Bid for Construction Decoration Project
Bid
×××× Construction Project Bid by xxxxxx Company
To: xxxxxx Company (Owner)
1. After carefully reading the overview of xxxxxx project and the drawings designed by xxxxxx firm is now submitting a copy of the bidding document for the project. We are willing to undertake the contracted construction of the project in full accordance with the provisions of the document and comply with all the terms and conditions stipulated therein.
2. We agree to abide by this tender and all the tender documents during the period of validity of the tender as specified in the project profile document. We will be bound by this Bid to us at all times during such period of validity and are ready and willing to be accepted by the Owner.
4. If the Owner accepts our Bid and enters into its contract with us, this Bid, together with the Owner's acceptance of all the Bid Documents, will be one of the contents of the Contract Documents of the two of us, and all the undertakings in our Bid Documents will be honored during the construction of the Works up to the Warranty Period. We treasure this opportunity very much. In order to achieve a complete success in cooperation with you, we carefully read the project content and a full set of drawings provided by you, according to the principles of the project decoration design, and actively organize the designers for proofreading and errata, and carefully organized the engineering cost engineer and construction personnel to measure the amount of work, the preparation of the tender composed of the project budget and the design of the construction organization of the decorative aspects of the special documents.
In order to enable your company to fully understand the company's profile, as well as the construction of the project, management and service measures taken, now provides the following content for your choice.
Company Profile
××××Company has senior professionals nearly × ×× people, ××××Company is engineering construction as the main industry of national engineering construction general contracting one-level qualification level enterprises, the company has accumulated more than twenty years of general contracting construction qualifications, architectural design, construction, architectural design, architectural design, architectural design, decoration construction, production of accessories, materials and equipment supply as a whole, company, the company has passed the GB/T19001 certification in 1998. The company passed GB/T19002 quality system certification in 1998. The company has always been in line with the first-class technology, first-class management, for the owners of the construction of first-class projects, provide first-class service as the goal, over the past three years, the company's annual engineering excellence rate are more than × × %, in the construction of projects, there are a number of projects have won the city of Magnolia Prize, the city of Magnolia Gold Medal, the national quality engineering and the national Luban Prize projects.
Project Overview
××× is located at ×× Road ××. The total decorative engineering area is about ×× square meters.
Contracting Scope
According to the "Overview of xxx Decoration Project" provided by your company, the scope of the project includes:
The above project refers to the installation of water, electricity, HVAC and the construction of decoration.
Contracting Methods
The xxx decoration project will adopt the comprehensive contracting methods of cost (except for A-supplied materials, equipment and facilities), quality, duration, safety and civilization management.
Bidding measures and favorable conditions
Leaders at all levels of our company attach great importance to the construction of this project, and give strong support in all aspects. Once the project is constructed by our company, we will take this project as the key project of this year. Formation of on-site construction project manager department, by the national secondary qualification level project manager comrade × × as the construction site project manager. Over the years, comrade × × has organized the construction of a number of projects of the same type, in the management of the project on the construction progress, quality, safety, civilization, construction management is seriously responsible, meticulous, and strive for excellence, many times by the construction unit, supervision units, experts, peers of appreciation and praise. Project manager set up under the professional management departments, responsible for the construction and management of the professional construction team, the project department to ensure that the construction management work in a normal and orderly manner, step by step in place. (The list of project manager and main construction management personnel, brief description and copies of relevant certificates are attached to the tender. The quality grade of the project must be "excellent".
Therefore, the project schedule, quality are very high requirements, the cost of the cost of another package, the work is a great responsibility. The construction of this project will give full play to the advantages of our company, to ensure that the construction task is completed on time according to the bidding period, according to the contract quality level is completed, and to control the cost of the price in a package fixed price.
My company has a wealth of experience in the construction of the same type of project contracting, can be drawn on for this project. Our company and the current staff had successively constructed similar projects:
××××××
We will integrate the excellent construction program, successful construction management experience and good cooperation with the design of these projects into the construction management of this project.
The quotation of the project is based on the scope and content of the project set by the bidding and design, with reference to the relevant quotas, and the free grouping of prices and independent quotations will be preferential to your side.
