Supervision of the third quarter work summary
The third quarter work summary is the evaluation of the previous work, must adhere to the principle of seeking truth from facts. The following is the third quarter of the work summary of the public sentiment plea that I brought for you, just for reference!
First: the supervision of the third quarter work summary
First, the project overview
Fuchun River Road South Extension Phase I project north of the status quo Fuchun River Road, south across the Ci'an Mountain in the ancient Yukio connecting line. Fuchun River Road South Extension for the city's main road, the carriageway using viaduct type, along the line across the Xiaoyong Railway Beilun branch line, light rail line 1 extension (long term) and Qiantang River South Road (long term). Fuchun River Road South Extension Project Phase I project is divided into tunnel section and elevated section of two parts, this project for the elevated section, the scope of implementation of the project is as follows: the eastern half of the main line (viaduct starting point ~ Fuchun River Road, pile No. YK11 + 480?YK12 + 790, the total length of the route of 1310m). Bridge project from the south to pile number k11 + 489, north to pile number k12 + 496 total length of 1007m, and reserved Qiantang River South Road interchange ramp interface; projected project investment: 77.28 million yuan, the planned construction period: 400 days.
Second, supervision based on
Supervision based on the project based on national policies, regulations, laws, based on the technical specifications issued by the Ministry of assessment standards, based on the supervision contract, the construction contract, mainly as follows:
1, "urban roads and bridges construction acceptance norms";
2, "municipal", "bridge project quality inspection and assessment standards. Bridge Engineering Quality Inspection and Assessment Standards" (CJJ2?90);
3, "Highway Bridge and Culvert Construction Technical Specification" (JTJ041?2000);
4, "Construction Supervision Specification";
5, the project design drawings;
6, "Supervision Planning", "Supervision Regulations";
< strong> Third, supervision work
Supervision work project supervision group in accordance with the company's quality policy and objectives, according to the agreement with the construction side, based on the design documents and relevant standards and norms to carry out the work. In order to ensure the quality of the project, first of all, we should improve the professional level of the supervisory staff and the ability to know and understand, and make full use of the time to familiarize themselves with the drawings and relevant documents of the bridge project. The whole group of personnel work closely together, adhere to the inspection, tracking, side stations, retesting, sampling and other ways of all-round, whole-process control of the construction quality, according to the standard work, speak by the data, and strive to do a good job? Three control, two management, one coordination? Ensure the quality of the project.
1, strict raw materials and equipment: all kinds of raw materials must be qualified by the quality inspector self-test, supervisor approval before entering the field. Reinforcement, cement, bearings, coarse and fine aggregates and concrete additives, in addition to requiring the construction unit to provide factory quality documents, but also according to the specification for sampling tests; require a variety of raw materials, specifications, standards in line with engineering requirements. In the lower part of the project during the construction of drilled piles, the supervisory staff found that some of the yellow sand contains artificial sand, immediately stop, and require the removal of the field.
2, sub-project inspection system: before each sub-project starts, it is carefully inspected whether it has the condition to start, otherwise it will not be started. After the completion of the sub-projects must be qualified by the self-test, and reported to the supervisor after acceptance and then the next process of construction.
3, focusing on the implementation of the supervision of the bystander system: in the project's hidden works and key parts of the construction of the implementation of the bystander, and make a record, carefully check the compliance of the indicators. In the process of pouring concrete, strict control of the ratio, often random gravel material weighing. In addition to this, we often urge the construction personnel to vibrate the concrete sufficiently to ensure the intrinsic quality of the components. On the site of the construction team to do slump test, compressive strength test sampling frequency, sampling method and test the whole process of side and check. In the process of concrete pouring, in addition to the control of the concrete ratio to ensure that the strength requirements, but also through the field test and mixing additives and other methods of concrete and ease, water retention and final set time control.
Fourth, the quality of the project and safety
1, in the bearing platform of the reinforcement, template, shape, size are in accordance with the "Municipal Bridge Engineering Quality Inspection and Evaluation Standards" (CJJ2-90) of the permissible range of error for strict control.
2, the bridge's pile foundation are through the statutory test unit of Zhejiang Geophysical Technology Application Research Institute for testing, the results are qualified.
3. Reinforcing steel type, specification, size, quantity and welding, concrete strength, etc. are in line with the actual requirements.
Fifth, the progress of the project
Requirement of the construction contractor according to the contract requirements of the total progress of the project plan, annual and monthly construction progress plan and monthly report, review and supervise its implementation, timely comparison of the progress of the plan with the progress of the implementation of the progress of the project on a monthly basis, weekly notification of the owner of the project, when deviations occur to order the contractor to carry out When deviation occurs, the contractor is instructed to make adjustments and is urged to put funds, machinery, materials and labor in place in time. At present, the project has completed the construction of 166 foundation piles, excavation platform seven, through the owners, supervisors and construction units of the three aspects of the *** with the efforts of the foundation piles construction progress over the plan to complete.
Sixth, the measurement of the project
Carefully review the contractor to submit the application for payment of the project, on-site verification of the number of projects, the issuance of payment certificates, and at the same time to do the unqualified works are not measured. Strictly review the contractor's request for additional compensation for a variety of evidence, information records, collation, according to the design drawings, records, the actual situation of the site carefully audit review, meet the requirements of the timely signing of the measurement, control of the project cost, and strive to make the project cost does not exceed the cost of the plan.
Seven, supervision experience
From the current situation, the contractor on the construction quality of the project is more attention, due to the quality of our supervision of the technical and business supervision level of supervision is limited, the experience is lacking, in the work of a number of shortcomings. In the future, the supervision of the workplace still need to make continuous efforts, fully aware of the supervision of the work of a high degree of responsibility, the quality of the project must not be sloppy, strengthen business learning, improve business level, strengthen supervision, supervision efforts, supervision work, business level to further improve.
?
Second: Supervision of the third quarter work summary
First,
1, the work accomplished in this quarter Guizhou China Tobacco Industry Company Limited Zunyi Cigarette Factory Safety Construction Project
1) Daily inspection of the Zunyi Cigarette Factory.
2) Supervision of the construction of the machine rooms of Bent Bow Hill, the factory and Maocaipu by South China Information and the commissioning of the equipment.
2. Zunyi Security Project of Guizhou China Tobacco Commercial Company Limited
1) Collect the audit and settlement reports of Phase I and Phase I additions of Zunyi Commercial Security Project;
2) Assist Cheng Ocean in counting the number of network cameras and alarm equipment of Phase I security project.
3. Guizhou China Tobacco Industry Co., Ltd Guiyang Cigarette Factory Transitional Technological Reform Project
1) Conducted daily inspections of the technology center building to understand the content, history and scale of the construction of the factory's security project.
2)Participate in the project construction coordination meeting organized by the command department.
3) Communicate with South China Information and Zhejiang Zhejiang University about the project construction.
4)Assist in solving the problems arising from the project construction.
4, Guizhou China Tobacco Commercial Co., Ltd. acceptance of security projects in Qiannan
1) acceptance of security projects in the region of Qiannan, *** acceptance of Dushan, urnan 2 counties, *** counting 9 construction sites. The main construction content for the monitoring system, perimeter alarm system, patrol system.
2) Preparation of Dushan, urnan two counties acceptance of the special report.
5, Guizhou China Tobacco Industry Co., Ltd Bijie Cigarette Factory in-situ technological transformation projects, security projects, machine room renovation projects
1) Daily inspection of the factory construction and construction quality inspection, including the factory joint workshop, fire garage, new canteen, the new machine room of the complex building, etc..
2) Participate in seminars and coordination meetings on the progress of technical reform projects.
3) Completed the acceptance of Yangjiatang.
4) Assisting in computer room renovation and Yangjiatang security project collection.
5) Regularly submit weekly reports and plans for supervision of technical reform projects.
6) Organize and collect process documents and related information of projects in Bijie plant.
7) Organize regular meetings on the progress of technical reform projects every Friday, mainly to report the progress of the project and discuss the problems encountered in the construction process.
8) Supervise the contractors of the computer room renovation project to complete the finalization work as soon as possible, in order to facilitate early acceptance.
