Work summary of water treatment
Summary of the first: water treatment work summary
Himself in the field of environmental protection has been working for 4, 5 years, a variety of sewage has seen a lot of a variety of processes have also been taught, and now instead of confused, how many processes are technological content? Especially in industrial wastewater. It may also be their own practice is still very shallow, or their eyesight is limited, the following are a few of their own questions, please answer the old-timers.
Question 1: I think that although the activated sludge method is traditional, but it is still very vital, now the process of a variety of processes, SBR, CASS, BAF, MBR, how many processes are in the treatment of the ability to have a significantly stronger than other processes?
Question 2: In the field of environmental protection engineering, a person's technical ability is mainly reflected in which aspect? When I went to school, I thought it was theory, then I thought it was design, then I thought it was debugging, and then I thought it was the ability to fool around that was the embodiment of technical ability.
Theory is not much to say, book knowledge only, there are explanations, there are explanations do not make sense, everyone is almost the same. The ability to design a little difference, the difference is mainly reflected in the degree of mastery of water quality and a comprehensive grasp of the process, the design ability of the high power ultimately reflects the ability to form a more perfect, rationalization. But what is the basis of the design, I think many people can not answer the fundamental question.
Debugging is even more confusing, there are many debugging experience, as well as the design of the program, in general, much the same, the technical content is said to the layman to listen to, can not be adjusted out of luck, and then how much of the industrial wastewater is to rely on the real skills of debugging qualified. In this regard, the case is estimated to be very little.
Finally, is the evaluation of a person's technical ability, but also to see his eloquence is good, eloquent, can make things clear, can put the work of rationalization is good. I feel like I know a lot, but I can't tell you how much I've learned about the technology.
Summary II: water treatment work summary sample
At the end of the year, the chemical water professional at all levels of leadership in the strong support of the guidance as well as strict training and teaching, in other departments of the active cooperation and strong support, to complete the company and the Ministry of Engineering under the various tasks and leadership of the various temporary tasks, to ensure that the construction of the power plant during the construction of the power plant. Also for the next year, I put the plant into operation to make certain guarantees and positive efforts.
Looking back at the achievements and shortcomings, but in order to better seek greater progress in their own professional aspects, access to leadership in many aspects of more guidance and correction, for this reason, the work of the past factual summary, analyze the shortcomings, and avoid the shortcomings. At the same time on the work of XX year to make an immature arrangement, please leadership to put forward guiding views, put forward the omission to facilitate in the new year in the professional and technical and comprehensive ability to improve the progress of the next level.
A successful completion of the bidding of chemical water equipment to ensure that the project progress to speed up the pace of demand.
(1) to strengthen the supervision of the design stage, for the future of the chemical water equipment to lay the foundation for safe, economic and stable operation. In doing other work at the same time seriously review the design basis is sufficient, whether the equipment selection is reasonable. We have gone through the actual research and investigation of our company's Anlu biomass power plant, and found that there are some problems in its design and installation, combined with the situation of Yicheng biomass power plant. According to the actual situation of our company, in order to better safety, economic and stable operation. The company reported to the Central South Design Institute after demonstration. Contact with the general contracting unit Huaxi Energy and equipment unit Beijing Panzhou. The chemical water treatment equipment output from 9t / h, changed to 15t / h. Desalination tank has a total tonnage of 200 cubic meters changed to a total tonnage of 400 cubic meters.
(2) close contact with the actual, and actively consult the experts of the equipment unit to create a better hardware for the equipment. Under the principle of following the equipment, the equipment does not understand the place to repeatedly consult and communicate. Holding the idea that only continuous learning can have continuous progress, not ashamed to actively explore. For example, he expressed his own views and ideas on the design concept of the one-piece evaporator. From years of operating experience and the design principles, in the system of dosing and other equipment design ideas in the manufacturers to communicate. Through the above work for the hardware of the equipment to meet the standards to create an environment and foundation.
(3) Strictly the signing of the technical agreement on equipment, and strive to optimize the technical indicators and performance indicators of the equipment. The signing of the technical agreement as the last gateway to the gatekeeper of the equipment, they have done serious work in advance, and the leadership of the Ministry of Engineering to communicate seriously. The bid on the more ambiguous and combined with the clarification of the requirements into the pre-drafted agreement. Put some of the essence of the convergence of our agreement to go. Perfect agreement for the structure of the equipment science, beautiful and technical supervision performance to provide a positive guarantee.
Second, seriously study and actively study, so that the theory and practice of double hard, in actively completing the work task at the same time, and constantly study the theoretical knowledge of the study, and strive to chemical water professional from the procurement of equipment to the installation of management of the scientific standardization and institutionalization, for the future safe operation of the unit to provide a good internal environment.
