How to write the notice of resumption of work under the epidemic selected

The situation of the new crown pneumonia epidemic is grim, we have to be united to overcome the epidemic, to meet a better tomorrow, only in the guardianship of their own foundation, our country can resume work and prosperity. So what kind of epidemic resumption notice is more high quality? Please read by us for you my how to write a notice of resumption of work under the epidemic, for the convenience of subsequent reading, please bookmark this article.

How to write a notice of resumption of work under the epidemic Part 1

According to the "xxx" "xxx" "xxx" and the city's major public **** health emergencies the first level of the response mechanism of the relevant provisions of the city, the city's new coronavirus-infected pneumonia outbreak prevention and control command research and decision, is now delaying the resumption of the city's enterprises to resume work and resume work notices are as follows:

First, the city's region of the enterprises to resume work and resume work shall not be earlier than The city's first ever national security system is the National Security Agency (NSA), which was established in 1977. Involved in the protection of urban operation necessary (water supply, gas supply, power supply, communications, environmental protection and other industries), epidemic prevention and control necessary (medical equipment, pharmaceuticals, protective products production and other industries) and other related to the vitality of the country's economy and people's livelihood of the relevant enterprises except. Employers must protect the legitimate rights and interests of employees in accordance with the law.

Second, there are special reasons for early resumption of business enterprises, must develop epidemic prevention and control programs to the competent authorities to submit a written application, agreed to before resumption of business (prevention and control of the detailed requirements of the program by the Municipal Bureau of Economics and Information Technology, in conjunction with the relevant departments to be notified).

Third, the resumption of business enterprises must effectively fulfill the main responsibility of epidemic prevention and control, unconditionally accept the competent authorities and the local government (management committee) random sampling supervision, such as concealment of the true situation to obtain the consent of the resumption of work and resume business, or in the resumption of work and resume business during the occurrence of an epidemic, shall be held liable according to law.

Fourth, if the higher level has new requirements on the resumption of work and business, the higher level requirements shall prevail.

How to write the notice of resumption of work under the epidemic Part 2

All employees:

In order to effectively fulfill the social responsibility, according to the requirements of the relevant departments of my unit has been to the jurisdiction of the epidemic prevention leadership office to apply for resumption of work and has been approved in order to actively restore the normal operation of my unit and the development of the unit leaders agreed to the study of the following arrangements:

First, the company is officially scheduled to 20xx year x month x resumption of work, resumption of work in the way to the post (online office) as the case may be.

Second, attendance requirements: after the resumption of work, to maintain the original attendance system with the unit synchronized work and rest time.

Third, employees around the resumption of work in a timely manner and the Ministry of Administration to report to the post time, has been prepared for the unit ready to accept the fourth: all employees need to do a good job after the resumption of work health testing and protective measures.

Conclusion: at this particular time, we all work together, united, *** through difficult times.

How to write a notice of resumption of work under the epidemic Part 3

Dear all employees of Jinkai: Hello everyone! Fortunately, the mountains and rivers are unharmed, and the wind and rain are standing, as Mr. Gao wished, after a great catastrophe of mankind, every one of us in Jinkai is still safe and smooth! Here, we would like to thank our great motherland and the thousands of medical workers who have been carrying the burden for us! After surviving the bitter cold winter and the cold spring New Year, we meet again in the sunny and poetic spring of 20xx! Counting up, this Spring Festival holiday should be the longest one we have ever spent since we started working, so long that we began to miss our work, miss our colleagues, and look forward to the end of the epidemic quickly, all of which quickly return to the peace of the past!

From the day of resumption of work back to work is getting closer and closer, and even some of our colleagues have returned to their jobs ahead of time, the epidemic situation seems to be more and more in the direction of the development of the good, the traffic, the prosperity of the scene still believe that soon we will be able to see again! So, back to work, we face the remaining days of 20xx, how to face the next work? Calculated that there are 24 days to the end of the first quarter of 20xx, we should be how to accelerate the goal of 20xx, the epidemic has undoubtedly brought to various industries, or large or small, or light or heavy blow, but the more the economic recession, the more the waves of sand, how to change the crisis into an opportunity, the epidemic actually left us what to think about? As the saying goes, sharpening the knife is not wrong, I think the above problems, smart Jinkai people should think clearly, the next 20xx road in order to walk a more determined pace, resounding!

The following points of advice, I hope to work with you ****:

First, 20xx year, with the idea to work.

Today's society, there is no job is stable, your so-called comfort zone, will only slowly "kill you", Darwin warned us: "in the jungle, the ultimate survival, often not the tallest, the strongest species, but the changes in the Can make the fastest response to changes in the species", the outbreak of the epidemic told us a truth: the master of this era is no longer a stifled effort, but can flexibly respond to the crisis, with independent thinking and creativity! 20xx, I hope that each of us can work with the idea of becoming a small universe to influence and infect the people around us at the same time, we will naturally become the center!

Two, penetrate the desire into the subconscious mind, do not have sentimental worries!

Remember the end of 20xx year in the company's year-end dinner activities, we are in the wishing bottle to put in the New Year's wishes, is related to the life of the work or not, it is always positive. Remember at the beginning of 20xx year store manager roadshow, we are full of confidence depicting the 20xx year to how how? At this moment, ask yourself, do you remember? Or have you already left it behind? If you remember, what efforts have we made for this?In 20xx, have your wishes (goals) penetrated into the subconscious mind? It was as skillful as eating and drinking without thinking. Do you still have the same confidence in that goal? Or do you still hesitate or wander because of this or that so-called emotional troubles. Here I would like to remind you that all success is inseparable from having an unswerving heart for the goal, as the saying goes, "Bite the green mountain and never let go", it will not sway with the wind, will not waver, will only be more clear after the storm, more determined!

Three, pay no less than anyone's efforts, the "impossible" into "possible"!

People themselves have a great potential to make their dreams come true! Some people say that everything is fate, but please believe that my fate is not determined by God! Recently, the hit drama "home" in the real estate agency store manager room like Jin in order to deal with a single, at the expense of a day to climb three consecutive trips to the 28th floor, hard to have fallen into the hands of others single snatched over, in her view, everything to fight for, become passive for the initiative, to pay no less than anyone else's efforts, it may be possible to turn the "impossible" into a "possible"! "Possible"! Don't think this is in the shooting TV, real life there is no shortage of such resilience, not to achieve the goal of the precious soul!

Admit it, life is never equal, how hard you have to work to be more special! I really hope that 20xx year will not be missing a month and did not reach our goal, and it is because of this missing month, we will cherish this work, like a "warrior" in general, more fighting spirit, more challenging, will 20xx year all the "impossible! "into a" possible "!

Go, brave Jinkai people!

Cherish the post!

Cherish life!

Cherish life!

Thankful to have you, dream along!

Finally, I would like to pay tribute to the prevention and control personnel who are fighting on the front line! To all employees to express condolences and blessings!

How to write a notice of resumption of work under the epidemic Part 4

All divisions belonging to the project department:

xx Spring Festival holiday has just passed, the management personnel of all divisions and operators have returned to the site one after another, the resumption of the project engineering is about to be fully carried out. The period of resumption of work after the holiday is the high incidence of production safety accidents, in order to further strengthen the safety production management of the project after the holiday resumption, to eliminate the winter weather and the Spring Festival shutdown period and other reasons for the construction site to bring the adverse effects and safety hazards, prevention of construction safety accidents, to ensure that the construction of production safety, is now put forward the following requirements:

a. Do a good job of resumption of the work of the safety management of the deployment

All the safety before

Strengthen the safety responsibility, carefully organized, with a highly responsible attitude to effectively do a good job before the resumption of the project engineering safety management preparations, always adhere to the "safety first, prevention first, comprehensive management" policy, resolutely overcome the blind, optimistic mood and laxity Paralysis, actively do a good job of education and publicity and mobilization, and further implementation of the production safety responsibility system, seriously carry out the resumption of work before the project safety education, briefing, inspection and so on, to adjust the state of mind of the management personnel and operators after the festival, for the project works after the festival resumption of work to lay a good foundation for the safety management work.

