I. Basic Nursing
Problems:
1, the patient's fingernails are dirty and the beard is long.
2, infusion card inspection is not filled out in a standardized way, inspection is not timely, the actual number of drops of infusion is not the same as the infusion card filled out.
3. The actual oxygen flow rate is not consistent with the medical prescription.
4. Wrong filling of bedside card.
5. Unclean bed linen.
Defect analysis:
1, the nurse's work responsibility is not strong.
2, the implementation of basic nursing work is not in place.
3, not strictly according to the operation process work.
4, the head nurse supervision is not enough, the inspection is not careful.
Rectification measures:
1, strengthen the nurse's sense of responsibility, work seriously and carefully.
2, strengthen the basic nursing.
3, strengthen the safety awareness, strictly according to the nursing norms.
Second, the overall care
Problems:
1, the patient does not know the knowledge of medication .
2, the patient does not know the responsible nurse, nurse manager.
3, patient health education is not in place.
Defect analysis:
1, the nurse's work responsibility is not strong.
2, health education system is not in place.
3, the head nurse supervision is not enough.
Rectification measures:
1, strengthen the education of nurses' responsibility.
2, seriously implement the health education system.
3, the head nurse to increase supervision.
Third, disinfection isolation
Problems:
1, Gil iodine no open time, expired.
2, medical waste disposal is not standardized.
3, the configuration of the liquid no dosing time, dosing time is greater than 2 hours.
Defect analysis:
1, the nurse did not work seriously, did not work according to the operating procedures.
2, the nurses do not have a strong sense of hospital infection.
3, the head nurse supervision is not enough.
Rectification measures:
1, strengthen the education of nurses' sense of responsibility, and work in strict accordance with the operating standards.
2, strengthen the safety awareness, seriously study the knowledge of hospital infection, and implementation.
3, the head nurse to increase supervision.
Fourth, ward management
Problems:
1, more items under the bed bed, the function of the belt with debris, more items on the bedside table.
2, accompanied by more, sitting, sleeping on the bed.
3, high-risk drug registry records are not timely.
4, the use of electric rice cooker in the ward.
5, the use of non-hospital prepared bedding.
Deficiency analysis:
1, the nurse is not strong sense of responsibility, the implementation of the system is not in place.
2, nurses are busy with nursing work, ignoring ward management.
3, the head nurse supervision is not enough.
Rectification measures:
1, the head nurse to increase supervision.
2, strengthen the ward management, let the patient participate in ward management.
3, strengthen the education of nurse responsibility.
4, high-risk drugs according to the standard management.
Quality rectification program essay five
According to the county government, Jingzhou City Food and Drug Administration on the democratic evaluation of the work of the relevant requirements of the political wind, I carefully organized, extensive publicity, comprehensive mobilization, in a conscientious manner to do a good job in the first phase of the publicity and mobilization phase of the work on the basis of carrying out self-examination and self-correction, and widely solicited opinions and suggestions, against the content of the activities, and seriously investigated Problems. Now the main problems and corrective measures are reported as follows:
In order to find problems, improve the work, in order to fully solicit the views of all parties on the basis, we take the horizontal mutual inspection, vertical sampling and other effective forms, focusing on the fulfillment of their duties, quality of service, administration in accordance with the law and other three aspects of the county government in the county government requirements of the "five checks and five looks" on the basis of the Bureau of the "six checks and six looks" seriously. That is: a check on the implementation of the responsibility for honest and clean party building, to see if there is power for private gain, medicine for private gain, corruption and bribery and "eat, take, card, want" behavior; two check law enforcement, whether the behavior is standardized to see if there is a "do not give the benefits do not do, give the benefits to do things" phenomenon; three check whether the order is smooth, to see if there is a decree, there is a phenomenon of prohibited; four check the attitude of the service and the quality of service, to see if there is a "door", "hard to get in, hard to see, hard to say". Difficult to enter, hard to see the face, hard to hear, hard to do" and other phenomena; five check the efficiency of the office, to see if there is a "push, drag, pull" and the phenomenon of inefficiency; six check the system of service commitments, accountability system, the implementation of the system of limited time to see if there is no on-time closure, does not honor the commitment, not hospitality, and other phenomena.
