited to Supplier information online management, online quotation, bidding, online bidding information feedback, etc., subject to the actual functions provided by the e-commerce platform.

2. Party A is responsible for the development and maintenance of the e-commerce platform, including but not limited to the functions described in the preceding paragraph, and to provide technical support within 8 hours of working time on weekdays.

3. Party B may use the e-commerce platform to engage in business activities related to SINOPEC's material procurement, and shall comply with national laws and regulations and SINOPEC's supplier management requirements.

4. Party B shall take measures to protect the confidentiality of the e-commerce platform user name, login password and other information, and shall bear the obligation and responsibility of confidentiality.

5. Party B shall seek technical support from Party A and provide feedback on the use of the e-commerce platform when it encounters any information errors, system failures, or functional defects, so that Party A can solve the system problems and improve the system functions.

6. In accordance with the requirements of SINOPEC's Supplier Management Regulations, if Party B is suspended from the Supplier Transaction Qualification by SINOPEC, if the actual use of the e-commerce platform in that year is less than 6 months (inclusive), the usage fee will be charged according to the 6-month period, and the remainder of the year's usage fee will be refunded by Party A.

7.

7. If Party B fails to pay the royalties in accordance with Article 2 of this contract, Party A may issue a reminder to Party B from July 1 of the year, and Party B shall complete the payment of the royalties within 30 calendar days from the deadline of the charge, or Party A shall regard Party B as giving up the qualification of using the e-commerce platform automatically, and Party A shall have the right to stop the qualification of Party B's supplier transactions.

Article 2 Fees and Payment

1. Party B agrees to pay Party A the e-commerce platform usage fee (hereinafter referred to as usage fee) on an annual basis.

2. The standard of annual usage fee is RMB3000/year. Party A may adjust the fee standard according to the operation and maintenance needs of the e-commerce platform.

3. Payment method:

Party B shall remit the annual fee to Party A's designated bank account within 10 working days from the date of signing the contract or according to Party A's request, and shall pay the annual fee in the same way from January 1 to June 30 every year from the following year. Party A's bank account information is as follows:

4. Invoice

Party A will send Party B a full-value-added tax (VAT) invoice within 10 working days after Party B's receipt of the fee, and Party B's VAT invoice invoicing information and postal address are as follows:

Article 3 Commitment and Guarantee

1. The e-commerce platform is constructed and operated to satisfy the needs of SINOPEC's online material procurement. Party A does not provide any guarantee or promise that the e-commerce platform functions to meet Party B's specific business purposes.

2. After receiving Party B's support needs and feedback on the use of the e-commerce platform in accordance with Article 1, paragraph 5 of this contract, Party A shall process and resolve the issue in a timely manner, but Party A is not obliged to agree to any request for refusal to pay or demand for the refund of royalties, or demand that Party A bear the responsibility for loss of trading opportunities on the grounds of force majeure, e-commerce platform errors, failures, or defects.

3. Except for the express agreement in this contract, we do not assume any form of commitment and guarantee responsibility to you.

Article 4 Confidentiality

1. Party A is obliged to keep Party B's data and information strictly confidential, and shall not disclose them to any third party or unauthorized personnel within Party A without Party B's permission, and shall take confidentiality measures to ensure that the data and information will not be known by any third party.

2. Due to the compliance with national laws and regulations, Party A shall not be restricted from providing relevant data and information to the outside world when receiving official requests from the relevant national judicial authorities.

3. Party B should not use the knowledge of the e-commerce platform system functions for any purpose other than using the platform.

Article 5 Changes and Termination

1. Party A and Party B may, by consensus, change or terminate this contract in writing and signed by authorized representatives.

2. If either party seriously violates the agreement of this contract, resulting in the purpose of this contract cannot be realized, the other party has the right to terminate this contract by written notice.

3. If Party A makes any adjustment to the standard of the annual license fee, Party B shall be notified before the next annual payment period, and if Party B does not agree with the standard adjustment, Party A shall have the right to terminate this contract.