Second, solidly carry out the safety education and training work after the resumption of work after the festival

After the Spring Festival, the people are more impatient, easy to slacken and paralyze the mind, after the festival project works will be resumed one after another, the foreign workers will be a large number of people into the construction site, the new personnel and the transfer of personnel will be increased, the branches should attach great importance to the work and do a good job before the resumption of work`. Safety education and training work, for the actual construction site, the project management personnel, operators and special operators to carry out full safety education and training work, the strict implementation of the three-level safety education system, we must use the watching safety education cartoon, thematic safety education, amateur school, pre-shift meeting and other forms of safety education and training work to each team, each position, each operator The safety education and training work should be carried out to every team, every post and every operator, so that the new first-line operators or transferred operators after the resumption of work can have a comprehensive understanding of the project's hazardous places, sources of danger, precautionary measures, and basic safety operation procedures, and improve the awareness of safety precautions and operation skills of the site operators. After education, all personnel should be assessed for safety knowledge, and it is strictly prohibited to arrange for personnel without safety education and training or unqualified training and assessment to enter the construction site operations directly. At the same time, each division should be combined with the progress of the project, the training of the whole year to do a good job of planning arrangements, training schedule is attached.

Third, seriously carry out after the holiday resumption of the work of hidden security risks investigation and management

Each branch department to overcome paralysis, lax thinking, attaches great importance to the resumption of work after the Spring Festival safety production of hidden security risks investigation and management work, safety inspection should be led by the branch manager personally, in strict accordance with the relevant standards and specifications of their respective branch construction site to carry out a comprehensive and thorough, leave no stone unturned, and the work should be carried out in a way that is consistent with the safety standards and regulations of the construction site. Comprehensive and thorough, leaving no dead ends of the hidden danger of safety inspection and management activities; found that the hidden danger should be in accordance with the "fixed person, fixed time, fixed measures" to carry out rectification, the implementation of special tracking of hidden danger rectification situation, the inspection must be left to the inspection, rectification records, to ensure that the rate of rectification of hidden danger of safety up to 100%. Before resumption of work, especially to strengthen the danger of large sub-parts of the project safety hidden danger investigation:

(a) deep pit support and drainage measures, to carry out a comprehensive review of deep pit slope displacement, in all types of trench excavation should be strictly in accordance with the relevant technical specifications for the release of slopes, is strictly prohibited along the pit side of the unauthorized piling of soil;

(b) to strengthen the template of the full bracket support system, steel tube columns Support system inspection, especially to strengthen the load-bearing bracket, load-bearing columns built whether the norms and solidity of strict inspection, to send a special person on the template pole, columns at the bottom of the subsoil tamping, padding whether to meet the design requirements, the top bracket and bottom bracket there is no deviation, the top bracket screw extends the length of the verticality of the pole, sweeping rod and horizontal tie rods and diagonal support, scissor braces, fasteners, bolts, welds and other critical parts of the setup and fixation. etc. to carry out detailed inspection, found problems in a timely manner to strengthen the rectification, to ensure that the structure of the connection, rod fastening and frame foundation stability;

(c) the site of all the tower cranes, gantry cranes, crawler cranes, automobile cranes, large-scale equipment, construction machinery and vehicles and other special equipment and machinery and equipment inspection, to see the foundation of the lifting machinery whether there is settlement, whether the foot bolt is loose, the various security Insurance device is effective and normal, to strengthen the inspection, maintenance, testing and test run before resumption of work, only after passing the inspection can be put into use;

