The rough housing belongs to the initial decoration of the house, according to its state of decoration, also known as "the first decoration of the house". The home inspection has always been a parallel link, for the rough house, home inspection is an essential part of the work. This encyclopedia together into the rough room room inspection, will introduce you to the rough room room inspection steps, points and forms and other content.
Step by step rough house closing house inspection steps start from the structure, and then only the wall, plumbing and electrical and doors and windows.
One. Structure: the structure of the rough house is the first level to be overcome in the house inspection. Mainly check the level of the ground, the room and balcony of the connection, as well as look at the top of the house whether there is a difference in height exists.
two. Walls: the quality of the wall is not passable, the wall is prone to cracking and tile peeling and water seepage after the renovation.
1. Wall drums, you can use a small hammer lightly to quiz.
2. Whether the wall is perpendicular or not, you can use a professional measuring tape to check tightly against the wall.
3. Whether the wall is damaged, pockmarked like lime bursting point, which is caused by lime water without enough time to mature, the top of the pockmarked, on the later decoration is very unfavorable. In this regard, the owners need to be vigilant.
Three. Water and electricity: water and electricity are not smooth, there will be a lot of problems and trouble for future residence. You can test the smoothness of the water pipe by flushing sound. The access to the weak electricity in the house is also extremely important, you can use megohmmeter to test the insulation resistance value to prevent future problems.
Four. Doors and windows: whether the installation of doors and windows meets the standard has a great impact on the quality of living. If the sealing is poor, it will leak rain not to mention, sound insulation and warmth are problematic. Mainly look at whether the door can be locked, as well as whether it is positive, which requires the use of professional measuring instruments. For the house door frame, to check the integrity of the frame groove.
The newcomers have to learn how to check the rough housing delivery or else they will be utilized by the developers.
Before also do not understand, just take the house well also have no experience, went to a friend there she taught a lot of knowledge of this learning.
The above is how to check the rough housing delivery of some of the introduction,
Question 2: What is the rough housing inspection process? What do I need to pay attention to? Finally almost handed over the house, get the keys is very happy, ready to decorate this time are busy running outside to prepare materials. But at the same time in the delivery of the house should also learn how to check the rough housing delivery, or by the time the developer fooled do not know. Because there may be some small link, was ignored, they are not very clear. Then in that case the handover will have to learn some skills, more helpful to themselves!
What are the rough house inspection process?
What do I need to pay attention to? Next we will analyze: check the structure
Renovators get a house should examine the structure of the house, the structure of the house is not resolved in a hurry to decorate, like building a house on the sand at any time there is a risk of collapse. So the structure of the study is the first pass we have to pass. Use a ruler to measure the actual area of the room. If the error is large, you can ask the developer or commission a professional organization to review the measurement. You can also ask the decoration company to send someone to measure the size directly to save trouble later. Measure whether the floor height meets the requirements. The actual height of 3m is not less than 2.75m, and the height of the residential floor is not less than 2.8m. Measuring the height of the floor is very simple, put the ruler along the corners of two of the walls to measure, and measure a few more places. Check whether the house is tilted Need to use a special instrument, but you can also use a thin rope tied to a heavy object, put down against the wall to the foot of the wall to check the degree of tilt. Only an error of 3cm or more will have a serious impact on the decoration. Carefully check the wall and roof slabs for tilting, bending, bulging or depression. If found should notify the property to deal with in a timely manner, these problems are not resolved is not able to start the renovation
Inspection of the structure 2 check whether there is a reserved air conditioning pipe holes, reserved pipe holes are smooth. It is recommended that the holes be sealed during the renovation phase to prevent rainwater from backing up. Check whether there are cracks on the floor and roof of the house that are at an oblique angle of 45 degrees with the wall corners or perpendicular to the beams, if there are, it means that the house has a serious settlement and there are structural quality problems. Look at the load-bearing walls for cracks, if the cracks run through the entire wall and penetrate to the back, the house is a dangerous hazard, and there are minor cracks in the local walls, which can be solved in the renovation process. The structural problems of the house often appear in the balcony, in case you find the room and the balcony of the connection with the cracks, it is likely to be the precursor of the balcony fracture, be sure to immediately notify the property.
Newcomers are required to learn how to check the rough housing delivery or else they will be exploited by the developer when the time comes.
Before also do not understand, just take the house well also have no experience, went to a friend there she taught a lot of knowledge of this learning. Don't look at a small home inspection process he is very useful, because it is related to the quality of housing issues, such as the developer of the delivery of the house, you can call on the family about the home inspector to go together.
Question 3: Please teach about the rough housing delivery notes According to your question, a brief answer is as follows. Precautions for the delivery of rough housing:
1, if the top floor, to see if the roof leakage;
2, the main switch and leakage protector is ready; whether the official electricity and connected or not, there is zero-time electricity; if the local sockets, all try to see if the installation is correct, available (with a special socket circuit inspection instrument); with an electric pen, socket circuit inspection instrument to go.
3, the socket circuit test instrument with an electric pen.
3, water. Tap water, hot water, water (if any), whether to connect, water pressure is enough; pipeline leakage; hot water temperature is enough; all the switches are available;
4, heating (after moving in and then pay this year, that is, the winter again), gas. Whether it is connected, the meter reading base, should be zero. Whether the heater is complete, the rough housing should generally be with.