9) Assist the contractor to solve the problems encountered in the construction, and convey and implement the requirements of the owner.
10) Coordinate the relationship between the project contractor and the owner and other construction units.
Second,
1) the work of the quarter encountered problems and solutions Qiannan security project acceptance of the lack of acceptance data and equipment and materials, after communication and consultation with the owner, the contractor, the contractors are required to supplement the lack of part of the acceptance of the document, according to the owner's requirements within the period of time will be delivered to the site of the equipment and materials.
2) the new factory technology center building in Guiyang, outdoor plum pipe was destroyed by the forklift when removing garbage, after communicating with the telecom company responsible for personnel and understanding, the telecom company will be damaged the next day to replace the plum pipe. 9 floor conference room ground line pipe line interface was buried in violation of the law, after the first standard site responsible for the second installation site responsible for the investigation and communication, the decision was made by the first standard of their own excavation to find the line interface and responsible for the restoration of the excavated part of the ground. Responsible for the excavation part of the recovery.
3) Bijie Cigarette Factory Yangjiatang depot acceptance, because the fire fighting equipment is not put into use, resulting in fire fighting and monitoring, broadcasting system linkage function can not be verified for the time being, because of the construction of fire fighting pools, resulting in the collapse of the wall, the 1-5 defense zone can not be verified for the time being, and in addition to the outdoor chassis lightning protection grounding did not do the resistance value of the test, according to the bidding documents should be up to the value of the resistance 4 ohms. After communication and consultation with gold waves, the owner, the contractor decided that the above issues as a legacy, to have the conditions for testing and verification; joint workshop construction process, the current three corridors above the ceiling because of the need to increase the strong electrical bridge to do deepening, the current ceiling above the work has been stopped to be designed to the design institute to the field to reformulate the deepening of the program.
Third, the next quarter work plan
1) Do a good job with the work between Liu Da handover.
2) Study the "Information Systems Supervisor Tutorial" and take the supervisor exam seriously.
3) Daily inspection and construction quality inspection of the plant technical reform projects and future security projects in the field.
4) Timely issuance of project-related documents, work contact sheets, meeting minutes, memos, etc..
5) Maintain and implement the regular meeting system of Bijie factory.
6) Regular project communication with owners and contractors to maintain the relationship between us and owners and contractors, and between owners and contractors.
7) According to the company's KPI content seriously and carefully treat the work and projects.
8) Focusing on potential business opportunities and helping to enhance the department's business capabilities.
9) Assisting supervisors and other staff in the collection process.
10) Supervise contractors of technical reform projects and strive to complete 80%-90% of the construction content by the end of the next quarter.
11) Completing the acceptance of the technical center building project of Guiyang plant.
12) Collect the professional and related professional information, summarize the supervision project experience to improve and enhance their ability to work as soon as possible to grow into a professional supervision engineer.
Four, personal feelings
In the blink of an eye, this quarter is coming to an end. This period is difficult and contradictory, along with the gradual increase in the workload and work content, I have some questions about the work of supervision. What kind of function should a supervisor be defined as? Or how should I look at my job? In retrospect, I feel that my main work content is in the repetition and continuous writing a variety of documents, according to the company's KPI assessment system, the weight of the document part of the 70%, although this is enough to reflect the importance of the document, I also understand that the document is the embodiment of the value of the work and the embodiment of the results of the project.
I think that no matter in life or work, there should be fun, but in the current work I can not find fun, but will produce some resistance and pressure, I believe that some of the new colleagues will also have the same feeling. I believe some of my new colleagues will feel the same way. Maybe I do have problems with my work ability and attitude, but I hope I can find the fun and share it with you.
I feel that there is too little communication and rusty relationship between our colleagues. It may be due to time or the nature of the work, but I hope we can increase the communication and interaction between our colleagues in the future (I suggest we should organize more activities and parties, etc.) to enhance the relationship with each other, and to create a lively and cordial working atmosphere, and not to be too formalized and process-oriented.
In addition, I also suggest that the company in the standardization of our travel system at the same time can improve and perfect the company's own process, should be more effective and humane way to deal with.
At the same time, I think Amgen is a competitive and humanized team, caring and tolerant of employees, focusing on corporate image, cohesion, etc. are the good qualities of Amgen, and I also hope that Amgen can shape a better team spirit and quality. In the next quarter, I will work harder to complete my work.
?
Third: Supervision of the third quarter work summary
First, the project overview:
Guizhou Bijie Qixingguan District 20XX rural sending system attack project student dormitories, teachers public rental housing construction project construction, located in Bijie City, Guizhou Province, Qixingguan District, Haizi Street Township, Duck Pond Township, Qianxi Township, Salaxi Township, Changchunbao Township and other primary and secondary schools teachers' public rental housing and student dormitory building project project six and eight areas, five townships and 64 projects, with a storey height of 2~5 storeys, the project project overview is as follows:
(a) Project profile
Construction unit; Education Bureau of Qixingguan, Bijie City, Guizhou Province Survey unit; Bijie City Foundation Co.< /> p>
Design unit; Guizhou Shenzhen-Hong Kong Zhongtian Architectural Design Co. Supervision unit; Guizhou Construction Supervision and Consultation Co. Quality supervision unit; Bijie Qixingguan District Quality Inspection Station
Contractor; Henan Province First Construction Engineering Group Co. Company contract scope; building structure, decoration and warranty phase (b) building design overview;
2.1, project name and address;
2.1.1, Changchunbao Town, Qixingguan District, Bijie City, Guizhou Province Changchunbao Middle School, Changchunbao Second Middle School, Slippery Rock Elementary School, Ganyan Elementary School, Xiawu Elementary School, Naked Clothing Elementary School, Heping Elementary School
2.1.2, building design Overview
2.2.1, Haizijie Township, Bijie City, Guizhou Province, Haizijie Central School, Hai Zhong, Hai Erzhong, Wang Zhang, Thirteen Mou, Fifty Mou, Burnt Bars, Qianshuo, Rotten Nai, Duck Pond, Shashao
2.2.2, Overview of the Architectural Design
2. 3.1, Thousand Creek Township, Bijie City, Guizhou Province, Chixi Township Central School Primary School, Thousand Creek Middle School, Shajang, Falang, Zhongtun, Thousand Ranggu < /p>
2.3.2, Building Design Overview
2.4.1, Salaxi Township, Bijie City, Guizhou Province, Salaxi Central School, Salaxi Middle School, Shaba, Xinglong, Shale, Xixi, Yangliu, Yongxing, Bashan, Chaoying, Changying, Gaoying, Longchang, Xiaolong 2. 4.2, Building Design Overview
2.5.1, Duckchi Township, Bijie City, Guizhou Province, Coal Chunching, Shapa, Eighteen Primary Schools, to the river, duck pond elementary school 2. 5.2, building design overview
(c) structural design overview
(d) strip foundation and independent column foundation, raft slab foundation overview
(e) the current status of the project
this project is located in qixingguan district, bijie city, guizhou province, qixingguan district, haizijie township, duck pond, a thousand creeks, sara creek township, changchunbao township, etc., in the large and medium-sized schools,. All the plots have advantageous geographical location and convenient transportation. The maximum backfill depth for this project is approximately 2.5 meters to 3.5 meters.
Second, the construction image progress status:
2.1.1 At present, the main work of the image progress as follows:
2.1.2 Other parts of the project image progress: the main project was completed in October to mid-December, has been completed the foundation and the main body of the sub-items, the test batch of works and passed the acceptance, project quality Qualified.