(d) scaffolding, ladders, holes, edge guardrails and other safety facilities of the solid situation, safety nets and scaffolding boards laying a careful inspection, especially to strengthen the site of the high-rise work platform edge protection to check the lack of safety facilities in the resumption of work! Before the repair should be set in place in a timely manner to ensure that all types of safety facilities on the construction site without defects and sensitive, reliable, solid, can play a corresponding role in safety protection;

(e) to strengthen the construction of electricity safety checks, focusing on checking the construction site of the pro-cable line is soaked in water, the line erection is in line with the requirements of whether or not the line is aging damage, leakage protector is not functioning, the distribution box and the switch box to meet the "three-phase, five-wire system", the power supply box and switch box to meet the "three-phase, five-wire system". "Three-phase five-wire system", "three-level power distribution, two-level protection" and "a machine, a gate, a box, a leakage" requirements, repeat the grounding device is standardized and reliable, etc., one by one to carry out a comprehensive inspection (F) strengthen fire safety management, should be construction sites, office areas, living areas and dormitories and other areas of electricity, fire, gas fire safety inspection, especially focusing on checking the electrical welding and cutting sites, flammable and explosive substances warehouse, oil depot and other Hazardous areas of the fire fighting facilities and measures are in place to ensure that all types of fire fighting equipment and facilities are complete and effective, the implementation of the fire safety responsibility system;

(VII) to strengthen the project of various types of construction facilities stability, solidity and safety inspections, focusing in particular on the activities of the boarding house, barbed wire scaffolding, material scaffolding, fences, fences, etc. Safety inspections one by one and found that the problem is rectified in a timely manner, to eliminate hidden security risks! )

(h) do a good job to keep the road safety inspection, especially the traffic guide to change parts, road maintenance, intersections, etc. to strengthen the site of the signs, signs and speed limits, isolation facilities and other safety facilities to check, timely damage to the signs, facilities for supplemental improvement;

(ix) do a good job of section assembled beam construction safety inspection, in particular, should be the beam, the gantry crane each connecting Bolt is intact, reliable connection; steel pipe support is intact, no obvious deformation; hanging fine-rolled rebar, double nut reinforcement, connector is intact, no damage; tensioning jack is effective, reliable; beam periphery and the lower part of the installation of protective facilities; operating platform is stable and reliable, no obvious deformation; the edge of the mouth of the safety protection is reliable; windproof cable installation is firm and reliable facilities, The company's main goal is to provide the best possible service to its customers, and to provide the best possible service to its customers.

Fourth, a clear division of responsibility for safety, signed the production safety responsibility

The division should be combined with the actual project, to further clarify the division of responsibility for safety, the implementation of the production safety responsibility system, by the division and into the field of each labor force signed the production safety responsibility, while the division manager should be signed with the project management personnel production safety responsibility, strengthen the safety responsibility assessment work, and effectively implement the safety responsibility system, the division and the labor force signed the production safety responsibility. Strengthen the safety production responsibility assessment work, and effectively strengthen the awareness of safety production responsibility.

Fifth, increase the supervision

Project Department of Safety and Quality Department will be the implementation of the safety of the work of the division before the resumption of work after the holidays to check, not implemented according to the project Department of Safety and Production Assessment Methods for the corresponding assessment.

The leadership of each division should attach great importance to the safety management of the production work before the resumption of work after the holiday, in order to resumption of work after the Spring Festival, this special time, the key nodes, led by the division manager, to organize and carry out a special inspection of safety work, do a good job of the safety management of the resumption of work after the holiday, to ensure that the resumption of work after the holiday of the various safety measures can be implemented in place. To resolutely stop not according to the requirements of the hidden danger investigation or hidden danger investigation is not in place, the main management personnel of the project is not on duty without authorization to start work, the operating personnel do not resume work safety education on the job and other illegal phenomena.