On this basis, we conscientiously carry out the guidelines and policies issued by the state and higher authorities on quality management and quality supervision of electric power construction projects, as well as the relevant regulations, norms, standards and management systems issued by the plant. Use of information network resources to strengthen professional and other related knowledge learning, seeking the best knowledge combination point of entry point, summarize a set of practical management concepts and management mechanisms in line with the scientific concept of development. Theory guides practice, and practice promotes the deepening of theory. Only on the basis of constantly learning from and summarizing the strengths of others, can there be a qualitative breakthrough in the development of technology. "Serious, careful, pragmatic, innovative". Basically, there is a clear outline and foundation for the water chemistry profession from the technical management. For the lower part of the chemical water specialty provides the goal of the smooth development.
Third, increase the equipment manufacturers and design institutes to exchange technical information on the progress and strength, and actively urge the design unit to optimize and improve the design and construction program, so as to speed up the progress of the project and the quality of the project to create a solid foundation. After the signing of the technical agreement in accordance with the requirements of the leadership and the combination of chemical water professional project progress requirements, and actively communicate with manufacturers by phone, fax, SMS and other ways to urge. On this basis and design units to maintain close contact with the main designer, timely grasp of the design needs, the design process needs to cooperate with the implementation of the grasp. At the same time, timely understanding of the dynamics of the designers, to establish a friendly relationship, to some extent, has played a great role in promoting the work. Based on the company's plan to determine, although it does not affect the progress of the project, but in order to the next phase of the chemical water professional work focus on the transfer and the full rollout, in a timely manner, the requirements of the company's plan and the preparation of the technical specifications of the equipment not recruited by fax, telephone, etc. to the design unit, as soon as possible from the design of the adjustments and arrangements, and requires the design unit in a timely manner to provide a complete plan. Early improvement to provide construction and other blueprints to ensure that the progress of the chemical water project on schedule.
Four ring tightly linked to take measures to do a good job of equipment scheduling plan, equipment manufacturing quality control.
Overcome the paralyzing thoughts, pay attention to the signing of the contract after the equipment manufacturing period of quality control gatekeeper work. We are far from equipment manufacturers in some aspects of the proficiency, such as ignoring this point does not increase the requirements of its words, hidden danger inevitably exists. Although we can not supervise the manufacturing of each device supervision, but in time to make phone calls, send faxes to communicate with manufacturers, requesting written form to provide step-by-step quality control points in the manufacturing period, to ensure quality is a positive factor in advancing. At the same time, based on the progress of the project, timely understanding of the progress of equipment manufacturing, to ensure that the water project progress needs.
Four problems and measures
(1) There are certain gaps in management, there is no formation of a good management concepts and processes, resulting in work efficiency and other aspects can not meet the needs of modern enterprises. Various types of work that need to be coordinated are not in place. Problems should be actively solve problems, as the grassroots responsible for professional work at this level, not enough in place. Some of the work is not actively reflected to the leadership of the information channels, that is, to their own work to bring passive, but also to the leadership of the work to add unnecessary trouble. In the future, we need to increase the `requirements' for ourselves in this area, and strictly implement them in accordance with the relevant management system. At the same time, it is recommended that the higher-ups speed up the need for coordination to solve the problem of the guidance of the approval of the views.
(2) on the research of some of the equipment there is a lack of proactive situation, failed to put forward a reasonable professional opinion on the future work to bring some constraints.
(3) chemical water professionals in place is not ideal for the subsequent training, equipment commissioning learning and operation of the hidden problems, it is recommended that the higher leadership to speed up the recruitment of chemical water professionals.
Looking back to sum up the work of the year, due to the leadership of the company and the leadership of the Ministry of Engineering under the careful guidance of their own professional although they have achieved certain results, but I am also aware of my own work, there are still some problems and shortcomings, from the leadership of the requirements there is still a certain gap. Therefore, in the future work, I will, as always, in strict accordance with the requirements of the leadership, in order to promote the overall progress of professional work. "Adjustment of work ideas, planning work arrangements, sorting out work methods, clear work plan", combined with the current situation of my company to ensure that the progress of the project and project quality to develop a professional chemical water XX year work priorities and plans. Please review and correct the leadership!
Work focus
(1) on the water pumping station, along the pipeline into the plant together with the design institute to determine the tracking design institute blueprints, to determine the construction unit and the construction of pumping stations and pipeline construction along the way, to ensure that the quality of the project is completed on time as scheduled.
(2) to do a good job of monitoring the key chemical water equipment. Supervision of the equipment is to ensure that the equipment is safe, stable and high-quality operation of one of the important measures. In order to prevent problems before they occur, and combined with a variety of factors to consider the ultra-filtration equipment, reverse osmosis equipment, EDI equipment, sampling and cooling equipment to actively carry out the key points of equipment manufacturing, assembly difficulty points, the material of the gatekeeper points and equipment factory inspection to meet the standards of the supervision of the manufacture of the point.
(3) strictly in accordance with the provisions of the implementation of a variety of water treatment equipment and systems are not put into operation or not running normally, the unit is not allowed to start. Start-up process in strict accordance with the requirements of the Ministry to control the quality of water vapor to ensure that under no circumstances allowed to occur to the pot to send the phenomenon of raw water.