4. If Party B fails to pay the royalties after being reminded by Party A, Party A has the right to terminate this contract.

Article 6: Entry into force and others

1. This contract shall enter into force on the date of sealing by Party A and Party B.

2.

2. This contract is in duplicate, one for each party.

3. This contract shall not be transferred to a third party in whole or in part without the written consent of both parties.

4. Any dispute arising from the fulfillment and interpretation of this contract shall be resolved by both parties through friendly negotiation; if the negotiation fails, the dispute shall be brought to the People's Court of competent jurisdiction in the place where Party A is located.

Party A (official seal): _________ Party B (official seal): _________

Legal Representative (Signature): _________ Legal Representative (Signature): _________

_________ ____ ____ _________ ____ _________ Day

Electronic Contract Part 3

Seller (Party A): _________

Buyer (Party B): _________

Party A and Party B in good faith, the principle of equality and mutual benefit, and signed the following fair negotiation of the contract of sale and purchase, in order to comply with.

Article I Subject Matter

I. Product Name: _________ Trademark: _________ Specification/Model: _________ Place of Origin: _________ Manufacturer: _________

II. Transaction Quantity: _________

III. Unit Price: _________ Total price: _________

IV. Quality

(a) The standard that the overall quality and performance should reach shall be adopted as the following No. _________:

1. In accordance with the national mandatory standards or guidance standards: _________ Execution

2. In accordance with the international general standards: _________ Execution

3. In accordance with the industry standard: _________ Execution

4. Execution according to the standard of the sealed samples

5. Negotiation and agreement on the quality to the following level: _________

(b) The quality and performance standards or parameters of the following components are

Component a: _________ Quality standard or parameter: _________

Component b: _________ Quality standard or parameter: _________

(v) The performance of the overall operation of the product shall be up to the following level:

Component a: _________ Level of operation: _________

Part b: _________ Operating level: _________

VI. The overall technical performance of the product shall be standardized as follows:

The following parts use the following technologies:

Part a: _________ Using technology: _________

Part b: _________ Using technology: _________

VII. Product Functions

VIII. Safety Performance

Impact on the environment: _________

'Impact' on the operator: _________

Data security: _________

Security mark: _________

p> Party A provides Party B with detailed technical information, and the technology used in the product and its components should be consistent with that shown on the information.

IX. Packaging

Moisture resistance: _________

Sun protection: _________

Antivibration: _________

Dust resistance: _________

Outer packaging marking to be required: _________

Aesthetic requirements: _________

Article 2 Transportation

Transportation handler: _________

Transportation cost bearer: _________

Transportation mode: _________

Place of departure: _________

Place of receipt: _________

Carrier: _________

Article 3 Delivery

Delivery shall be completed by both parties in accordance with the following _________ ways

(a) Party A delivers the goods to the first carrier and obtains the document for the withdrawal of the goods, and delivery is completed by Party A delivering the document for the withdrawal of the goods to Party B.

(ii) Delivery is complete when Party B receives the goods and accepts them.

(c) Party B picks up the goods, picking up the goods and loading (ship) is completed, the delivery is complete.

(d) In addition to the above ways other ways, the agreement is: _________.

Party A when the delivery is completed before _________ _________.

Article IV Transfer of Risk

The risk of damage and loss of the goods is borne by Party A before delivery, and by Party B after delivery. The burden of the risk does not affect the claim of liability for breach of contract and product infringement.

Article 5 Transfer of Ownership

The transfer of ownership is in accordance with the following _________

(a) ownership of the goods is transferred to Party B after delivery

(b) Party A retains the ownership of the goods equal to the value of the unsettled payment of the purchase price before the payment of the goods is completely settled, and the specific implementation of the method to be negotiated

Article 6 Inspection

The inspection shall be completed within _________ days from the delivery of the goods, and if there is any objection to the quality, Party B shall put forward the objection in writing to Party A within _________ days, and keep the quality defective goods in a safe place, and wait for the negotiation to deal with it.