Third, the site supervision organization and site supervision of the completion of the preparation of operational documents:
3.1. project supervision organization:
Qixingguan District, Bijie, Guizhou, 20XX years of rural boarding system to attack the project of student dormitories, teachers, public rental housing construction project project supervision of site supervision organization of the whole staff according to the owner, Project Management Department's work layout and requirements, not only always maintain full attendance, and even on holidays, as long as the site work needs, the relevant professional supervisors can consciously go to the field to perform their duties. The list of actual personnel presently on duty in the project site supervision organization
3.2. Completion of the preparation of site supervision operation documents:
Up to the present 64 projects in the six and eight areas of the project of the rural boarding system attacking the project of student dormitory and teachers' public rental housing construction project in Qixingguan District of Bijie, Guizhou, the supervisory organization has been working in the framework of the company's quality system, based on the supervisory contract, Engineering construction supervision specification and the company's quality management system documents were prepared and completed on-site supervision of operating documents, and review and approval of the implementation of the supervision plan 30, 336 supervision implementation rules, including: supervision planning, supervision rules, bystander supervision rules list
Fourth, supervision of the completion of the work of quality control:
4.1. technical preparation
Our on-site supervision organization according to Guizhou Bijie Qixingguan District 20XX rural boarding system attack project student dormitory, teachers public rental housing construction project engineering construction characteristics, on-site preparation of the construction of the construction of this project related to the GB standard specification of various professional engineering, the compilation of relevant national mandatory standards of engineering construction, as well as a number of relevant professional engineering construction acceptance specifications. Specifications, etc. In addition, the contract, design documents, construction norms and standards, as well as the relevant national mandatory standards of familiarity and understanding, for the smooth implementation of on-site supervision work provides a basic guarantee.
4.2 Implementation of quality control procedures completed
According to the national construction supervision specification, and according to the specific requirements of the quality control work of the project management department, the main workload of the project on-site supervision organization to implement the completion of the workload specifically includes:
4.2.1. Supervisory engineers contact 7, the owner and the general contractor for the site of the project to remind the owner or the general contractor to take appropriate action in a timely manner. Remind the owner or the general contractor to take appropriate measures or methods to avoid engineering problems;
4.2.2. Supervising Engineer Notice 25, for the site of the quality problems, timely issuance of supervision notices to supervise the construction unit to rectify in a timely manner, in a timely manner to ensure that the quality of the works on site is always in a controllable state;
4.2.3. after the supervisory review and modification of the perfect Approved construction design, temporary power plan, construction technology program *** 29;
4.2.4. According to the owner's work layout and requirements, and combined with the actual construction site, the supervision of the timely and effective implementation of various types of construction quality special inspections, written reports to the owners of the various types of quality inspection of the thematic report *** 6, while the tracking of the implementation of the relevant issues; p>
4.2.4. p>
4.2.5. According to the actual situation of the site construction quality, the supervisor timely and effectively hosted the convening of all kinds of thematic coordination meeting 12 times, coordinated to deal with the quality of the problem, while the implementation of the thematic coordination meeting minutes;
4.2.6. site supervision for the field of all professional engineering materials, components and accessories strict quality control. After inspection and acceptance, the supervisor agreed to use the project materials/components/equipment 26 applications for inspection, a total of 20 batches, which found unqualified reinforcing bars, a total of 1 batch, all of them for the return treatment;
4.2.7. civil engineering, water supply and drainage, electrical specialties according to the requirements of the design and specifications, and combined with the actual construction of the site, the timely and effective implementation of the relevant construction quality inspection and acceptance, including the relevant hidden construction quality inspection. Including hidden works construction quality inspection, inspection batch or sub-projects construction quality inspection, etc.; V. Supervision progress control work completed:
5.1. According to the owner's progress control requirements and arrangements, and the general contracting unit of the construction organization design and the total progress of the plan, the project department targeted the `making of the progress control plan.
5.2. In order to meet the owner's requirements for progress nodes, the supervision team for the progress of the project site to take a monthly report system, so that the owner can control the latest progress of the site and the reasons and recommendations, and take timely measures to ensure that the progress nodes of the successful completion. At the same time, the construction unit of the project in addition to the total progress plan, monthly according to the actual progress of the actual situation and the actual situation of the site to develop a monthly progress plan, and the total progress plan for the amendment; require the construction unit to weekly report weekly plan, timely amendment of the weekly plan, so that it meets the requirements of the total progress plan.
