Model contract or agreement for weak current projects

Employer (Party A):

Contractor (Party B):

Party B undertakes Party A's project with a total cost of (in words). Based on the principle of fairness and justice, the two sides agreed to sign a friendly cooperation agreement. The specific rules are as follows:

1, building:

Party B must carry out the construction according to the design scheme provided by Party A (the design scheme budgeted in this contract), and Party B shall not modify it without authorization. If Party A needs to modify the construction plan, which is beyond the budget scope, it will increase the part to make up the cost. In the process of construction, if there are any problems between the construction scheme and the actual construction, both parties shall settle them through friendly negotiation.

2. Material guarantee:

The installation materials used by Party B must meet the technical standards provided by Party A's drawings and the products designated by Party A, and products that do not meet the technical standards shall not be replaced, such as the products of a manufacturer designated on the design drawings; If the manufacturer does not produce or stops producing the product, both parties can solve the substitution problem through negotiation.

3, construction safety:

During the construction period, Party B shall make adequate safety facilities to prevent accidents. Party A has the right to supervise Party B's safety work. When relevant guidelines are displayed, Party B must follow up and improve the working environment. If there are any problems, Party B shall be responsible for them.

4. Technical requirements:

According to the notes in the appendix "Design Description and Quotation".

5, maintenance responsibility:

Party B's maintenance of this installation project; However, it is stipulated that if the installation materials provided by Party B have material quality problems, Party B shall be responsible for replacing them free of charge. If it is a man-made problem, Party B will not bear the cost of materials, but the materials provided by Party A are not within the scope of maintenance (note: in case of unforeseen natural disasters, the maintenance responsibility will automatically terminate).

6. Construction period:

On the premise that Party A provides convenient construction site, temporary water source and power supply, which will not affect Party B's construction, Party B shall complete all the projects within days (i.e. XX years) from the date when Party A notifies Party B to enter the site, subject to the date when Party A passes the acceptance.

7. Payment method:

The total project cost is:

Payment method:

8. Others:

1. If Party A fails to deliver the project payment on time and in quantity without any reason, Party B has the right to charge Party A a late fee of 2% of the total project amount every day.

2. If there are any matters not covered in this contract, both parties can supplement them through consultation. Both parties decide that the supplementary contract has the same effect as this contract. This contract shall come into effect as of the date of signature by both parties. Both parties shall hold one copy of this contract, and both parties shall abide by it. If both parties fail to negotiate, it shall be arbitrated by the court where Party B is located.

Seal of Party A: Seal of Party B: