Foshan Sanshui Hengyi Power Plant's "Large and Small" 2×600MW Supercritical Coal-fired Generator Unit Project Procurement-Construction General Contracting Tender Announcement Publisher: admin Release time: 2009-4-4 Read : 186 times Foshan Sanshui Hengyi Power Plant's "Large Large and Small" 2×600MW Supercritical Coal-fired Generator Unit Project Procurement-Construction General Contracting Tender Announcement
2009-03-31
< p>Region: GuangdongDetails: Contact person: Ma Li Li Xiang
Telephone: 15801469211 010-63849116
Foshan Sanshui Hengyi Power Plant" "2×600MW Supercritical Coal-fired Generator Unit Project Procurement-Construction General Contracting Tender Announcement
2009-03-31
Region: Guangdong
< p>Details: Contact person: Mali LixiangTelephone: 15801469211 010-63849116
Fax: 010-63849116 010-88205605
E-mail: malizb@ yahoo.com.cn or lixiang182008@163.com
1. Foshan Sanshui Hengyi Power Plant’s “Large Large and Small” 2×600MW Supercritical Coal-fired Generator Unit Project Procurement—Construction General Contracting, Construction has been approved
, construction funds have been secured, and preliminary work has been basically completed. It is now decided to conduct public bidding for the construction of this project and select the winning bidder.
2. The overview of this bidding project is as follows:
(1) Bidding unit: Foshan Sanshui Hengyi Thermal Power Plant Co., Ltd.;
(2) Project name: Foshan Sanshui Hengyi Power Plant "Large and Small" 2×600MW supercritical coal-fired generating unit project procurement - general construction contracting
(3) Project scale: 2×600MW Supercritical coal-fired power generation unit project;
(4) Bidding scope: The bidding scope of this project is the "big one and small one" 2×600MW supercritical coal-fired power generation unit project of Sanshui Hengyi Power Plant in Foshan City< /p>
Procurement - general construction contracting, the scope of work includes (including but not limited to): In addition to the following projects separately purchased (tendered) by the contractor, piles for the newly built unit factory area Construction projects such as foundation, construction, formal guard room and fence of the factory area, installation, decoration, greening, fire protection, desulfurization EPC, projects related to the power grid company, and construction inspection and inspection by the general contractor , all equipment and material procurement, loading, unloading and storage (including the equipment purchased by the contractor
), all commissioning projects, as well as project management, design drawings expediting, host equipment expediting, construction preparation, unit
p>
168 hours of trial operation, performance test cooperation, equipment training (domestic and foreign), technical services, completion acceptance, compliance with standards and production, warranty period
Warranty and completion of repairs for any reason due to the general contractor and defects caused by liability, etc.
The projects separately purchased (tendered) by the contractor include engineering design (excluding desulfurization), temporary construction power supply and site line relocation, construction land
Site leveling, soft foundation treatment (strong ramming), test pile construction and inspection, equipment supervision, construction supervision, engineering pile inspection, performance test, engineering quality and safety supervision, procurement of three major hosts, procurement of wastewater evaporation and drying system equipment, laboratory Equipment procurement, MIS system, SIS system, access control
Patrol system, simulator system, dock engineering, etc. are not included in the general contracting scope (for specific work scope, please refer to Chapter 3 Contract Annex 1 "Work Scope"
p>Area and interface").
(5) Construction period requirements: From the start date indicated in the construction start notice issued by the contractor, the #1 unit is locked to obtain the unit transfer certificate before June 30, 2011.
Unit #2 is locked to obtain the unit handover certificate before September 30, 2011.
(6) Funding sources and implementation status: This project is funded and constructed by Foshan Sanshui Hengyi Thermal Power Plant Co., Ltd., and the funds have been secured;
(7) Project construction location : Shixiangang, Baini Town, Sanshui District, Foshan City, Guangdong Province.
3. The tenderer adopts public bidding procedures. Any construction enterprise that has the ability to undertake the project and meets the prescribed qualifications may apply to the tenderer to bid for the above-mentioned construction bidding contents without quota restrictions.
4. Qualification conditions for bidders:
(1) The bidder has independent legal person qualifications and general taxpayer qualifications, and the paid-in capital or equity of the enterprise is not less than 500 million yuan. (All parties to the consortium may
total), and the net assets of the enterprise as of the end of 2007 shall not be less than 2 billion yuan (based on the amount in the annual accounting firm audit report, the joint venture
< p>Parties can total);(2). A single bidder or the leader of a bidding consortium has the first-level or above qualification for general contracting of electric power engineering construction issued by the Ministry of Construction; bidding
Other members of the consortium have first-level qualifications or above for general contracting of electric power engineering construction issued by the Ministry of Construction, or first-level qualifications for professional contracting of thermal power equipment installation projects
or general contracting for housing construction projects First-class qualification or above, or Class A qualification for engineering design in the power industry; a single bidder
or all parties in the bidding consortium must pass ISO9001 quality management system certification, ISO14001 environmental management system certification, and GB/T28001 occupational health
Safety management system certification or occupational safety and health management system (OSHMS) certification;
(3). A single bidder or the leader of a bidding consortium has a 600MW or above class that has been put into production Performance of EPC general contracting for coal-fired power generation unit projects
(4). A single bidder or a bidding consortium has not been ordered to suspend business or become bankrupt, and its assets have not been reorganized, taken over or frozen
(5) Requirements for the project leader: a first-class registered construction engineer in electric power engineering or related majors, possessing a safety production assessment certificate (B certificate),
Having worked as a construction engineer that has been put into production or is under construction The person in charge of the EPC general contracting of the 600MW or above coal-fired power generation unit project.
No more than three units with independent legal person qualifications may be allowed to form a bidding consortium, and a joint bidding agreement shall be attached to specify the leading party.
The members of the consortium shall bear joint and several liability for all matters involved in this bidding and the general contracting of the project if the bid is won.
5. The bidding applicant shall bring a copy of the business license (for all parties in the consortium), a copy of the qualification certificate (for all parties in the consortium), and a copy of the safety
production license ( Copies of all parties to the consortium), the original of the consortium agreement, and copies of relevant certificates of the project leader. The copies must be stamped with the official seal. From 15:00 on March 31, 2009 to April 8, 2009 Register at 11:00 on the same day (Beijing time, except holidays)
Participate in bidding.
6. This project uses pre-qualification. The tenderer will set up a pre-qualification review team to review the qualifications of the bidders. Applicants who pass the pre-qualification
If there are more than 5 applicants in the preliminary review, , and no more than 9 companies (including 9 companies), then all applicants who have passed the preliminary pre-qualification review can bid: If there are more than 9 applicants who have passed the preliminary pre-qualification review, then The pre-qualification group will vote and decide, and those who get more than half of the votes will be formal bidders (more than 9); when the number of pre-qualified bidders is less than 5, they will be submitted to the original project for approval. After approval by the department, a new bidding process will be organized.
7. Bidders who have passed the pre-qualification and are invited to bid shall obtain the bidding documents and related information according to the time, place and method specified in the pre-qualification notice. , the bidding document fee is RMB 500 per set, non-refundable after sale; the drawing deposit is RMB 1,000.
The bidder can become an official bidder only after obtaining the bidding documents and paying the above fees.
Contact address: 7th Floor, Bisen Building, Fushi Road, Haidian District, Beijing
Contact person: Ma Li Li Xiang
Tel: 15801469211 010-63849116
p>
Fax: 010-63849116 010-88205605
E-mail: malizb@yahoo.com.cn or lixiang182008@163.com