Six, safety supervision work review:
6.1 Do a good job of pre-construction safety supervision, strengthen the safety control before construction
6.1.1. Developed safety and civilization of construction and other supervision rules, the site of the safety supervision provides the basis for the operation of the safety supervision, the development of safety management objectives, a clear division of supervisory staff, by the director of the representative personally to grasp the safety, all the way to the end. By the superintendent's representative to personally grasp the safety, full management of safety, as far as possible to find hidden safety problems, the safety risk eliminated in the nip state;
6.1.2. For special professional / division project safety, the preparation of special safety rules, the technical complexity, professionalism, safety construction of the project of the risk of large. To this end, we prepare supervision implementation rules according to the relevant requirements of the relevant mandatory standards;
6.1.3. Check and acceptance of 18 sets of various types of construction machinery, equipment, facilities, as well as 31 various types of special operators qualification audit.
6.1.4. review the construction organization design, special construction program of the content of the safety and technical measures 5, and put forward supervision to supplement, improve the views of the approval of the implementation;
6.2. to do a good job in the construction of on-site safety supervision, to strengthen the safety control of the construction process
6.2.1. to strengthen the safety inspection of the construction site to achieve at least once a week, a safety Civilization inspection, every day there are personnel on the safety and civilization patrol, on the detection of hidden safety hazards in a timely manner to notify the construction unit, and supervise the implementation of rectification;
6.2.2. For the site of the larger hidden safety hazards found in a timely manner to issue the supervision of the safety rectification of the single notice of 9,
seven, investment control supervision review:
7.1 Do a good job on-site engineering quantitative supervision work to strengthen the construction process safety control.
7.2 Timely and rigorous review of the construction unit's monthly progress payments, and settlement reports.
7.3 Timely and rigorous review of the general contractor's progress payments, to ensure that the construction unit will not be delayed due to progress payments.
VIII, the main problems:
8.1 site supervision is too much consideration of the progress of the project, the emergence of quality problems, safety hazards part of the gatekeeper is not strict. As a result, in the construction process of quality and safety monitoring from time to time appear passive situation;
8.2. Some construction subcontracting team's own quality assurance system can not function well, resulting in the effective implementation of on-site construction quality control program is difficult, many times, on-site supervisor has become almost a construction unit quality inspector, even if it is so, some of the quality problems of the rectification can not be effectively implemented in a timely manner. Timely and effective implementation. Civil engineering problems in this regard is particularly prominent, mainly in Henan Province, the first construction engineering group limited liability company turnkey management force is relatively weak, the construction team's professional ability and work responsibility there are certain problems, to the site project management and supervision of work to carry out a great deal of difficulty;
8.3. construction site material quality fluctuations in the supply of materials, the construction of the project objectives of the smooth realization of a certain impact;
8.3. The construction site material supply quality fluctuates greatly, the smooth realization of the project construction goals have a certain impact;
8.4. some construction units of construction data can not be synchronized in a timely manner, and even some of the important construction technical information, safety information, not only has been a serious lag, but also has not yet been effectively implemented;
8.5 some construction units of safety awareness is poor, resulting in the effective implementation of the site safety control procedures are difficult, some of the security problems still can not be effectively rectified in a timely manner. Rectification of the problem still can not be timely and effective implementation, and very easy to produce repeated phenomena, which is the first construction engineering group in Henan Province, the first construction engineering group in Henan Province, the overall management system has a great deal to do with the weak safety management force, but the site supervision team joint owners, the government to monitor the main body, after unremitting efforts to effectively reverse the loss of control of the main body of the initial safety and civilization The trend, but still need to strive to prevent the recurrence of the phenomenon occurs.
Nine, Guizhou Bijie Qixingguan District 20XX rural boarding system attack project
Supervision group's next step in the work intends to:
9.1 quality
9.1.1 strict control of the decoration phase of the quality of the project, the focus of the quality of decoration works, strict quality of the materials off, the incoming materials, strict inspection, so that timely delivery of inspection, the quality of the materials, the quality of the materials, the quality of the materials, the quality of the materials, the quality of the materials, the quality of the materials, the quality of the materials. Strict inspection, to achieve timely delivery of inspection, the unqualified materials in a timely manner to return;
9.1.2. water and electricity, fire and other equipment supervision strictly construction units reported on the quality of incoming materials and equipment, the quality of the information on the review of certification;
9.1.3. water and electricity, fire and other professional fire and other equipment to do a good job in the linkage of debugging supervision work;
9.1.4. Improve the acceptance of the sub-projects and divisions of the project, a comprehensive collection of project information to organize, to create conditions for the completion of the project acceptance.