The scope of the offer is the scope of the decoration works provided by you, calculate the workload, refer to the relevant quotas, free price grouping, independent quotation. Quotation preparation based on reference to the current "1993 Shanghai construction project budget quota", "Shanghai construction project comprehensive budget quota unit valuation table" (1997), "1993 Shanghai construction and decoration project budget quota single", installation works with reference to the "national unified installation project budget quota Shanghai unit valuation summary table" (1993), the materials in the standard price to the Shanghai Quota General Station x
The offer, our company attaches great importance to your interests, in order to reflect the bidding competition, first, our company based on your design drawings, calculating the amount of work, the preparation of construction budgets, combined with the market conditions of their own quotes, in the offer of a package fixed. Secondly, in order to reflect the comprehensive strength and management level of our company, we would like to make the maximum concessions on the project offer, the specific amount of which is detailed in the offer section of the "offer preparation instructions", "bidding offer summary table", "offer budget
Based on the "Bid Summary Table", "Bid Budget", "Other Charge Schedule", and "Other Charge Schedule" in the quotation section.
According to the requirements and provisions of the schedule provided by you, our company promises that: the schedule meets the requirements of the owner, and the project will be commenced on ××× month ×× day, and all the contents of the project within the scope of the bidding will be completed and handed over to you for use on ×× month ×× day. Construction x x x calendar days.
The competitive advantage of our company is that, under the premise of guaranteeing the quality of the project, in order to achieve the target of the construction period, when the project is being constructed, we will choose the best program for the construction period. In the management personnel, construction machinery and equipment, materials, labor input are out of the ordinary to ensure that the construction of high-speed, high efficiency and high quality, to meet the needs of this particular construction conditions, the schedule is detailed in the "construction schedule".
Above the bidding period, our company promises: once won the bid that is the contract period. If the completion of the project is ahead of schedule, there is no need for reward. If the delay is caused by our company, we are willing to pay a fine of RMB xxx yuan for each calendar day of delay.
We cannot start the work on time due to your reasons or the contractual schedule, or cause stoppage of work in the construction process, under the premise that you agree to the extension of the work period, we still have the responsibility and obligation and try our best to ensure that the project will be completed on time (ahead of schedule).
Our company promises to ensure that the project is "excellent" and meets the requirements of your quality objectives.
In view of the architectural characteristics of the project, one is the design principle of the design unit, the second is the construction of the decoration to achieve "flat surface, fine seam, straight line, interface Qi, good match" quality requirements, "rough work to do".
In accordance with the above two principles, our company integrates the existing management strength, carefully prepare the construction organization design, optimize the construction program, prepare the quality assurance plan, formulate the quality assurance measures for each decoration project, ensure the technical feasibility of the construction method, coordination and economic rationality, to ensure that the quality of the project to meet the bidding commitment and the requirements of the contract.
In the process of engineering design and construction, we will implement GB/T1900-9001, GB/T1900-ISO9002 quality management and quality assurance model standards, strictly implement the design specifications of the Ministry of Construction and Shanghai Municipality for decoration projects, construction acceptance specifications, quality inspection and evaluation standards, and the company's quality system program documents, quality assurance plans, operating instructions and your relevant regulations. Guidebook and your relevant provisions, to comply with your representatives, site supervision, the general contractor's command and management, the project to ensure that "excellent", "quality engineering" as its own responsibility, to "high-quality consciousness "to promote the management of the work. If due to the quality of the works constructed by our company can not meet the requirements of the bidding commitment, our company is willing to be penalized × × yuan.
Decoration materials selected to meet the owner's requirements. In order to ensure the quality of the project, the project materials by the owner, decoration units, supervision units and design units **** with the assessment group composed of merit recommended suppliers for the owner to finalize. All materials, equipment and facilities purchased by the decoration unit must be submitted to the owner for review and approval. The purchased materials, equipment and facilities must be provided with samples (samples) and related information in advance, and confirmed by the owner and the supervisor to allow before the construction of the project. Our company will follow the above principles to ensure that all decorative materials used in the project comply with the relevant regulations and requirements.
Civilized construction management, with the owner to achieve Shanghai civilized site. If we fail to meet the requirements of the commitment, we are willing to accept economic penalties according to the owner's requirements.
Creating a civilized site, the implementation of civilized construction and civilized operation is to ensure safe production and establish a good corporate image of the basic work. Over the years, our company has long attached importance to the creation of civilized construction site, and has repeatedly won the praise of the construction unit, the higher government authorities.
For the specific geographic environment of the construction of this project in your site, according to the requirements of the relevant departments of Shanghai and the municipal supervision, to achieve safety, civilized construction, to ensure that the construction area of the internal and external cleanliness and safety, in line with the implementation of the management requirements of ISO9004 our side. During the construction, our company will strictly implement the relevant regulations on civilized construction of construction sites in Shanghai, the ISO9004 standard and the relevant provisions of the terms and conditions of your construction safety, health and civilized construction requirements. Employee accommodation will be centrally arranged in the area designated by you, and a temporary living area will be erected. In addition to complying with the regulations set by you, in addition, our company will still carefully formulate a series of management measures related to urban management, traffic, environmental protection, cityscape, safety, civilization, ensuring employee health and comprehensive governance. And the construction noise, air pollution, water pollution of the indoor construction of the project will be reduced to the minimum, do a good job of civilized construction of the work, and improve the site area of environmental protection, environmental health, maintenance and protection of the health of employees; correctly deal with your side, the city supervision, engineering quality supervision, safety supervision, comprehensive governance and the city, the new area of the relevant departments of the relationship between you, and seriously comply with and implement the national or local issuance of the The above management regulations for construction projects, ISO9004 standards and related systems are carefully observed and implemented to ensure that the site meets the standard of "civilized site" in Shanghai.
To undertake the management responsibility of decoration construction contracting and to provide first-class management and service.
This project, such as our company won the bid, first, will be the construction and deepen the design of their own contracting mode, contracting the contents of your × × × project, subject to the management of the Party, the supervisory unit, signed a contract for the decoration of the project, to complete the × × × project's construction tasks. Secondly, we are fully responsible for all the contents of the project shown in the construction drawings of the interior decoration, and bear the responsibility of controlling, coordinating and cooperating with the project schedule, quality management, safety and project investment. Thirdly, it is fully responsible for all the work stipulated in the contract and fulfill all the obligations of the construction contract. Our company will also actively cooperate with other specialized projects which do not belong to the scope of construction sub-contracting.
In the provision of services, if you accept our company's offer, construction organization design and other contents of the composition of the bidding documents, and sign a contract with our company for the construction of the project contract, this bidding documents together with your bidding documents put forward by the request will be as the content of the contract documents of the two sides of our company to ensure that in the construction of the project in the construction of all the promises made in our bidding documents.
In the provision of management, will be in accordance with your requirements, quickly sent to the scene, with you and the general contractor to do a good job in the pre-construction of the project handover and pre-construction of the preparatory work, responsible for decorative construction contracting responsibilities. Our company carefully promises: if we win the bid, we will never subcontract this project to other units (except the professional subcontracting units designated by you), otherwise you have the right to terminate the contract, and all the losses caused will be borne by our company. During the construction process, the project design team will be stationed at the site, using all the most advanced means to design the deepening drawings and optimize the scheme, so as not to cause a disconnection between the design and the actual construction, and not to add trouble to you. After the completion of this project, the site will be retained to the deputy project manager headed by the return visit warranty team, to provide timely service and maintenance, to ensure that it does not affect the successful completion of your xxx project construction and the smooth commissioning of the project.
In the provision of management, as the project department responsible for the construction of this project has built a number of projects of the same type, there is a mature, rich construction experience. The project department has a good working and interpersonal relationship with the relevant departments of Pudong New Area, and cooperates with your company to ensure the coordination and handling of the relationship between all parties.
In the process of construction of the project, actively for your sake, saving costs, reduce costs, for any rationalization of the project quality, progress, and is conducive to reducing the cost of the project, to do at any time to your proposal. If your party in the project payment shortages, our company will also try to help, to ensure that the project can be carried out normally, to ensure that the project is completed on schedule, to achieve the ultimate goal of a short period of time, excellent quality and low cost.
I hope to sincerely cooperate with you, **** for development.
Our company attaches importance to the commitment to your side, once won the bid, will conscientiously fulfill the above promise, careful design, careful construction, careful management, to provide quality services. We are fully aware of the significance and the responsibility that your party has emphasized for undertaking this project. We sincerely hope that we can win your trust through this construction bidding competition. We are determined to make this project become a high-quality goods of building decoration construction, and contribute our strength to the successful completion of your xxx project.