I. Problems
On the basis of extensive consultation and self-correction, through the collection, summarization, sorting, **** sorted out the main existence of my bureau of the five aspects of the problem.
1, the quality of thought and business level needs to be improved. Some cadres and workers with outdated ideas, always unable to keep up with the new situation of food and drug supervision and management work, new requirements, in the face of the difficulties arising from the work feel difficult, there is a capacity to panic. Some of the existence of the party's policy is not a thorough understanding of the food and drug supervision and management laws and regulations are not familiar with the drill is not deep, the study of business knowledge is not precise enough, the business level needs to be improved.
2, service is not active enough. In the service work is often passive service-oriented, active service is not good, tracking service can not be completely in place.
3, medicine and equipment law enforcement is not strong enough. Mainly through the drug market remediation, the drug market order has not fundamentally improved, although the drug market supervision is a long period of time, however, the phenomenon of unregulated operation of the drug business enterprises still occur.
4, the organization's style is not solid enough. A small number of personnel there are procrastination, orders, not to comply with the work and rest time problems.
5, the food and drug supervision department function of the work of publicity is not enough, some people in the community do not know the specific responsibilities, and will be the price of drugs, health care issues transferred to the food and drug supervision department.
Second, the corrective measures
In response to the consultation and self-examination of the problem, we take "five" measures, namely, "the emergence of the problem, the leadership responsible for the rectification of the specific rectification of the task force, the rectification of the problem of the rectification measures, the rectification of the problem rectification of the time limit," and actively carry out rectification. Specific rectification is:
1, strengthen the cadres and workers learning and education, regular or irregular organization of party members and cadres to carry out political education, improve ideological awareness, improve and standardize the existing rules and regulations, the establishment and improvement of long-term mechanism for the construction of political style, re-revision of the "Integrity System", "learning plan for the organ", "Attendance System", "Vehicle Management", "civilized office system" and so on, truly To do with the system to manage people, with the system governing. Determined to put an end to the "door is difficult to enter, hard to see, hard to hear, hard to do" and "eat, take, card, want" and other bad behavior. This is responsible for comrade Zhou Yang, the Office of the specific implementation, has been completed in early November rectification.
2, to strengthen the bureau's system construction, improve efficiency, focusing on enterprises and units concerned about and reflecting the strong practical problems, standardize procedures, improve work style, to play an exemplary role in the good image of civilized institutions. This rectification requirements in early November to complete, by Comrade Zhou Yang is responsible for, the Office of the specific implementation. At present, has completed the production of the "bulletin board", a clear "application for drug retail enterprise procedures" and "drug supervision and administrative law enforcement procedures map".
3, carried out a legal system lectures, case file review activities, the drug inspectors for business skills training. To carry out a special inspection of law enforcement cases, the existence of problems to supervise the rectification. This rectification requirements in early November to complete, into by Comrade Feng Juncai is responsible for the implementation of the Office of the rule of law, has been carried out on October 21, law enforcement instruments check, *** check the case file 32, rectification of the case file 4; November 5, please Jingzhou City Food and Drug Administration Inspection Branch, deputy director of Comrade Xiao Xintian came to my bureau to carry out the legal system lectures.
4, strengthen contact with the press, television and other media, widely publicized food and drug regulatory departments responsibilities, timely reporting of new developments in food and drug supervision, new initiatives, new results; to strengthen the daily supervision of food and drug safety, in-depth special rectification of food and drug safety, and combat food and drug-related criminal activities. This is responsible for by Comrade Feng Juncai, Office of the Legislative Affairs Office of the specific implementation, required to be completed in early December, has been developed with the county TV station *** with the publicity plan, in the "Yusha Viewpoint" opened a column to publicize the function of food and drug supervision, work dynamics, special remediation, counterfeiting and shoddy exposure of typical cases.
