Town people's government, the street office is responsible for the prevention and control of dust pollution in the jurisdiction of the relevant work.
Residence (village) committees shall promptly report and assist the relevant administrative departments to deal with violations of dust pollution prevention and control in their respective areas in accordance with the law. Article 6 The administrative department in charge of ecology and environment implements unified supervision and management of dust pollution prevention and control.
Municipal management, gardening and environmental sanitation management, housing and urban-rural construction, transportation and port and shipping management, natural resources and planning and other relevant departments in the municipal and district people's governments within the scope of responsibilities determined by law, to do supervision and management of dust pollution prevention and control. Article 7 Any unit or individual on dust pollution prevention and control activities in violation of the law, the right to discourage, complain and report.
City and district people's governments shall establish a dust pollution prevention and control work reporting system, set up complaints, reporting platforms and exposure of illegal behavior platforms, to the community to publish a unified complaint and reporting telephone, mailboxes and so on. The relevant units shall accept, investigate complaints and reports according to law, make the appropriate treatment, and the results will be timely feedback. Article 8 Any unit or individual shall consciously fulfill the obligations of environmental protection, take effective measures to prevent and reduce dust pollution. Article IX encourages and supports the relevant enterprises and industry associations to develop and implement dust pollution prevention and control norms to strengthen self-regulation.
Encourage the promotion and use of advanced, practical dust pollution prevention and control of new technologies, new equipment. Chapter II control measures Article 10 The construction unit is responsible for the construction of dust pollution prevention and control management. Construction project dust pollution prevention and control costs should be included in the project cost, earmarked for special purposes.
Construction units submitted in accordance with the environmental impact assessment documents, should include dust pollution prevention and control measures. Article XI involved in the construction of construction units, transportation units shall establish dust pollution prevention and control responsibility system, to develop construction, transportation dust pollution prevention and control of specific implementation programs, the implementation of dust pollution prevention and control measures.
Construction project supervision unit in the project supervision, found that the construction unit, the transportation unit is not according to the dust pollution prevention and control program for construction, transportation, should be required to make immediate corrections, and promptly report to the construction unit and the relevant administrative departments. Article 12 Before the commencement of the construction project, the construction unit shall set up a hard closed enclosure at the construction site.
The entrances and exits of the construction site, construction vehicles to reach the road and construction workers daily walking road shall be hardened. Vehicle entrances and exits should be installed vehicle washing facilities and equipment, configuration of overflow prevention seat or waste water collection pits, sedimentation tanks, vehicle washing clean before driving out.
Aerial construction work should be set up three-dimensional dust net. Construction site erected outside scaffolding should be used outside the clean, unbroken mesh net for closure. Article XIII of the construction site shall use ready-mixed concrete, ready-mixed grading gravel and ready-mixed water stabilization mix, promote the use of ready-mixed mortar. Due to special circumstances require on-site mixing of concrete, shall take closed, spraying and other dust control measures.
Construction sites used in stone, wood products, precast concrete (mortar) and other components, should be used in manufactured products to implement assembly construction. Due to special circumstances require on-site cutting, should be taken closed, spraying and other dust control measures. Article XIV of the construction site should be reasonable control of earth excavation and storage time, and timely adoption of watering, earth surface compaction, closed dust net cover and other dust control measures.
Roadbed earth filling shall not be used without dust cover crushing equipment.
In special meteorological conditions, excavation, loading and unloading of earth is easy to produce dust and can not take effective dust control measures, should stop the earth excavation, loading and unloading operations. Article XV of concrete pavement cutting construction shall take spraying, sprinkling and other dust control measures.
Spraying asphalt penetrating oil, viscous oil and other construction should take shelter measures. Article XVI of the main bridge project construction in addition to comply with the provisions of Article XII to Article XIV of these measures, but also should be used in closed containers vertical transportation or pipeline transportation of construction debris on the bridge and other materials. Article 17 The demolition project construction in addition to comply with the provisions of Article 12 to Article 14 of these measures, shall also comply with the following dust pollution prevention and control requirements:
(1) the whole process of demolition while spraying, sprinkling, and other dust control measures, before the complete demolition of the use of airtight dust net enclosure of the building;
(2) the demolition of the demolition of demolition, before the demolition of the inside and outside the spray, sprinkling, and other ways to wet the building, and in the building of the demolition of the demolition of demolition, and in the building of the demolition of demolition, and in the building of the construction of the construction of the bridge. way to wet the building, and set up in the building of each floor water device, blasting immediately after the spraying, sprinkling and other dust control measures;
(c) demolition works are completed, the construction site to take closed dust net cover, ground hardening, greening and other dust control measures.