If you have other requirements for our company, our company is willing to make further negotiations.
We look forward to our successful cooperation!
Good luck with your business! We are willing to undertake the contracted construction of the project in full accordance with the provisions of the document and comply with all the terms and conditions stipulated therein.
2. We agree to abide by this tender and all the tender documents during the validity period of the tender as specified in the project profile document. We will be bound by this Bid to us at all times during such period of validity and are ready and willing to be accepted by the Owner.
4. If the Owner accepts our Bid and enters into its contract with us, this Bid, together with the Owner's acceptance of all the Bid Documents, will be one of the contents of the Contract Documents of the two of us, and all the undertakings in our Bid Documents will be honored during the construction of the Works up to the Warranty Period. We treasure this opportunity very much. In order to achieve a complete success in cooperation with you, we carefully read the project content and a full set of drawings provided by you, according to the principles of the project decoration design, and actively organize the designers for proofreading and errata, and carefully organized the engineering cost engineer and construction personnel to measure the amount of work, the preparation of the tender composed of the project budget and the design of the construction organization of the decorative aspects of the special documents.
In order to enable your company to fully understand the company's profile, as well as the construction of the project, management and service measures taken, now provides the following content for your choice.
Company Profile
××××Company has senior professionals nearly × ×× people, ××××Company is engineering construction as the main industry of national engineering construction general contracting one-level qualification level enterprises, the company has accumulated more than twenty years of general contracting construction qualifications, architectural design, construction, architectural design, architectural design, architectural design, decoration construction, production of accessories, materials and equipment supply as a whole, company, the company has passed the GB/T19001 certification in 1998. The company passed GB/T19002 quality system certification in 1998. The company has always been in line with the first-class technology, first-class management, for the owners of the construction of first-class projects, provide first-class service as the goal, over the past three years, the company's annual engineering excellence rate are more than × × %, in the construction of projects, there are a number of projects have won the city of Magnolia Prize, the city of Magnolia Gold Medal, the national quality engineering and the national Luban Prize projects.
Project Overview
××× is located at ×× Road ××. The total decorative engineering area is about ×× square meters.
Contracting Scope
According to the "Overview of xxx Decoration Project" provided by your company, the scope of the project includes:
The above project refers to the installation of water, electricity, HVAC and the construction of decoration.
Contracting Methods
The xxx decoration project will adopt the comprehensive contracting methods of cost (except for A-supplied materials, equipment and facilities), quality, duration, safety and civilization management.
Bidding measures and favorable conditions
Leaders at all levels of our company attach great importance to the construction of this project, and give strong support in all aspects. Once the project is constructed by our company, we will take this project as the key project of this year. Formation of on-site construction project manager department, by the national secondary qualification level project manager comrade × × as the construction site project manager. Over the years, comrade × × has organized the construction of a number of projects of the same type, in the management of the project on the construction progress, quality, safety, civilization, construction management is seriously responsible, meticulous, and strive for excellence, and many times by the construction unit, supervisory units, experts, peers of the appreciation and praise. Project manager set up under the professional management departments, responsible for the construction and management of the professional construction team, the project department to ensure that the construction management work in a normal and orderly manner, step by step in place. (The list of project manager and main construction management personnel, brief description and copies of relevant certificates are attached to the tender. The quality grade of the project must be "excellent".
Therefore, the project schedule, quality are very high requirements, the cost of the cost of another package, the work is a great responsibility. The construction of this project will give full play to the advantages of our company, to ensure that the construction task is completed on time according to the bidding period, according to the contract quality level is completed, and to control the cost of the price in a package fixed price.
My company has a wealth of experience in the construction of the same type of project contracting, can be drawn on for this project. Our company and the current staff have successively constructed similar projects:
××××××
We will integrate the excellent construction program, successful construction management experience and good cooperation with the design of these projects into the construction management of this project.
The quotation of the project is based on the scope and content of the project set by the bidding and design, with reference to the relevant quotas, and the free grouping of prices and independent quotations will be preferential to your side.
