Party A:
Party B:
Project address:
Project name:
Party A will contract the steel bar sub-project of Houting Maozhoushan Industrial Plant Project to Party B, and in accordance with the relevant provisions of the Economic Contract Law, the Construction Law and the Labor Law, in line with the principles of fairness and mutual benefit, Party A and Party B have reached the following agreements through negotiation:
1. Scope and method of subcontracting
(1) Scope of subcontracting
1. All works of Maozhoushan Industrial Park Plant shall be constructed according to the construction drawings (including constructional columns, lintels, parapets, stands, window head bedplates, air conditioning panels, pile cores, fire pools, guard rooms, septic tanks and other reinforcement works).
2. Manufacture, installation and welding of steel bars, embedding of iron pieces, dismantling of operating frame, cleaning of construction residues and sundries, cleaning and stacking of construction machinery, equipment, tools and materials. Short reinforcement shall be welded as far as possible according to the arrangement of site management personnel, and no waste of materials is allowed.
3, responsible for the installation of reinforced protective layer pad.
4. Be responsible for the reserved reinforcement of inserted columns and constructional columns (if Party B fails to insert the reserved reinforcement in time, or if Party A sends someone to insert the reinforcement and the salary incurred after planting the reinforcement will be deducted from Party B's salary). If the formwork worker fails to drill holes in time, he should immediately notify the site builder, otherwise it is also the responsibility of the reinforcement class.
5, including welding, pressure welding and threaded sleeve connection costs.
6. For the steel bars welded by Party B, test pieces shall be made according to the quantity required by the acceptance specification, and all joints shall be qualified. If it is found that the inspection is unqualified, Party A will impose a fine of 5 yuan on Party B every time.
(II) Subcontracting methods
1. Carry out technical construction such as production, installation and cleaning according to the quality requirements of structural construction drawing, building construction drawing, blue prints.the design, change notice, current national construction specifications and operating procedures. Including labor protection articles for construction and steel bar making machinery (including steel bar binding and binding). All material turnover and manpower transportation within the fence of the working face are guaranteed, and the sundries (such as cushion blocks) left over from the construction of the rebar workers belonging to the floor are taken care of, and the stirrup making tools, labor protection articles, self-safety and civilized construction are guaranteed.
2. quality, duration, safety and civilized construction, construction measures and other relevant work contents of this contract.
3. In order to ensure the construction progress, Party B must keep enough construction personnel when binding the steel bars at various parts. If Party B is short of personnel, Party A will mobilize and increase the staff, and Party B will pay the salary.
4. Binding: transfer of molding materials in the construction site, vertical and horizontal transportation of molding steel bars in the site, cleaning of odds and ends in the mold, binding according to design drawings, construction specifications and technical disclosure (including binding of cold drawing of master's roof), placing cushion blocks and erecting necessary binding frames. After binding, the remaining steel bars shall be recycled to the designated place in the processing shed according to specifications and models, and the binding wires shall be cleaned and recycled. Binding of sporadic components. Reinforcement protection during concrete pouring. When the concrete label is different (steel wire mesh is installed at the junction of beam, column and wall); Cleaning of waste steel bars.
5. Steel bar production: the transportation of raw materials and molding materials in the construction site is divided into specifications and models, neat stacking, listing, labeling, bundling, installation, debugging and maintenance of steel bar processing machinery, including steel bar batching (sample turning).
6. steel bar straightening, cutting, butt welding (all steel bars over 8CM are butt welded and utilized), processing and molding (including the production of cold-drawn roof), specification, model, neat stacking and listing, re-processing and utilization of the remaining steel bars after binding, cleaning of waste steel bars, standardization of civilization in the processing area, cleaning and cleaning. Welders must have a special type of work operation certificate and hold relevant certificates.
7. It includes the fabrication of tie bars, prefabricated members and steel bars in the whole construction process.
II. Total contract price
1. The total contract price of this project is fixed at one time, and settled according to the construction drawing with a construction area of 52,646.3 square meters. The unit price of this project is RMB /m2, and the total price is RMB (say RMB one hundred thousand and one hundred yuan only).
2. After Party A and Party B sign this contract, Party B will pay the construction period and quality security deposit RMB to Party A within three days. After the completion of this project, if Party A confirms that there are no remaining problems, it will be returned in full without interest within ten days.
3. If the work stoppage exceeds two months due to Party A's reasons, Party B has the right to ask to leave, and Party A shall calculate 1% of the actual workload completed by Party B and return the deposit.
3. Payment method
1. Party A will pay Party B 65, yuan for completing the foundation to ., 13, yuan for completing the three-story structure, 2, yuan for completing the six-story structure, 2, yuan for completing the nine-story structure, 15, yuan after the main body is completely capped and the ladder pool is completely completed, and the remaining yuan will be paid within 3 days after all the projects within the contracted scope of the concrete shift are completed.
2. if party a finds that party b has technical and quality problems in the construction process, party b shall immediately rectify and rework unconditionally. if the rectification fails, party a has the right to ask party b to leave the site and pay 7% of the completed project.