(4) Supervision of thermal equipment into the site after the storage of storage and parts of the anti-corrosion situation, water treatment equipment installation, commissioning, boiler hydrostatic test, chemical cleaning and unit commissioning stage of the water, steam quality supervision and other work, and timely coordination, supervision, installation, commissioning and other units of chemical supervision.
(5) Coordination of construction progress, to prevent the excuse of tight schedule or other reasons and not strictly implement the relevant technical supervision procedures and regulations.
(6) put good chemical equipment, systems and materials acceptance of custody, hydraulic test, chemical cleaning, steam blowing, unit start-up commissioning stage of the water, steam quality supervision and treatment of the various stages of the signing and acceptance of the work.
(7) Supervise the acceptance of equipment, storage, installation, hydraulic test, chemical cleaning, unit start-up before the blow washing and test run process of water, steam quality supervision and other stages of the original records of the accurate and complete establishment of a set of perfect chemical supervision of the technical file.
(8) Increase equipment installation during the water, steam system and various types of equipment, construction, technology and materials, pipeline anticorrosion measures such as supervision and acceptance.
(9) do a good job in the boiler before the first hydraulic test to complete the installation and commissioning of water treatment equipment and systems to ensure that the quality of water for hydraulic test. Do a good job of chemical cleaning to the boiler ignition more than 20 days should be taken to prevent corrosion protection measures.
(10) do a good job of the overall test turn deaerator can effectively remove oxygen and can meet the requirements, auxiliary cooling water dosing system, fine treatment equipment can be put into operation.
(11) to do a good job of unit test run period of chemical supervision and other tasks arranged by the leadership. (Such as: unit thermo-chemical experiments and adjustment experiments, unit temporary shutdown protection, etc.)
Summary of the three: water treatment work summary essay
I am in the company at all levels of leadership under the correct leadership of the unity and cooperation of my colleagues, very well completed the work of the task, professional and technical knowledge and skill level, thinking, etc. have a further improvement. Further improvement. Now the achievements are summarized as follows:
First, professional ethics love their own work, work attitude is correct, conscientious and responsible, able to correctly and seriously treat every job. Work commitment, effective use of working time, stick to their posts, and strictly require themselves to comply with labor discipline and the rules and regulations. Seriously, on time, efficiently complete the tasks assigned by the leadership. At the same time also actively cooperate with other colleagues to do a good job, and in other colleagues have something to be able to take over.
Second, the professional knowledge "water treatment" is through the physical, chemical means, to remove some of the water production, life does not need the process of harmful substances. In order to apply to the specific use of water settlement, filtration, coagulation, flocculation, and corrosion inhibition, scale inhibition and other water quality conditioning process. As social production, life and water are closely related. Therefore, the field of water treatment involves a wide range of applications, constituting a huge industrial applications. Often said water treatment includes: sewage treatment and drinking water treatment of two kinds, some places are also divided into two kinds of sewage treatment, namely, sewage treatment and water reuse of two kinds. Often used water treatment chemicals are: polymerized aluminum chloride, polymerized aluminum chloride iron, alkaline aluminum chloride, polyacrylamide, activated carbon and a variety of filter media. Water treatment work can be measured by water quality standards.
Third, the work position and working ability of my work position is a water treatment workers, a grasp of the water quality of the important position. I am aware of my importance, so I in line with the "do a better job" goal, do a good job, as a water treatment workers, not only to master the professional knowledge of water treatment, but also need to be serious and careful, in order to find the problem, find out the problem, solve the problem. In the daily work, I need to:
1, obey the leadership allocation, on time to and from work, not late, not early, not off duty.
2, strictly according to the operating procedures developed by the company to operate.
3, on duty personnel to carefully fill out the "operating record sheet", "inspection record sheet", "equipment accident registration form" and other required records. 4, adhere to the form of every two reports per shift, timely monitoring of water quantity and quality, found that the problem even if the treatment.
5, pay attention to safe production, civilized production, keep the duty room clean. Found that equipment failure, should be promptly shut down, not allowed to make the equipment work with disease. Common failures, should cut off the power supply after making adequate preparations for overhaul. Major equipment failure, the first should be shut down, ask a professional overhaul, do not allow private overhaul.
6, where major equipment safety accidents or personal injury should be reported in a timely manner, truthfully registered, not hidden.
7, should strictly abide by the company's policies or systems, pay attention to maintain the collective image.
I will further carry forward the advantages, improve the shortcomings, and do my best to do my job. To maintain a good state of mind, carry forward the spirit of hard work, know the difficulties and progress, excellence, rigorous and meticulous, enterprising, "dare to fight and dare to" spirit of hard work. Clear thinking at work, improve efficiency, and strengthen the cultivation of their comprehensive qualities. From the work of the practical work in the continuous enrichment of their learned talents, so that their comprehensive business capacity to exercise and improve.
;