The scope of the offer is the scope of the decoration works provided by you, calculate the workload, refer to the relevant quotas, free price grouping, independent quotation. Quotation preparation based on reference to the current "1993 Shanghai construction project budget quota", "Shanghai construction project comprehensive budget quota unit valuation table" (1997), "1993 Shanghai construction and decoration project budget quota single", installation works with reference to the "national unified installation project budget quota Shanghai unit valuation summary table" (1993), the materials in the standard price to the Shanghai Quota General Station x
The offer, our company attaches great importance to your interests, in order to reflect the bidding competition, first, our company based on your design drawings, calculating the amount of work, the preparation of construction budgets, combined with the market conditions of their own quotes, in the offer of a package fixed. Secondly, in order to reflect the comprehensive strength and management level of our company, we would like to make the maximum concessions on the project offer, the specific amount of which is detailed in the offer part of the "offer preparation instructions", "bidding offer summary table", "offer budget
Based on the "Bid Summary", "Bid Estimate", "Bid Budget", and "Other Charge Schedule" in the quotation section.
According to the requirements and provisions of the schedule provided by you, our company promises that: the schedule meets the requirements of the owner, and the project will be commenced on ××× month ×× day, and all the contents of the project within the scope of the bidding will be completed and handed over to you for use on ×× month ×× day. Construction x x x calendar days.
The competitive advantage of our company is that, under the premise of guaranteeing the quality of the project, in order to achieve the target of the construction period, when the project is being constructed, we will choose the best program for the construction period. In the management personnel, construction machinery and equipment, materials, labor input are out of the ordinary to ensure that the construction of high-speed, high efficiency and high quality, to meet the needs of this particular construction conditions, the schedule is detailed in the "construction schedule".
Above the bidding period, our company promises: once won the bid that is the contract period. If the completion of the project is ahead of schedule, there is no need for reward. If the delay is caused by our company, we are willing to pay a fine of RMB xxx yuan for each calendar day of delay.
We cannot start the work on time due to your reasons or the contractual schedule, or cause stoppage of work during the construction process, under the premise that you agree to the extension of the work period, we still have the responsibility and obligation and try our best to ensure that the project will be completed on time (ahead of schedule).
Our company promises to ensure that the project is "excellent" and meets the requirements of your quality objectives.
In view of the architectural characteristics of the project, one is the design principle of the design unit, the second is the construction of the decoration to achieve "flat surface, fine seam, straight line, interface Qi, good match" quality requirements, "rough work to do".
In accordance with the above two principles, our company integrates the existing management strength, carefully prepare the construction organization design, optimize the construction program, prepare the quality assurance plan, formulate the quality assurance measures for each decoration project, ensure the technical feasibility of the construction method, coordination and economic rationality, to ensure that the quality of the project to meet the bidding commitment and the requirements of the contract.
In the process of engineering design and construction, we will implement GB/T1900-9001, GB/T1900-ISO9002 quality management and quality assurance model standards, strictly implement the design specifications of the Ministry of Construction and Shanghai Municipality for decoration projects, construction acceptance specifications, quality inspection and evaluation standards, and the company's quality system program documents, quality assurance plans, operating instructions and your relevant regulations. Guidebook and your relevant provisions, to comply with your representatives, site supervision, the general contractor's command and management, the project to ensure that "excellent", "quality engineering" as its own responsibility, to "quality consciousness "to promote the management of the work. If due to the quality of the works constructed by our company can not meet the requirements of the bidding commitment, our company is willing to be penalized × × yuan.
Decoration materials selected to meet the owner's requirements. In order to ensure the quality of the project, the project materials by the owner, decoration units, supervision units and design units **** with the assessment group composed of merit recommended suppliers for the owner to finalize. All materials, equipment and facilities purchased by the decoration unit must be submitted to the owner for review and approval. The purchased materials, equipment and facilities must be provided with samples (samples) and related information in advance, and confirmed by the owner and the supervisor to allow before the construction of the project. Our company will follow the above principles to ensure that all decorative materials used in the project comply with the relevant regulations and requirements.
Civilized construction management, with the owner to achieve Shanghai civilized site. If we fail to meet the requirements of the commitment, we are willing to accept economic penalties according to the owner's requirements.
Creating a civilized site, the implementation of civilized construction and civilized operation is to ensure safe production and establish a good image of the basic work of the enterprise. Over the years, our company has long attached importance to the creation of civilized construction site, and has repeatedly won the praise of the construction unit, the higher government authorities.