3. if the work within the contracted scope cannot be completed due to the subjective reasons of party b, party a will have the right to re-define the settlement method, in addition to not enjoying the labor standard of this contract, and the unit price of the work day completed by party b will be settled according to 7% of the contract.
4. party b shall unconditionally accept the reward and punishment measures stipulated in the project construction contract signed by party a and the owner.
5. party b's application for the project payment must be signed and approved by the relevant responsible management personnel of party a, and can only be paid after the approval of the general construction.
6. Within three days after Party A pays Party B the progress payment for each period, Party B must submit the worker's salary to Party A, otherwise Party A will stop paying the progress payment for the next period until Party B submits the worker's salary table for that period.
IV. Contract duration
The total contract duration is about 1 days, and it is required that the number of construction personnel entering the site should not be less than 1, so as to ensure that the task is completed according to the schedule of the project department. If the project progress is delayed within 4 hours, it will be fined 2, yuan, and if it exceeds 4 hours, it will be fined 6, yuan every day. If the delay in the construction period seriously affects the progress, Party A has the right to terminate the contract and settle accounts at 7% of the completed quantities.
5. Requirements for quality, safety and civilized construction
(1) Quality requirements:
1. Before the construction of the project, Party B must know Party A's quality policy in detail, and carry out the construction and acceptance in strict accordance with the current national Code for Acceptance of Construction Quality, Unified Standard for Acceptance of Construction Quality of Building Projects and Mandatory Provisions for Construction Standards, so as to meet the standards of municipal model projects.
2. All the beams and slabs are fully reinforced, so as to ensure that the quality of the acceptance batches and subdivisional works constructed can reach the national quality standards of qualified projects at one time and ensure the city model projects.
3. The rework loss rate of general quality problems is less than one thousandth. If the acceptance is unqualified, the rework shall be punished by 2 times the cost price.
(II) Safety production requirements
1. No casualties, serious injuries, major mechanical equipment accidents, fire accidents and poisoning accidents.
2. The rate of minor injuries should be controlled within 5%;
3. The safety inspection score is over 95%.
(3) requirements for civilized construction
1. Materials on the construction site shall be neatly stacked, clearly marked and cleared after work, so as to reduce waste as much as possible;
2. Make sure to create a "civilized construction site". On-site construction must be cleared after work, and all the materials used by the reinforcement class should be cleared in each working class before coming off work. All materials used in the reinforcement class are strictly prohibited to be stacked on the outer bent.
3. The waste steel bars in the workshop must be piled up in the place designated by Party A. Party A has the right to impose a fine on those who do not follow the instructions and pile up indiscriminately.
VI. Responsibilities and Obligations of Both Parties
(I) Responsibilities and Obligations of Party A
1. Be responsible for formulating the control plan of engineering quantity and project progress, as well as a series of rules and regulations on safety production, labor discipline, public security regulations, family planning, etc., and handle affairs impartially, treat Party B's personnel equally and treat them equally with the same reward and punishment system.
2. Strictly implement the national labor safety and health regulations and standards, and educate Party B's personnel on labor safety and health, so as to prevent accidents during labor and reduce occupational injuries.
3. provide relevant technical data required by party b in the construction process, control the distribution quantity of materials according to the quota, and explain to party b effective measures such as technology, safety, quality and economy.
4. Always guide, inspect and urge Party B's safe, quality and civilized construction and the completion progress of work tasks.
5. Have the right to supervise and inspect Party B's implementation of the Labor Law and other laws and regulations, and have the right to supervise Party B's salary distribution.
6. when party b fails to fulfill the relevant requirements of this contract, party a has the right to take all measures to unilaterally terminate the contract, and all direct or indirect losses caused by it shall be borne by party B ..
7. According to the site conditions, Party B shall be provided with food and accommodation, and its expenses shall be borne by itself.
8. supervise and inspect the quality, safety, progress and civilized construction of party b, and put forward rectification opinions and measures for those that do not meet the requirements. If Party B's rectification fails to meet the requirements or refuses to rectify, Party A has the right to send someone to rectify, and the cost will be deducted from Party B's labor cost by twice the workload cost of rectification.
(II) Responsibilities and tasks of Party B
1. Party B shall bear the formalities for entering Shenzhen; All workers entering the site must apply for residence permit, construction insurance and social insurance, and the expenses shall be borne by Party B.. When entering the site, Party A will be responsible for the insurance, and the insurance fee will be deducted from the progress payment.
2. 1 yuan will be paid for each person who handles the pass, and the pass will be returned when leaving the venue, and Party A will return the deposit. One set of work clothes will be issued to each person, and the cost price of each set will be recovered at the market price.
3. strictly abide by a series of rules and regulations formulated by party a and obey the inspection, guidance and education of relevant personnel of party a ..
