Acceptance report of equipment sample article 1
Equipment unpacking acceptance records
Xxxxxx unit October 2011
I. Appearance Inspection
1. equipment and packaging to take pictures of the record, to check the equipment's packaging is intact, there is no breakage, soaking, moisture, deformation, etc., and check the surface of the outer box and the state of encapsulation;
2. Packaging state to check;
2. Check the surface of the equipment and accessories with or without damage, corrosion, bruises, etc., focusing on the inspection of the rotor impeller with or without damage, the main components and the main working surface;
3. If you find that there is damage to the packaging, equipment and accessories have damage, corrosion, signs of use, etc., you should make a detailed record and focus on the photographs to stay in the evidence, and timely return, claim formalities with the supplier. Returns, claims procedures.
Second, the number of inspections
1. Quantity inspection should be based on the supply contract and packing list, check the host, accessories and other equipment specifications, models, configurations and quantities, and piece-by-piece inventory check;
2. Carefully check the completeness of the randomized data, such as the instructions, the product inspection certificates, warranty, etc.;
3. Serial number and factory number, if necessary, you can check online; 4. carefully make a good open inventory records, write the location, time, participants, box number, product name, should be and the number of real, such as shortages found, wrong issue and other issues, we must promptly make a record and retain the relevant materials.
Third, fill in the acceptance record sheet
1. Box acceptance is completed, found that any one does not meet the requirements of the contract documents, must be recognized by the supplier's representative (signature, seal).
2. Write a record sheet of equipment unboxing inspection, serial number and factory number, field photos as part of the equipment acceptance documents.
Equipment Unpacking and Acceptance Record Sheet
No.:
Acceptance Report of Equipment Essay 2Equipment Name Laboratory Equipment, Teaching Instruments and Equipment Specifications, Models Use of units *************************** Acceptance of the person in charge of the acceptance of the
Month and year
Equipment Acceptance Report
Equipment Name Specification Model Supplier Purchasing Method Arrival Date Quality Guarantee Period Price Government Procurement 2011 4 Years ¥288000.00 RMB288000.00 List of Equipment (or Attachment) Serial No. 1
Projector
Training and Teaching Equipment Batch
Brand of Equipment Quantity Purchaser Purchase Number PZC2011- 1749AgPZC2011-1749Ag-19727 Year Month Day Batch
Month Day
Installation Date
Equipment Name
Model Specification
NP-M260XS+ DB-85INS-Y01
Quantity 10 10
Remarks
2 Interactive Whiteboard
3 Push-Pull Combination Dust-free Blackboard
4 m x 1.3 m x 0.1 m Push-Pull AverVision CP150
10
4 Physical Booth
10 10 10 10 10 8 10
5 Infrared Wireless Microphone
WX-LT310 WX-LT310/CH WX-LP100/CH Infrared Wireless Power Speaker HP 3005 Computer 1.2m*0.65m*1.0m Multimedia Desk National Standard Wire and other materials
6 7 8 9
Acceptance Information Data Data Name Technical Specification Factory Certificate of Conformity No. of Copies 1 1 1 Data Name Product Experimentation Report Sheet Operation and Maintenance Manual Packing List Quality Guarantee No. of Copies 1 and other conditions)
3) according to the contract and packing list count all the items whether the waiver is consistent?
4) quality, performance acceptance 1 installation and testing conditions 2 indicators and parameters of acceptance acceptance acceptance of the project instructions or the contract specification indicators actual test indicators Remarks
5) acceptance of the results
Responsible for the signature: equipment to participate in the acceptance of the person to sign the use of the signed unit signatures word equipment ( (equipment)) signed the year signed the year signed the year
year month month month
year month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month day
>>> Next page more wonderful "equipment inspection report model"