5, to organize and carry out food and drug safety and identification of genuine and fake drugs (health care products) knowledge consulting services; in order to further strengthen the management of drugs and non-pharmaceutical labeling, on October 21 to 22, the county's drug retailers to carry out a special inspection of the drugs, health care products, sub-district (sub-cabinet) management and classification of the display of the special inspection; to carry out the "food and drug safety and identification of genuine and fake drugs exhibition" in the townships of Rongcheng, Zhuhe, Xinguang, and so on. Real and Fake Drugs Authentication Exhibition". This rectification requirements completed by the end of December, by Comrade He Zu Zu is responsible for, comprehensive section specific implementation.
6, according to the different positions of the drug and equipment practitioners, categorized and staged food service, drug laws and regulations and food and drug professional knowledge of the planned arrangements for training. This rectification requirements completed at the end of November, by Comrade He Zu Zu is responsible for the comprehensive section of the specific implementation, has now completed the drug business enterprises responsible for quality control gsp knowledge training, November 16, the organization of the county's pharmaceutical production enterprises responsible for quality control gmp knowledge training.
Through solid rectification, at present, the whole bureau has formed a "more than learning, dedication", "more than diligence, civilization", "more than integrity, speak positive" good atmosphere.
Quality rectification program model article six
The quality of the housing construction project is not only related to the practical effect of the project and the effect of the investment in the construction project, at the same time, it is related to the occupants of the life and property safety,
Quality work to improve the measures. With the continuous improvement of China's modernization level, the scale of the housing construction project is gradually increasing, once the quality problem will seriously affect the public interest and the interests of the construction unit, so that the quality management problem is the key issue that needs to be solved at present. In the actual management of the work has made certain achievements, but there are also problems that can not be ignored, the following paper analyzes these problems and puts forward effective improvement measures.
First, the quality of housing construction project management of common problems
At present, the quality of housing construction project has become a key issue of concern, comprehensively strengthen the management of the quality of the project is very necessary. In the actual management process, there are still some problems, specifically in the following aspects.
First of all, managers lack of quality management awareness. In the rapid development of the construction industry today, most of the construction companies pay more attention to their own economic benefits, while ignoring the social benefits, the maximization of economic benefits as the pursuit of the enterprise's goals, in this case, the managers of the enterprise will ignore the management of the quality of the project, but more like the economic interests of the same, which will make the quality of management work is caught in a vicious circle. In addition, due to the managers lack of perfect quality management consciousness and legal awareness, there is no scientific legal concept, so in the process of specific management is not in accordance with the corresponding operation specification, and did not strictly abide by the construction drawings, for the construction process of the phenomenon of jerry-built blind to the phenomenon, which are due to the lack of awareness of the managers and induced by the problem.
Secondly, the lack of perfect quality management system and good management environment. To better play the effect of quality management work, we need to work within the scope of the perfect system, and management measures to implement, but from the current situation, the lack of perfect quality management system, managers can not carry out integrated planning, management before the management is not able to formulate a perfect long-term management objectives. At the same time, due to the lack of technical level of managers, there is a clear lack of management operations, so that the implementation of the management system is not in place, coupled with the entire management system within the regulatory mechanism is not clear enough, resulting in the project management is not in place, which affects the quality of the entire project.
Finally, the lack of modern management personnel. With the deepening of reform and opening up, the number of housing construction projects has increased dramatically, construction companies in order to ensure the successful completion of the project, can only expand the proportion of migrant workers, but due to the low level of knowledge of migrant workers, it is difficult to ensure the quality of good projects, at the same time, due to the constant turnover of construction companies and technicians, the overall level has also declined, resulting in a lack of technical personnel, which will be Not conducive to the effective development of quality management. In addition, due to the enterprise in the talent incentives do not do a good job, so that a lot of experience and skill level of the quality of the high level of managers a lot of loss, so that the structure of the management personnel appeared unbalanced phenomenon, which is also the current housing construction project quality management problems.