Inspector: _________

Technical means of inspection: _________

Inspection method: _________

Inspection standard: _________

Qualified standard of inspection: _________

E-contract Part 4

Party A (customized):

Party B (contractor):

2, Party A puts forward the specific requirements of the LED display project, Party B according to this contract is responsible for display design, production, installation, commissioning, training, maintenance and other work. Party A is responsible for the total cost of investment projects.

Second, the type of project, cost composition

The total cost of the display project is: ______ yuan. Capitalization: _______ RMB is composed as follows:

If Party A changes the contracting requirements in the middle of the project, causing Party B to increase the cost or suffer losses, Party A will increase the total cost of the project accordingly or compensate Party B for the losses suffered as a result.

Third, the software requirements

1, Party B to provide Party A with a set of specially designed display screen standard user software, can realize the display system itself graphic editing, screen display control and other functions (excluding links to external data). Standard user software provided by Party B, Party B is responsible for the installation and commissioning.

Fourth, transportation, installation, commissioning and training

1, Party B is responsible for (Party A to assist) the display of the transportation, installation, commissioning and Party A operator training.

2, the installation of the display, location and frame type and color, confirmed by Party A implementation.

3. Specific work undertaken by Party B.

(1) Transportation of the display from Party B's location to Party A's location.

(2) On-site installation and commissioning of the display.

(3) Training of Party A's operators.

4. Specific work undertaken by Party A.

(1) Provide timely installation of the specific requirements of the display, the construction conditions of the installation site description and communication distance.

(2) is responsible for the construction of electricity and display and control equipment with the configuration of the AC power supply. When Party B enters the site construction, it is responsible for providing power.

(3) is responsible for the construction site of the relevant license, liaison with the relevant departments, security, fire and all coordination and related costs.

(4) in the display installation, commissioning began, that is, sent familiar with the computer application of the operator to grasp the overall situation of the display and receive on-site training.

(5) Party A should provide the necessary infrastructure for the construction of the display system, Party B to Party A to propose the standard of basic engineering construction.

Fifth, engineering maintenance

1, Party B is responsible for the display for one year of free maintenance (since the display installation and acceptance after counting), after the warranty period, Party B only charge the cost of maintenance fee;

2, if the display itself has problems, Party B rushed to the location of the Party A in a timely manner to solve the problem after receiving Party B's notice. Solution. Before Party A should explain to Party B in writing (fax) the basic situation of the problem. So that Party B to prepare.

3, the use of the display due to improper use of Party A caused by the problems and accidents caused by the loss, Party B can help Party A to solve, but the related costs are Party A is responsible for.

4, the following cases caused by the display can not run normally, Party A is responsible for:

(1) the display control computer for other purposes, due to software viruses and other reasons, the destruction of the display control software.

(2) display and Party computer network connection, because the computer network problems caused by the display and computer and software damage.

(3) Due to power grid surge fluctuations or strong interference sources on the scene caused by the damage to the display.

(4) and other human factors

Six, the progress of the project and acceptance

1, the display project period totaling 1 working day, from the date of receipt of Party B prepayment to the Party B installation and commissioning is complete.

2, the display site installation, commissioning is completed within three days, Party A should be the entire display project acceptance.

VII, the project cost settlement

1, A, B and the two sides signed and stamped within three days from the date of Party B, Party A prepaid Party B project payment of ¥ ____, capitals: _____, the contract came into effect.

2, installation and commissioning is completed, Party A to pay Party B ¥ ______ written: ___________.

3, Party A has not paid the full cost of the project before, the display of property rights to Party B all. After the payment, the property right belongs to Party A.

4, the project must be remitted to the account specified by Party B. If remitted to another account, Party B will not be able to pay the full cost of the project. If remitted to other accounts, Party B will not be recognized, the consequences of which Party A shall bear.