Please carefully implement the above requirements, and do a good job before the resumption of work safety management, hidden danger inspection, safety training and education, safety responsibility signed and xx year training program on February 22nd to report to the project department of safety and quality department.

How to write a notice of resumption of work under the epidemic Part 5

Departments, sub (sub) companies and directly under the unit:

To do a good job in all departments, sub (sub) companies and directly under the unit to return to work after the epidemic prevention and control work, to reduce the number of people gathered to block the spread of the epidemic, to ensure the safe and stable operation of water supply and drainage work to protect the health of the workers, it is now notified as follows:

A good job. Return to work. Starting from x month xx, from the field back to Qing, their own home isolation 14 days, resolutely can not go out, isolation period expired symptom-free before being arranged to go to work; fever, cough and other cold symptoms should also be home isolation to the healing before being arranged to go to work. At the same time, the above situation should be strictly on time to report the information of those who left the post.

Second, the implementation of prevention and control measures. To arrange a person responsible for the daily return to work before the staff temperature test, in the post staff are correctly wearing masks, try to maintain a safe distance of more than 1.5 meters from others, meet not shake hands to avoid close contact. To strengthen the office health environment cleaning cleaning, the unit office area encrypted elimination, scientific and standardized disposal of waste masks, to create a clean, healthy, safe working environment.

Third, dining travel arrangements. Epidemic prevention and control period, dining to take a meal system, encourage their own lunch boxes, take turns playing meals, to maintain a safe distance. Encourage walking to work, reasonable use of private cars, avoid taking public **** traffic, minimize official car travel.

This notice shall come into force on the date of publication and the date of lifting shall be announced.

xxx Group Limited

20xx x month x day

How to write the notice of resumption of work under the epidemic Part 6

Hand in hand Dear colleagues: Affected by the new coronavirus-infected pneumonia epidemic, the resumption of production and return to work of enterprises has been delayed. According to the State Council and the government's arrangements for the resumption of production and return to work, the company will resume work on the date set for xx, xx, 20xx.

Hand in Hand

Dear Colleagues:

The resumption of production and work has been delayed in various enterprises due to the impact of the new coronavirus-infected pneumonia epidemic. According to the arrangement of the State Council and the government on the resumption of production and work, the company has set the date of resumption of work as March XX, 20xx, so please arrive at work on time for all colleagues. For the sake of epidemic prevention and control, please wear masks when you return to work.

Colleagues with the following conditions are required to observe at home for 14 days on their own after returning to Guangzhou, so please make arrangements in advance:

1. Visiting relatives or traveling to XX;

2. Existing close contact with XX personnel;

3, Passing through xx, or having stayed in xx.

Colleagues who are under observation at home or have fever, dry cough and other suspected symptoms, and are unable to return to work on the above dates, please communicate with the company's personnel in advance, and the company will deal with you in consultation. Hereby notify

how to write a notice of resumption of work under the epidemic Part 7

Combined with the city's actuality, the first organization to prevent the area of the enterprise to resume work and employees to return to work, to be controlled area, sealing and control of the area to be unsealed, in accordance with the relevant provisions of the municipal command, and then the organization of the control area, sealing and control of the area of the enterprise resumption of work and production. Specific notice is as follows:

1, the strict implementation of epidemic prevention and control of local responsibility and the main responsibility of the enterprise, to do regular nucleic acid testing, employee health management, protective measures, emergency supplies, epidemic prevention knowledge training "five in place", a sound information **** enjoy, consulting research and judgment, joint prevention and joint control mechanism, and effectively safeguard the health of the workers! The company's business is also a major player in the industry, and the company's business has been a major player in the industry.

2, the strict implementation of the epidemic prevention and control provisions and classification and control requirements, the enterprises must strictly implement the provisions of the municipal command, in accordance with the precautionary area and outside the area of the classification of personnel registers, carefully verify the information of the resumption of work, the town (street), the development zone should be compared with the partition, strict control to ensure that the information is accurate. To implement the "one enterprise one policy" "one factory one case" differentiated prevention and control measures.