Second, the improvement of the quality management of housing construction projects
The above three main aspects of the current quality management of housing construction projects analyzed the problem, the following paper on these issues to put forward a few specific ways to improve.
First of all, to enhance the importance of managers. In the process of quality management of housing construction projects, the need to pay attention to the human factor, that is, to pay attention to the managers in the entire management process of the dynamic role, so we need to change the current status quo, and strive to enhance the quality of managers for the management of the degree of importance. To this end, the need to strengthen publicity, so that it is clear that the quality of the entire project for the importance of the degree, and pointed out that poor quality will bring to the occupants and the construction unit of the adverse impact, through this means to make managers clear the importance of quality management. At the same time, it is also necessary to constantly improve the legal ability of managers and legal awareness, so that quality management can be carried out within the constraints of the law, better play the role of management.
Second, the establishment of a scientific and perfect quality management system. This is the center of the whole management measures. The formation of a good management order needs to have the constraints of the system, the effect of good management also needs to have the assistance of the system can be completed, therefore, to better play the effect of quality management work, effectively enhance the quality level of housing construction projects, the need to establish a scientific and perfect quality management system. Specifically, to improve the quality control network of the project, in the process of construction practice, need to be designated by the leadership of the construction company's objectives of the project, and to ensure that every link in the construction of the need for managers on-site management, so that the contractor's entire construction process is supervised. At the same time, the need to further clarify the responsibility management mechanism, the quality management tasks assigned to each manager, so that the construction process can be found in a timely manner a variety of quality problems, and take effective measures to improve. Scientific management system also needs to include dynamic management mechanism and information **** enjoyment mechanism. Dynamic management mechanism is to ensure that the quality management can penetrate into the construction site for real-time supervision, do not ignore any construction details, so as to better enhance the quality of the project. The information *** enjoyment mechanism is the use of information technology means, the quality management data timely announced to each person, so that they are clear about the quality of the project, in order to improve the construction process in the future. In order to enhance the enthusiasm of managers, it is also necessary to further improve the incentive mechanism, so that they can work in a good environment, and fully explore their management potential and talent, for the next quality management services.
Finally, not to ignore any details. Details determine success or failure, in the housing construction project, the details of the problem is not handled properly often potential quality hazards, serious will affect the quality of the entire project, so that as a quality manager, we must do a good job on the management of the details of the work, especially on the management of minor works and hidden works. In the management before the need to carefully study the construction program and construction specifications, clear the project for the quality of the requirements, and in the process of construction of each link in the quality control, to avoid quality hazards. In addition, the details also include the quality of various materials in the construction of housing construction, which is often also easy to ignore. Therefore, as a manager, you also need to manage the construction materials and construction equipment, to strictly control the procurement of materials and equipment to ensure their quality performance. For the materials, when it comes to the construction site also need to re-inspection of the quality, to prevent the quality of unqualified products into the construction process. As for the equipment, it is necessary to carry out regular maintenance to ensure that its performance is played.
Conclusion
Quality is the most critical issue in the housing construction project, the quality will directly affect the performance of the entire project and social performance, so with the continuous development of the field of housing construction project leaders pay more attention to the management of quality. But from the current situation, although the management of the work has made certain achievements, to a certain extent, to improve the quality of housing construction projects, but in the actual management process there are still some problems, this paper analyzes these common problems, and on the basis of the problem put forward a few points to improve the method, I hope to be able to provide a reference for the future of the quality of management of housing construction projects.
Guess you like:
1. rectification quality program model
2. rectification program model
3. personal rectification program model
4. about rectification program model
5. rectification program format model
6. engineering rectification program model