VIII. Dispute Resolution

All disputes occurring in the course of the performance of this contract and its subsidiary contracts, the two sides should be based on the spirit of mutual understanding and mutual accommodation of the spirit of negotiation to resolve. If the two sides can not solve the problem through consultation, they can apply for arbitration to the arbitration committee recognized by both parties.

Nine, bylaws

1, the contract was signed and sealed by the two sides was established, Party A prepaid the project arrives at Party B designated account to take effect.

2, either party's agent, address, telephone, account bank and account number and other information changes, should notify the other party in writing.

3, the contract has not been completed, the two sides separately negotiated a supplementary agreement.

Party A (seal):

Legal:

Address:

Phone:

Party B (seal):

Legal:

Address:

Phone:

E-contract Part 5

The seller (Party A): ID card number:

The buyer (Party B): Identity card number:

A and B on the sale of housing matters in equal and voluntary, under the premise of consensus to enter into the terms of the contract as follows, in order to *** with compliance.

A, Party A voluntarily located in the house (building area of _________ square meters, basement floor area of square meters to RMB yuan (capitals: RMB ) price to sell to Party B.

Second, Party B pays Party A a deposit of 10,000 yuan for the contract guarantee. If Party A terminates this contract, double the deposit; if Party B terminates this contract, Party A will not return the deposit.

Third, Party A in ________ year ____ month ____ day before a one-time payment to Party B housing yuan.

Fourth, when this contract is signed, Party A and Party B do not have the conditions for transfer. Party A to provide the construction of housing as the basis for the transaction of relevant information. When the conditions are ripe for transfer, Party A shall assist Party B to apply for property rights.

Fifth, after the signing of this contract, Party A on the ownership of the house (use, income, rental, security, mortgage, sale, possession, etc.) transferred to Party B. The contract will be signed by Party B, and Party A shall not be liable for any loss or damage. Party A promises and guarantees that Party B enjoys the full right to live in the house as well as the right to dispose of it, and Party A shall not enter into any agreement, contract or any other way of disposal of the house with others.

VI. Liability for breach of contract

1. Party A shall deliver the house on the date specified in the same month, and shall pay to Party B one thousandth of the total amount of the house price for each overdue ____ day. Party B has the right to terminate this contract if the delay exceeds three months. After the termination of the contract, Party A will not only return all the collected house price to Party B, but also compensate Party B for the economic loss of yuan.

2. If the quality of the house sold by Party A affects the exercise of Party B's right to live, all the responsibility shall be borne by Party A, and shall compensate for Party B's losses.

3. After the signing of this contract, no party shall change or cancel the contract without authorization. If the termination of this contract is caused by significant objective reasons, Party A shall return the price of Party B's house in accordance with the market appraisal price, and compensate Party B for the cost of house decoration.

4. If the quality and function of the house is caused by the planning department or the design department, Party A shall notify Party B. If the compensation is issued, Party A shall refund Party B the full amount.

VII, this contract in the fulfillment of the dispute occurred in the process of negotiation between the parties to resolve; consultation fails to the people's court of the residence of the buyer according to law.

VIII, special agreement After the entry into force of this contract, Party A shall not in any way claim that the contract is invalid, such as this contract is recognized by the competent authorities as invalid contract, Party A shall return all the money paid by Party B, and compensation for the loss of Party B 10 million yuan.

IX. This contract shall enter into force on the date of signature or seal of both parties. The two sides can sign a supplemental agreement on matters not covered in this contract, the supplemental agreement and this contract has the same legal effect.

X. This contract is in duplicate, the A and B each take one.

Party A:

Party B:

________ year ____ month ____ day ________ year ____ month ____ day

Electronic Contract Part 6

Contract No.:

LED electronic screen contract

Contractor: (referred to as Party A)

Contractor: XXXXXXXXXXXXXXXXXXXXXX Limited (referred to as Party B)

Signing time: xxx xx month xx day

According to China's "Contract Law" relevant provisions, in order to clarify the rights, obligations and responsibilities of the two sides, the two sides negotiated the signing of this contract.