9.2 Safety
9.2.1. Safety continues to require the construction unit to implement the construction responsibility at the same time, focusing on the implementation of the safety responsibility, firmly establish the idea of safety first, alarm bells ringing.
The next safety supervision focus: ① scaffolding demolition, ② monitoring the normal operation of large-scale mechanical equipment in the final stage of the completion of the demolition, ③ safety supervision data organization.
9.2.2 Supervision engineers to do daily safety supervision visits and inspections, demolition of external scaffolding and tower crane demolition side supervision;
9.3 progress
9.3.1 Supervision of the construction unit to report the total progress of unfinished works plan, coordinating the construction of various professional works, coordination of the owner and the construction unit of the coordination of the project as soon as possible to promote the completion of the project.
9.3.2 Continue to adhere to and effectively implement the completion of the project daily system, timely inspection and confirmation of the actual completion of the project and statistical reports;
9.3.3 Strictly in accordance with the contract duration and the owner of the progress of the node to control, and actively coordinate with the construction unit monthly according to the actual situation of the construction site to adjust the progress of the plan, to ensure that the project progress has been in a state of control;
9.4.
?
Fourth: Civil Supervision Third Quarter Summary
Large passenger aircraft development and protection of conditions for the construction project of 11 single units, with a total floor area of 63,227 square meters supervised by the Shanghai Consulting Construction Engineering Consulting Co. on sheet metal, numerical control, heat treatment, 1 # shift building, 2 # shift building, 13 restaurant, 08 restaurant, Sewage treatment station, non-destructive physical and chemical and table treatment plant and other engineering progress, collection and the next quarter supervision work control report as follows:
First, the project engineering progress
Sheet metal numerical control: Sheet metal equipment pouring the completion of the floor; Sheet metal numerical control as-built information compilation. Heat treatment plant: the completion of data compilation; basement leakage repair, weak electricity, interior decoration finishing work continues.
2 # shift building, 13 restaurant: now in the completion of the finalization work, of which 13 restaurant key has been delivered, has been put into the owners use.
1# shift building, 08 restaurant: now in the construction of catching up progress, weak electricity, interior decoration work construction; 1# shift building outer frame has been removed.
Nondestructive testing, physical and chemical center: physical and chemical main structure acceptance is complete, the first floor of the interior wall painting completed the second floor wall painting completed 70%, the curtain wall main keel installation 50%, weak power bridge, ventilation pipe installation, a layer of the ceiling is completed 50%,. Non-destructive roofing water-repellent pearl board, fine stone concrete construction completed, internal water, electricity, heating and ventilation construction,. Table treatment:A area first floor structure is completed, C area second floor structure is completed, B area second floor structural reinforcement, template completed 90%; D, E area floor slab foundation is completed.
Second, the collection
This quarter as planned has recovered about 1.4 million.
Third, the next quarter supervision work
Sheet metal CNC: with the owner to do a good job of completion of the data compilation and completion of the acceptance.
Heat treatment plant: unfinished work, basement leakage, attached to the building decoration and finishing work of weak electricity; with the owner to complete the acceptance.
2 # shift building, 13 restaurant: supervision organization pre-acceptance, the existence of problems notify the construction unit to rectify, with the owner of the completion of the acceptance.
1 # shift building, 08 restaurant: monitoring of the unfinished work, the end of October, the supervision organization pre-acceptance, the existence of problems notify the construction unit to rectify, with the owner of the completion of the acceptance.
NDT, physical and chemical center: continue to internal installation, curtain wall, decorative decoration work, roof waterproofing and insulation monitoring.
Table processing: annex building, main plant floor, annex building structure, roof construction, basement equipment foundation quality, progress, safety supervision and monitoring work.
;