3, the resumption of production enterprises should be compared to the "enterprise resumption of production epidemic prevention and control work guide", seriously do a good job before the resumption of work to prepare for the implementation of the resumption of work after the epidemic prevention and control work requirements. In accordance with the city coordinated epidemic prevention and control and economic operation of the leadership to the group (command) of the relevant provisions and arrangements for nucleic acid testing, registration, and to the xx city industrial enterprise epidemic prevention and control and resumption of work and production group to report on the test.

4, the strict implementation of the production safety responsibility system, to ensure that the enterprise resumption of work and resumption of production work safety and smooth progress.

How to write a notice of resumption of work under the epidemic Part 8

Now do a good job of prevention and control of the epidemic during the county's industrial enterprises to resume work, the following notice:

1, the enterprise should do a good job of daily health monitoring of employees. Designated personnel to implement the daily temperature monitoring of all employees, no less than two times a day.

2, enterprises should do a good job of management of employees on their way to and from work. The workplace, the factory dormitory on the staff to work on the implementation of closed management, all access to the personnel must wear masks, body temperature abnormalities without checking the exclusion of infection shall not enter. Requirements for fixed commuting routes, wearing masks and minimizing the time spent outside.

3, the enterprise to do a good job on the arrangement of workers. Before the lifting of the epidemic, enterprises in principle

on the recruitment of new workers. If you have to recruit, all do not get the key areas of the epidemic to carry out recruitment activities, all are not allowed from the key areas of the epidemic to recruit new workers, in other areas to recruit new workers must be strictly examined.

4, the enterprise to reduce the number of personnel sent on business trips, shall not arrange for employees to the key areas of the epidemic on business trips, but also can not accept the key infected areas of the people to visit. Indeed, because of the work needs of special personnel visits, enterprises should be strictly in accordance with the isolation of medical observation methods to implement medical observation, to be lifted after the observation, before entering.

How to write the notice of resumption of work under the epidemic Part 9

All staff:

At present, the epidemic of the new coronavirus pneumonia is very serious, from the official announcement of the diagnosed cases, there is no significant downward trend, is still at a high level of haiku, and so far there is no specific drug can be treated, the epidemic prevention and control tasks are very difficult, all over the world, each region is to increase the control of the people in and out of the isolated Observation. In view of the above, in order to protect the health of the company's employees, not due to the collective work caused by cross-infection, after the study, the epidemic during the work of the following adjustments.

First, the original February 10th official work, changed to February 10th home office.

Second, the home office time is tentatively set for February 10 to February 20 (10 days).

Third, during the home office, employees to do qq online, nail online, WeChat online, cell phone smooth, so that the department manager, the company set up the work. If there is no work matters when the home self-study, the provincial costing association is organizing free learning opportunities. (Has been isolated by other areas may not enter and exit, the employee to the department manager, the administrative office to inform the situation in writing to qq or nail way to transmit to the office xxx).

Fourth, during the home office, due to the urgent need for work or software Internet, must temporarily go to the company, under the premise of ensuring that there is no cross-infection, each office up to one person to go to the office, you must wear a mask. If an employee to go to the office, the employee to apply for prior consent of the department manager, and does not occur at the same time two people in the office, may not guest department chat.

Fifth, the company's administrative office to implement every other day duty system, every other day duty time for 2:00 pm to 4:00 pm, in order to meet the urgent matters for the use of the official seal needs.

Sixth, the period belonging to the local government or community has special provisions, according to the provisions of the implementation. The company has set up a nail group where employees need to report their health status on a daily basis.

VIII, the company set up "xx epidemic prevention and control office", by the company's administrative leadership, party branch secretary, trade union chairman, composed of the following members: Hua xx, Du xx, Pan xx, Zhang xx, Zhang xx, Xu xx, Zhu xx, Zhu xx, Lin x.

Hereby notify