On the removal of end-of-life X-ray machines, we have more experience, the main practice is as follows two:
A, slow demolition method, twisting screws step by step to remove.
1, to prepare the tools, probably including: wrenches, hexagonal keys, a screwdriver, Phillips screwdriver, large scissors used to cut wires, cut steel wire and so on.
2, cut off the power, cut the wire. Because it is safer to operate without electricity, in the absence of electricity, there is no electromagnetic field generated, there will be no electromagnetic wave radiation.
3, two people dismantling may take 2 days to finish dismantling, after the completion of the recycling company can be called to the door to recycle, because the recycling company will have to further dismantle the metal after the classification of the return to the furnace.
Two, fast demolition method. Cutting with fire, this method is relatively fast, our recycling company usually use the most, however, must be the site environment allows the use of this method of operation, if the ventilation conditions are not good, cut with fire will produce some toxic fumes, the need for extraction of smoke, preparation tools are: including the above mentioned tools, as well as gas bottles and atmospheric bottles, cutting guns, professional cutters (certified), equipped with one to two workers to help move away, this method takes time about half a day can be.
The following are the photos taken at the demolition site of our company, which are provided for your reference, and I hope the above description will be helpful to you, thank you!
After the demolition is completed, the company provides the following certificates: