Topic reading recommendation: 'Mechanical Work Plan'.
Before we bury our heads in the sand, with the next phase of work began we need to start making a work plan. Developing a good work plan is one of the conditions necessary for success, so how do we improve the work plan has been written? I especially my "mechanical work plan example", please read, may help you!
Mechanical work plan model article 1Since 20XX xx month was named assistant engineer, I am politically active in the demand for progress, work on the business dutifully completed the work, especially after five years of practical exercise in the project, their own level of business has improved greatly, in the process of project supervision, pay close attention to the quality of project management, and actively participate in the project's safety management and supervision of the data collection and management. In the process of project supervision, he pays close attention to project quality management, actively participates in project safety management and supervision data collection and management. From all aspects of different angles to improve their management and technical level.
In the project supervision period involved in the construction project of all engineering drawings review, the project's construction organization design and a variety of safety program review, project supervision data collection and archiving, with the leadership of the project to solve the technical problems, etc.. Both from the theory and practice have greatly improved their own business level.
Through the practical exercise of the above projects, the supervision and management of engineering construction has a further understanding of the following I will talk about the above projects personal work plan.
First, from the project just started, I first carefully familiarize myself with the construction drawings, with the construction unit, design units, construction units, together with the drawing review, and put forward the construction of the need to consult with the design of the problem, for future construction supervision laid the foundation.
Second, strengthen the management of project supervision information, supervision of the quality of good and bad, supervision information is also critical, in the supervision of the collection and organization of information in a timely manner, effective, traceable, and requires that the information must be complete, organized and stored in an orderly manner, for the quality of the project to provide the necessary technical basis.
Third, strengthen the contact with the relevant units to improve their overall quality. As the work of construction supervision involves construction units, construction units, design units, the city quality supervision station, the city safety supervision station and other units, in order to do a good job in order to supervise the work, we must deal with the relationship between the various aspects of the contact with the units in accordance with the professional ethics, in order to communicate with all parties with a modest and cautious attitude, and get the support of all parties, but also to improve my personal ability to deal with the situation.
In order to improve their business level, in recent years, I actively participate in various types of learning and training, such as supervision engineer training, superintendent engineer training, witness sampling training and the end of the company to organize a variety of training, the assessment is excellent, and lay a good foundation for future work.
In the first half of the year, through the exercise of construction supervision in the field, I from all aspects of strict requirements for themselves, learning with an open mind, hard work, hard work and study business knowledge, so that their comprehensive quality has been improved, for the better work in the future to lay a good foundation.
Mechanical work plan essay 2On the second half of my 20XX mechanical work plan is as follows:
With the development and expansion of the scale of highway construction, the degree of mechanization of engineering construction has become the key to ensure that the project and the progress, while the number of mechanical equipment and technology content has increased a lot, which gives the management of the machine put forward new requirements. In recent years, I correctly selected the machinery itself the law of operation and the law of the market economy, combined with the actual situation of the unit, carried out a serious exploration and practice, from only focus on the technical management of equipment, physical form management to the ideology of the value of the form and the physical form of the combination of the management mode conversion to economic efficiency, work efficiency as the center for the purpose of improving the unit's economic efficiency services. In line with the objective management of good, micro-activation of the principle, the formation of a set of use, maintenance, repair, as one of the new system.
First, the purchase of equipment
In recent years, with the increase in the degree of mechanization of engineering construction, the acquisition of equipment has also put forward higher requirements, in the process of the purchase of equipment, I follow the principle of two aspects: First, the purchase of equipment before the necessary technical and economic demonstration, fully understand the mechanical properties of the equipment, Reliability, output, production capacity and scope of application of the project, combined with the market situation and the actual situation of the unit, to examine the necessity of the acquisition of equipment, predict the recovery time, as well as the economic benefits brought about by it; grasp the different offers of the same type of equipment, comparison of three, so that reasonable. Secondly, when purchasing equipment, we fully consider the production situation and equipment development. For example, when I purchased stabilized soil mixing equipment in XX year, according to the needs of the project at that time, I purchased the plant mixing equipment with hourly output of 300 tons of volumetric weighing to satisfy the requirements of use. However, I took into consideration that the future construction of high-grade highway would have more and more high requirements for the output and quality of the plant mixing equipment and, therefore, I proposed to purchase the most computerized measuring WCQ500 roadbed material mixing station at that time, which could satisfy the requirements of the high grade highway for material weighing, material grading and quality of material. Therefore, it was recommended to purchase the then most computerized weighing WCQ500 roadbed material mixing plant, which could meet the requirements of future high grade highways for material weighing, material grading and output. At present, the total value of our machinery and equipment assets has reached more than 40 million yuan, which is more than 30 times of that of 10 years ago, and the supporting system is complete with advanced performance, which has fully equipped with the ability to undertake the construction of high-grade highways. Over the past few years, I participated in hosting the unit of all large-scale machinery and equipment inspection, selection, purchase, installation and commissioning work, and a trial success rate of 100%.
The use of equipment
The correct and reasonable use of machinery and equipment is the main content of the work, it is not only the completion of the mechanized construction tasks to ensure that it is not only to reduce the wear and tear of machinery to extend the service life of machinery, reduce the cost of machinery operation and maintenance costs, and to improve the economic efficiency of the key. In the use of management, I adhere to the principle of man-machine fixed to do; three fixed that is, fixed people, fixed machine, fixed job responsibility system, a machine of large-scale machinery, the implementation of the system of responsibility of the captain. Requirements for machinery operators to do four understand the machinery: understand the structure, understand the performance, understand the principle, understand the use, three will: will operate, will maintain, will remove general faults. Operation of machinery to do four no: no over-temperature, no over-pressure, no over-speed, no overload. At the same time, the construction site machinery for dynamic monitoring, maintenance. Requirements for operators must follow the command of the constructor, correct operation, use in accordance with regulations, respect for science, give full play to the effectiveness of machinery, to ensure the quality of work, and good construction with the construction of the construction personnel in violation of safety regulations and may cause dangerous accidents in the command, the operator has the right to refuse. Requirements for mechanical personnel four to the field, namely, mechanical management to the field, mechanical inspection to the field, mechanical work coordination to the field, mechanical failure handling to the field, so that the mechanical management of horizontal to the edge, vertical to the end. At the same time, the implementation of the machinery supervision system, machinery supervisors in-depth construction site, supervise the operation, repair personnel to correctly use, maintenance and repair of machinery and equipment. This ensures the correct and reasonable use of machinery and guarantees the quality of construction.
While doing a good job in the technical management of equipment, strengthen the economic management of equipment, adhere to the economic benefits of equipment management as the center, to the overall efficiency rate as the highest goal. Mechanical team to implement independent, self-financing, according to the value of the equipment owned by the value of assets, the development of the annual contribution amount. The machinery team carries out the single-machine, single-vehicle accounting system, taking cost, workload, machinery technical condition and surplus amount as the main assessment indexes, which is directly linked to the salary distribution, and implements the structural salary system based on the pay for the work done. Single-engine single-vehicle economic accounting, to overcome the overall economic accounting of small units appear in the machinery revenue and expenditure imbalance, the responsibility of the door, the performance of the many drawbacks, so that each machine's income and expenditure of the breakdown, and as a measure of economic efficiency, the assessment of the driving operator's work performance. Through the implementation of single machine single car accounting, give full play to the talent, technology, management expertise, improve the utilization of equipment, mobilize the enthusiasm of driving operators, encourage operators to multi-talented, excellence.
In accordance with the principle of internal primary, external secondary, first internal and then external, internal and external differences, the establishment of an internal leasing system and external leasing system, and actively explore the internal and external markets, to ensure that the internal construction tasks under the premise of the active leasing of equipment to the outside world, and come out of a rent to raise the machine, rely on the machine to generate profits of the new way. According to the actual situation of the unit, I searched for the relevant regulations, formulated the "internal unit cost quota", "external leasing unit cost quota", "Rent Rules", "Leasing Management Rules", etc., and drew the dynamic distribution map of the equipment leasing, leasing economic distribution map. For the longer lease period to give certain concessions, and with the market to adjust the lease in a timely manner, so that they are invincible. In recent years, the Bureau's equipment utilization rate are maintained at more than 65%, more than 90% of the effective utilization rate of equipment, foreign leasing cumulative income of more than 400 million yuan.
Three, equipment maintenance, repair and transformation
Do a good job of maintenance, repair work is to extend the service life of machinery key. I realized in practice, the traditional regular maintenance, mandatory repair system has great shortcomings, focusing on the economic effects of not paying attention to routine maintenance and repair, so, actively explore new warranty model, and gradually establish a state monitoring, mandatory maintenance, depending on the repair of the new model. The daily maintenance work before, during and after the shift has been strengthened, the reward and punishment system for daily maintenance status has been implemented, and the equipment maintenance personnel have implemented the piece-rate wage system and the maintenance quality responsibility system. Regularly organize personnel to monitor the status of the equipment and repair as appropriate. And actively explore new maintenance methods, such as: a T-230 bulldozer purchased in XX years using Cummins NT-855 engine cylinder liner, every six months to be replaced due to cavitation, I advocate the use of parts transposition method, in the cylinder liner running for some time after the rotation of 90 °; re-installation, effectively prolonging the service life. After the adoption of the new warranty model, our annual maintenance costs reduced by 15% -45%, the failure rate reduced by 65%, greatly improving the rate of mechanical integrity, extending the service life of machinery. During this time, I **** presided over or guided the overhaul of equipment more than 20 times, of which the larger technical transformation 4 times.
First, the xx production of asphalt mixture mixer dust and combustion part of the renovation, in the cyclone dust on the basis of manufacturing and installing a water dust removal system, burning diesel oil for the burning of heavy oil, not only saves the cost of fuel consumption, but also solved the problem of dust pollution of the environment, if calculated according to the utilization rate of 60%, a year of savings of 5-6 million yuan.
Secondly, in xx years, the city highway department eliminated nearly 10 years of xx production 14/16 tons of road roller repair and transformation, change the joystick steering for the steering wheel type steering, change the mechanical steering manipulation for the hydraulic steering manipulation, saving money 18,000 yuan, so far the use of good, get the city highway department and the original manufacturer's high evaluation.
Third, in xx participated in the Parker-M356 asphalt mixer metering system transformation test. The number is led directly from the circuit after the signal amplifier and then through the proportional circuit into the PLC (programmable controller). This allows the hardware to be easily used to adjust the number-to-analog ratio. The system was modified to be able to categorize and store the various aggregate, asphalt and powder mixes for each pot of material. When there is waste material, it can automatically alarm. Prevent the waste material from entering the finished product warehouse, to ensure the quality of the material. The system is currently running in good condition.
Fourthly, in xx year, the WCQ200 stabilized soil plant mixing equipment produced by xx construction machinery factory was renovated, the mixing pot motor was increased, the material supply system was modified, the supply of aggregates was increased, so that the output of the equipment was increased from 200t/h to 300t/h, and at the same time, the measurement of powder was changed to a spiral weighing weighing method, and it directly enters into the mixing pot, so that the measurement is more accurate, so that the equipment is allowed to be used in the graded highway. In the grade of highway allowed to use, received a good economic benefits.
Four, mechanical statistics
Mechanical statistics from mechanical equipment to the end of the equipment life cycle throughout the entire process of recording. In the work of the collection of a variety of original, good equipment, accounting card work, equipment handover, use, maintenance and repair records, large and medium repair records, depreciation records, tire replacement, mechanical operation records, etc. complete and complete, statistical accounts so that we have mastered all the management and use of machinery and equipment for the assessment of the technical performance of machinery and equipment and provide a basis for the benefits. Through the generalization, analysis and collection of data, timely detection of problems and deficiencies in equipment management, to provide a scientific basis for management decisions. Thus improving the completion rate and utilization rate of mechanical equipment, and thus improve the investment efficiency of mechanical equipment.
Mechanical work plan sample article 3Internship Summary
Light and shade, years and months like a shuttle, turn of the eye has come to the axle factory for a month, looking back on this month, a lot of harvest, understand the importance of the theory of contact with the practical, and understand the benefits of good and effective communication in the work. Know their own shortcomings, to determine the direction of progress. These are inseparable from the leadership of the wise teachings and workers masters of the patient answer.
In this month's time, first of all, I basically understand the main production tasks of the assembly plant and the situation of the four assembly lines. Among them, N line is the oldest production line in the assembly plant, but it is also the line with the heaviest production task. It is mainly responsible for the assembly of N, K, N9003360, 4750 and other front axles. Assembly requires skillful operation and strict quality assurance. Through the communication with the masters, and process documents, I am basically familiar with the N line of various products parts and assembly process.
T line is a new line, is due to the development of new products and put into a new product assembly line, its production products include N350SUV4X2, N350SUV4X4, N350PK4X2, TRF, etc., and its high degree of mechanization, greatly improving the production efficiency, reduce the staff's labor intensity, and product quality is more stable. However, if a problem occurs with a piece of equipment, it will cause the line to stop production, so that the latter process can only wait, resulting in a great waste, so we should strengthen the promotion of TPM, better implementation of JPS lean production.
In addition, there are two manual assembly lines in the assembly shop, which are mainly responsible for the assembly of T4X2 front suspension assembly and the front hub assembly of single and dual tires for Transit, in these two lines, the employees play a leading role, and the employees give full play to their initiative and mobility, which is very good to improve the efficiency. Finally, I also learned about the cleaning and flaw detection line, which is mainly responsible for the flaw detection of steering knuckle, bent arm, main pin, front axle and other parts. Through director Tao's explanation and my own observation, I familiarized with the working principle of flaw detection, as well as the cleaning fluid ratio, temperature and other factors on the impact of flaw detection.
By familiarizing myself with the process in the workshop, and with the help of Yang, I have completed the statistics of quick switching of tooling in the assembly workshop, digitized the time of changing tooling and filed the record to provide data support for productivity improvement. In addition, I check the site 5s, QPS card, equipment point check list, etc. every day to standardize the process and promote the concept of jps lean production.
I need to understand and learn a lot of things, just one month's time to let me have a preliminary understanding of the process and production, in addition, through and Cao factory director, Tao director, and the masters of the communication, so that I have a lot of harvest, a lot of enlightenment, and clear the direction of their efforts. Mainly have the following insights: 1 do things on the ground, seriously do a good job, to have the spirit of hard-working and perseverance, especially we are engaged in technical work, to use a rigorous attitude to their work, I just came out of the school, everything is from scratch, humbly to my masters to ask for advice, and then combined with their own theories, ask more questions, see more, find problems, analyze the problem, and finally solve the problem.
2 attention to good communication between people, now engaged in any work, we are talking about a team, a person's power is limited, through teamwork, good communication between departments and workshops, can be more effective and faster to solve problems.
3 to do things can not be blindly imaginary, subjective, found that the problem is the same, through the support of data, rational analysis, through the phenomenon, see the essence of the problem to find out the root cause of the problem, and then think of ways to solve it, which solve the problem need to take into account the actual situation of the scene, in the conditions of existing resources, to come up with a reasonable solution, and also to follow up, summarize! The first step is to find a solution to the problem, and then to find a way to solve it.
I know I still have a lot of shortcomings, a lot of places to learn, only to enrich themselves, with a high degree of enthusiasm into the work, I can be qualified for future positions. Finally, I would like to thank the leadership of the factory, the director of the workshop to provide me with the opportunity to learn, exercise, and all the people who have helped me, my growth can not be separated from your help.
xx September 20
Mechanical work plan essay 4Looking back on the past six months of work, the first half of the year is both busy and fulfilling half a year, in the school textbooks learned to know are theoretical knowledge, and now work a little bit of accumulated practical experience is my life to enjoy the treasure. In this year, there are difficulties and gains, the result of serious work, is the completion of personal responsibility, but also to strengthen their own capacity. This next year's work is briefly planned as follows:
First, political, ideological
I am in a strong sense of ownership, at any time to pay attention to the development of electric xx company, think of the xx company, the project department and the interests of the test room, firm xx company will continue to develop, grow stronger, the xx company's future is full of enthusiasm and expectations. Although I have not yet joined the Chinese **** production party, but I will also be strict with the standards of party members, consciously accept the supervision and help of party members and colleagues, and persistently overcome their shortcomings, make up for their own shortcomings, and strive to withstand the test of the long years to come, and join the great Chinese **** production party as soon as possible.
I start from doing my job and daily work, start from me, start from now, start from the small things around me and perseverance, dedication in this job, tireless to make achievements, I want to constantly improve their job skills, and strive to be proficient in this job job knowledge, to do the work of the backbone and connoisseur, down-to-earth and do a good job in this job.
Second, the work attitude
Whether in work or life, I have always believed that a plow, a harvest, so I have been working hard, and constantly strive to learn, and constantly work hard. Love their own work can correctly and seriously treat every job, work input, on-time attendance, effective use of working time, stick to the post. Tight schedule, fewer people, a lot of tasks, can do to follow the work, to ensure the completion of the inspection task on time, to ensure that the project inspection smooth, showing that our test personnel strong sense of responsibility, carry forward the continuous work of our test personnel, the spirit of hard work and endurance.
Three, job responsibilities
seriously implement the national standardization, quality management system, product quality supervision and inspection, as well as research and development policies; indeed, the implementation of this post is responsible for the supervision and testing of engineering products, standards, test methods and relevant regulations, to do every test are based on the law. Do a good job of commissioned single acceptance, project inspection, information, feedback and other work, do a good job of tracking accounts for future reference. Due to the test and inspection projects, project inspection time varies, in advance to do the work, to avoid the construction unit technicians do not understand the project inspection requirements and technical indicators and delays in the work schedule, affecting the progress. Our laboratory personnel adhere to the four basic principles, implement the quality policy, the implementation of quality objectives, comply with the rules and regulations, wholeheartedly serve the construction site.
Fourth, the specific work
I am engaged in the work is mainly on some of the project civil construction materials (cement, sand, gravel, steel, bricks, etc.) and finished products (reinforcing bar weldments, concrete test blocks, etc.) for testing, inspection; participation in the concrete proportion of the pilot test; the concrete mixing station to supervise the control of the mixing of concrete; the site of concrete and backfill control. The concrete and backfill control work, etc..
I just joined the work of the first contact is backfill inspection, backfill, although a single, boring, the general public think that it is not just a little bit of soil, what good to do, but I've been doing a period of time, in fact, it is not so simple: starting from the material requirements of the soil, the soil compacted under the control of the indicators; what part of the need for backfill, what part of the need for backfill gravel or 3:7 gray soil There should be technical indicators to control; the choice of backfilling equipment; backfilling before the conditions are available? Underground concrete foundation strength to meet the specified requirements, the choice of soil materials, compactness requirements, the thickness of the false pavement and compaction coefficient has been determined, backfill compaction can not meet the requirements, it will cause collapse, sinking, and even bring greater harm. So in the subsequent gradual contact with other materials before the inspection, in my mind has been laid to do anything is not so easy, not a trace of ambiguity.
Continuously in the laboratory in contact with more project inspection, clear work procedures, in the specific work of the formation of a clearer working idea, to carry out the work smoothly, and skillfully and successfully complete the work.
First, the control of raw materials: all raw materials into the scene, each batch should be issued by the manufacturer's quality assurance certificate, inspection certificate, each batch of raw materials should be inspected in accordance with the specified number.
① For cement, when using bulk cement silo, different manufacturers, different varieties, different grades of cement is strictly prohibited. In the use of bagged cement, there should be protection measures to avoid moisture caking of cement. For more than three months of storage in the use of cement, should be contacted in advance with the laboratory, the cement of the actual standard for the second review.
② sand and gravel shall not contain foreign matter, coal dust and so on. In particular, it can not be mixed with white ash. When the raw material is found to be inconsistent with the sample or abnormal, it should be contacted with the laboratory for timely disposal. In order not to affect the construction progress, all incoming raw materials must be commissioned in time for the test, 3d strength and 28d strength are used for the cement test, and the test report is issued within twenty-four hours after the test room accepts the commission for steel, sand and stone. All materials to be tested must be issued by the laboratory test report before use. Both the first test, then use the principle, otherwise it is regarded as substandard products. Prohibit the use of the project.
Second, for the control of backfill: backfill before construction, the construction department should truthfully fill out the backfill commissioning sheet, the design drawings have requirements according to the drawings required for construction. There is no requirement for the implementation of national norms. The water content of soil material selected for backfill construction is required. The thickness of each layer of backfill shall be tamped in layers according to the specification, and shall not be missed, and shall be accepted layer by layer. After passing the test, the next backfill can only be carried out, otherwise the construction unit for rework processing.
Third, ① concrete works. For the concrete with special requirements and large volume concrete should be commissioned in advance, and after the opening of the tank should be opened for identification.
② Each time the mixing station mixes the concrete, the mixing ratio should be strictly enforced, the collapse and the ease of control, and make a good record of mixing and production control. If the water content varies greatly, the laboratory should be notified in time to make dynamic adjustments. When using fly ash, environmental pollution should be avoided or reduced. The mixing station retains the concrete test block, and the laboratory will assess the concrete production according to the mixing station's production of concrete grade, batch, time, and concrete production of the mixing station, so that the level of concrete production can be controlled.
Fourth, for the welders entering the construction site civil construction operation, their units must be before the start of the project, the welder's technical grade certificate copies and lists to the test room. Before the start of the project to welders test welding for assessment. After the issuance of a qualified report of the test, the welder can only carry out formal operations.
In the second half of the work, constantly demanding themselves, and constantly urge themselves to improve. As a young worker, I do not dare to treat the work, I ask myself to make the work of the gains and losses and each time the problem to learn from the experience, encountered difficult problems or encountered difficulties in the work of the General Manager and the leadership to ask for advice, patiently listen to his comments, suggestions, and improve the work. Because most of the time in my department is limited to a small circle of work, I can not sit still, I often also from time to time with the site more contact, to understand the engineering procedures, steps, to facilitate the future better service to the work.