First, the project

1. Project name: indoor LED screen installation

2. Scope and content of the contract: the unit board on-site splicing, the whole screen installation and debugging (controller to the screen between the power supply and signal transmission line laying and on-site installation of the environment by the contractor to provide).

3. Project cost (capitals): xxxxxxxxxx (xxxxxxxx round)

Second, the rights, obligations and responsibilities

(a) the contracting party

1. Party A must cooperate with Party B will be the power supply before the installation of the equipment and the signal line wiring in place.

2. Party A is responsible for connecting the construction site required for construction and debugging power supply, and installation of platforms and other conditions to meet the relevant construction needs.

3. The project costs outside the scope of this contract shall be borne by Party A.

4.

4. If Party A finds that the equipment installed by Party B is not in line with the contract (specifications, models), the right to request Party B to be replaced.

5. Party A is responsible for the daily maintenance of the equipment (such as replacement of consumables, cleaning equipment, hardware and software settings, and other non-professional technical personnel to complete the work)

6. Party A should create conditions for the construction of Party B. Where the project is delayed due to reasons attributable to Party A, you should be compensated for the economic losses caused by Party B.

(2) The project should be carried out in accordance with the requirements of the contract, and should be carried out in accordance with the requirements of the contract.

(B) Contractor

1. Within one day after the signing of this contract, Party B will order hardware equipment according to the equipment list, and notify the other party one day in advance of the progress of the project to cooperate with the arrival of personnel.

2. Party B shall not install equipment that is inconsistent with this contract, or shall be responsible for replacement.

3. Party B on the installation of the screen body to implement a one-year warranty, because in the suburbs, so each door to collect 50 yuan car fee.

(installed on April 8, 20xx warranty period to April 8, 20xx).

4. Party B shall be responsible for the obvious hardware failure and immediately solve the problem on the doorstep; for non-obvious hardware failures, by Party B in conjunction with the supplier of hard and software **** with the solution.

5. Party B to Party A in the use of a variety of technical issues raised in the consultation, should be rapid and timely answer.

Third, the project acceptance

A, B recognized by the third party and the two sides *** with the acceptance of the contract and the list of equipment based on the validity of the annexes to the acceptance.

Fourth, the price of the project payment and settlement

1. Party B installation and commissioning within seven days, Party A to pay all the project to Party B.

V. Construction and equipment changes

Party A needs equipment or change the construction plan, if the equipment and materials have been purchased or the line has been laid out, it must be

Party B agreed; if the foregoing has not yet occurred or part of the occurrence of the two sides to deal with separate negotiations, and Party A to compensate for the Party B for the actual loss (including) Return costs, travel expenses, labor wages, etc.)

Sixth, the responsibility for breach of contract

1. Party B violates the provisions of Article 2 (2) of the second, third, fourth treaty, Party B is responsible for the repair or reworking of the gratuitous and reimbursement of Party A for liquidated damages (calculated at 1% of the amount of the project).

2. If Party A violates Article 2(1) of this contract, Party B shall be responsible for repairing or reworking the project without compensation, and shall pay Party B liquidated damages (calculated at 1% of the project cost), except that the completion date shall be postponed.

VII, based on its agreement

1. Party A later new equipment and its engineering construction, by the two sides to negotiate.

2. This contract in duplicate, each party holds a copy of the two sides, the two sides signed on behalf of the entry into force.

VIII, the contract in the fulfillment of the dispute between the parties to the consultation process; consultation fails, according to the law to the people's court litigation.

IX. Annex

1. Equipment list

LED electronic screen list

Serial number product name unit quantity unit price sub-total

1F3.75 single red (5.56m*0.0.394m) square meters 2.191500 ¥ 3285.00

2Control card 1280 ¥ 280.00

3Installation and commissioning fees times 1200 ¥ 200.00

4Taxes times 1135 ¥ 135.00

5Total (yuan) 3900.00

Party A: B: xxxxxxxxxxxxxxxxxxxx Ltd

<