4. The person in charge of Party B must be stationed at the site to direct and manage the subordinate personnel, and the management technicians shall be equipped with a general manager and three constructors on site. The constructors of Party B must be present during the floor pay-off, assist the constructors of Party A in pay-off, and cooperate with the work. When leaving the site, Party A's consent must be obtained. The builder of Party B must strictly control the products made by the team, and each part shall be inspected by the builder of Party B first, and then by Party A's construction. If any unqualified parts are found in Party A's construction inspection, Party B must correct them within 1 hour, otherwise Party A has the right to send other personnel to carry out the construction, and the expenses shall be borne by Party B, and a fine shall be imposed as appropriate. In the process of construction and production, the construction shall be carried out in strict accordance with the drawings and instructions, and Party B shall bear all the economic losses caused by excessive consumption and waste of materials due to Party B's reasons. The construction site shall be constructed in a civilized manner, and the site shall be cleared after work.
5. Any sick leave, personal leave, etc. of Party B's personnel shall be handled by themselves, and the accident expenses caused by non-work-related injuries or shift workers shall be borne by Party B.. The insurance company shall bear the compensation of the insurance limit for work-related accidents of more than 2, yuan, and Party B shall be responsible for the difference between the actual expenditure of the work-related accidents and the amount claimed by the insurance company, and Party B shall be responsible for the workers who have not bought insurance.
6. Party B shall be responsible for properly solving the internal labor disputes. If there is a lawsuit or complaint, a strike or an opportunity to make trouble, Party A has the right to impose a fine of 2, to 5, yuan on Party B each time, and has the right to use Party B's project funds and performance bond to handle the labor disputes of Party B. If Party B's workers interfere in the office, which will affect production and site construction, they will be fined 5, to 1, yuan each time.
7. Workers should obey the management personnel and security guards of Party A to carry out public security management. If there is a fight on the construction site, the parties and the team will be fined 5-1 yuan. If the circumstances are serious, they shall be punished by the political and legal departments.
8. When the concrete is cast, someone should pad the protective layer of reinforcement and arrange the chaotic reinforcement, etc. If it is found that there is no follower or the follower is irresponsible, 2 yuan will be fined every time.
9. According to the design drawings and the current national construction acceptance specifications, the drawing sheet of each layer must be sent to Party A for review one week in advance to ensure accurate drawing and prevent waste.
1. Organize the corresponding construction personnel according to the contracted quantities. The personnel entering the site must be reasonably matched. They are men aged 18-45 with good ideological quality, strong technical ability and no health diseases and infectious diseases. Each contracting team has a comrade with strong organizational ability, good technology and strong sense of responsibility as the team leader, forming a systematic management. At the same time, the team leader shall not leave the site without the approval of the on-site supervisor of Party A, and actively participate in the relevant meetings organized by Party A or the general contractor. Anyone who leaves the site without authorization or does not attend the meetings that should be attended will be fined 5-1 yuan/time.
11. Be familiar with the construction drawings, organize the construction in strict accordance with the Code for Construction and Acceptance of Building and Installation Engineering and the design requirements, ensure the quality, progress and safety of the project, and pay for the rework caused by poor management and failure to meet the quality standards.
12. The people entering the site of Party B must be relatively stable, and the team members shall not be arbitrarily changed without Party A's consent.
VII. Settlement of contract disputes
(I) Liability for breach of contract
1. Either party to the contract fails to fully perform the terms of the contract, which is a breach of contract. All the responsibilities and economic losses caused by breach of contract shall be borne by the breaching party.
2. If Party B's personnel do not obey the arrangement, leave or change at will, which affects the quality and progress of the project, and the technical level is poor or the planned progress cannot be completed continuously, and there is still no substantial improvement within one week from the date of requiring correction, Party A has the right to terminate the contract and notify Party B in writing to withdraw the project contract; Party A has the right not only to refuse to pay Party B's project payment, but also to claim compensation for economic losses, or to deduct money from the deposit reserved by Party B to make up for the economic losses caused to Party A..
(II) Settlement of Contract Disputes
In case of any dispute during the performance of this contract, both parties shall settle it through friendly negotiation. When no settlement can be reached through consultation, with the consent of both parties, mediation can be conducted to the superior competent department or the municipal construction competent department; If you are dissatisfied with the mediation, you can submit it to the municipal labor arbitration.
VIII. Rewards and fines:
1. Abide by the contract regulations, not violate the safety and quality system, and civilized the construction team. Settlement and reward according to the contract.
2, such as violation of safety and quality system, uncivilized construction team. The penalty shall be imposed according to the following regulations:
3. Those who violate the following provisions shall be fined in RMB for each person in 1 yuan, 5 yuan, 5 yuan and 1 yuan;
1) those who go to work without a work permit; 3 yuan
2) Those who go to work without "three-level safety education" registration; 1 yuan
3) Bedding in temporary dormitory is not neatly stacked; 5 yuan
4) The person in charge of each room in the temporary dormitory is not clean and hygienic on the day of duty; 2 yuan
5) those who make noise during the prescribed rest time in the temporary dormitory area; 2 yuan
6) Fight and make trouble in the construction site and living quarters; 5 yuan was punished for the first time, 1 yuan for the second time and so on.