For the specific geographic environment of the construction of this project in your site, according to the requirements of the relevant departments of Shanghai and the municipal supervision, to achieve safety, civilized construction, to ensure that the construction area of the internal and external cleanliness and safety, in line with the implementation of the management requirements of ISO9004 our side. During the construction, our company will strictly implement the relevant regulations on civilized construction of construction sites in Shanghai, the ISO9004 standard and the relevant provisions of the terms and conditions of your construction safety, health and civilized construction requirements. Employee accommodation will be centrally arranged in the area designated by you, and a temporary living area will be erected. In addition to complying with the regulations set by you, in addition, our company will still carefully formulate a series of management measures related to urban management, traffic, environmental protection, cityscape, safety, civilization, ensuring employee health and comprehensive governance. And the construction noise, air pollution, water pollution of the indoor construction of the project will be reduced to the minimum, do a good job of civilized construction of the work, and improve the site area of environmental protection, environmental health, maintenance and protection of the health of employees; correctly deal with your side, the city supervision, engineering quality supervision, safety supervision, comprehensive governance and the city, the new area of the relevant departments of the relationship between you, and seriously comply with and implement the national or local issuance of the The above management regulations for construction projects, ISO9004 standards and related systems are carefully observed and implemented to ensure that the site meets the standard of "civilized site" in Shanghai.
To undertake the management responsibility of decoration construction contracting and to provide first-class management and service.
This project, such as our company won the bid, first, will be the construction and deepen the design of their own contracting mode, contracting the contents of your × × × project, subject to the management of the Party, the supervisory unit, signed a contract for the decoration of the project, to complete the construction of × × × project tasks. Secondly, we are fully responsible for all the contents of the project shown in the construction drawings of the interior decoration, and bear the responsibility of controlling, coordinating and cooperating with the project schedule, quality management, safety and project investment. Thirdly, it is fully responsible for all the work stipulated in the contract and fulfill all the obligations of the construction contract. Our company will also actively cooperate with other specialized projects which do not belong to the scope of construction sub-contracting.
In the provision of services, if you accept our company's offer, construction organization design and other contents of the composition of the bidding documents, and sign a contract with our company for the construction of the project contract, this bidding documents together with your bidding documents put forward by the request will be as the content of the contract documents of the two sides of our company to ensure that in the construction of the project in the construction of our company to honor all the promises made in the bidding documents.
In the provision of management, will be in accordance with your requirements, quickly sent to the scene, with you and the general contractor to do a good job in the pre-construction of the project handover and pre-construction of the preparatory work, responsible for decorative construction contracting responsibilities. Our company carefully promises: if we win the bid, we will never subcontract this project to other units (except the professional subcontracting units designated by you), otherwise you have the right to terminate the contract, and all the losses caused will be borne by our company. During the construction process, the project design team will be stationed at the site, using all the most advanced means to design the deepening drawings and optimize the scheme, so as not to cause a disconnection between the design and the actual construction, and not to add trouble to you. After the completion of this project, the site will be retained to the deputy project manager headed by the return visit warranty team, to provide timely service and maintenance, to ensure that it does not affect the successful completion of your xxx project construction and the smooth commissioning of the project.
In the provision of management, as the project department responsible for the construction of this project has built a number of projects of the same type, there are mature, rich construction experience. The project department has a good working and interpersonal relationship with the relevant departments of Pudong New Area, and cooperates with your company to ensure the coordination and handling of the relationship between all parties.
In the process of construction of the project, actively for your sake, saving costs, reduce costs, for any rationalization of the project quality, progress, and is conducive to reducing the cost of the project, to do at any time to your proposal. If your party in the project payment shortages, our company will also try to help, to ensure that the project can be carried out normally, to ensure that the project is completed on schedule, to achieve the ultimate goal of a short period of time, excellent quality and low cost.
I hope to sincerely cooperate with you, **** for development.
Our company attaches importance to the commitment to your side, once won the bid, will conscientiously fulfill the above promise, careful design, careful construction, careful management, to provide quality services. We are fully aware of the significance and the responsibility that your party has emphasized for undertaking this project. We sincerely hope that we can win your trust through this construction bidding competition. We are determined to make this project become a high-quality goods of building decoration construction, and contribute our strength to the successful completion of your xxx project.
If you have other requirements for our company, our company is willing to make further negotiations.
We look forward to our successful cooperation!
Good luck with your business!
××××Company
×××Year×××Month××Day