5, gate key, total **** a few? Whether it is good (all the keys try to open and close it). Door has no damage, warping deformation, switch is flexible. Cat's eye is available. Figure it out and do a good job of handing over.
6, the property fee can be paid, but to indicate the period. Decoration deposit and so on when the renovation and then pay. Electricity, according to the meter reading, only after the date of delivery.
7, anti-theft intercom, visual system, whether it is intact, available (also try);
8, broadband, telephone line is available, available (the best to try), with a telephone;
9, whether the window is tight, there is no water leakage, the window sill inside the window should be higher than the outside of the 3-5MM (otherwise it will be inverted water in); open whether the flexibility of the switch is intact, Available;
10, toilet, check the building directly below the corresponding position, see whether the washbasin sewer pipe S bend (to prevent odor on the string), if not, in the construction of the decoration should pay attention to good, this article is to remind you to decorate with. And the delivery has nothing to do.
However, stick to one, just as I said, can late delivery as much as possible not to pay or delay!
I'm in the business, so if you don't understand anything, send me a message and I'll do my best to answer you.
Question 4: What do I need to know about acceptance of a rough house? Acceptance of rough room is a lot of homeowners have been ignored by the link, the acceptance of rough room is critical, can not get the keys to a new house is too happy or other reasons and ignored the whole room to do a simple and necessary acceptance, because the acceptance of the rough room directly affects you after the renovation can be carried out smoothly and high-quality completion.
1, doors, windows: the door is the most easily forgotten place, the homeowner is happy to take the key to open the door after the most concerned about going to see the house in the end is what it looks like, and the door of the look, appearance and other issues have been left behind, such a process is never to take. Now residential installation are security doors, open the door to carefully observe and touch the surface of the door with your hand to see if it is flat, there are no scratches or impacted places, and then visually look at the door frame is not correct, because the door frame is not correct will have a direct impact on the use of your future life in the actual use of the door, more should be back and forth to try to see the locks to see if it is possible to open and close properly, and if you encounter problems in a timely manner to reflect to the property to be replaced.
Nowadays, homes are using plastic windows and the use of insulating glass, in the acceptance inspection we have to check the glass in each room, window frames, carefully look at the glass to see if there are debris, water marks, scratches, glass whether there is moisture; window frames are not correct, the window is open and closed whether it is normal to open the window whether it is able to reach 90 degrees, and then feel the window whether to stick the waterproofing strips, and to see whether each window screen are all right. Each window screen is installed.
2, wall, floor: in the acceptance of the rough room, wall, floor is the largest and most critical area. We have to check all the rooms of the wall, the floor is flat, kitchen, bathroom wall is not empty drum place. If the wall is not flat, it will bring a lot of trouble for future decoration, and the floor is not flat enough, it will also affect the future laying of tiles or flooring. Bathroom and kitchen walls, if there are bulging places, the future renovation of the tiles will be easy to cause peeling. In order to avoid and early detection of these problems, we can use some life, easy to operate the earth to detect, find a long some of the straight board on the wall leaning against the wall to see whether the straight board and the wall fit, if there is a 1-2 millimeters error is within the national standard, if the error is large enough to have to let the property to find a worker to re-plastering of this piece of wall. We can also take a book, with one of the 90 degree right angle against the corner of the wall to see if it is perpendicular to the 90 degree yin and yang corners. To see if the wall is empty drum phenomenon, you can use a small hammer to hit the test, by knocking the sound issued to determine whether the wall is empty drum.
3, electricity: in the acceptance of the house should be tested in each room whether there is electricity, each room has a simple light bulb to see whether they are normal. Each room socket must not forget, now on the market to sell simple test pen is not very expensive, we can use the test pen to test each socket are electric. If there is no test pen can be used in an earthy way, with a cell phone charger or hair dryer can be tested.
4, water: in the rough room in the bathroom, the kitchen is a good water pipeline, but most of them do not have a faucet. We can pick up a bucket of water, respectively, into the pipeline, to see if the water is painful there is no clogging phenomenon, if you hear thud thud thud sound of the water under the water is very painful. Bathroom floor should be waterproof, but in the inspection of the room due to conditions can not do waterproof test, so we have to let the renovation workers before the renovation of waterproof test, 24 hours later to see if there is a leakage phenomenon.
5, ventilation system: ventilation system is easy to be ignored in the inspection of the big problem. The flue, exhaust ducts are easy for the future of daily life to leave a hidden place
Question 5: What is the meaning of the rough house rough house handover notes Print article Send to a friend Share button 0 [Abstract] What is the meaning of the rough house? The rough house is also known as the initial decoration of the house, most of the houses such as this house is only the door frame without doors, walls and floors only do the basic treatment without surface treatment. And all the external finishes outside the house, including the balcony, rain cover of the external finishes should be completed in accordance with the design documents of the renovation project. When choosing a rough house What does rough house mean? The rough house is also known as the "initial renovation of the house", most of such houses have only door frames inside the house without doors, walls and floors only to do the basic treatment without surface treatment. And all the exterior finishes, including the balcony, rain cover of the exterior finishes should be completed according to the design documents to decorate the project. When choosing a rough house, you need to pay more attention to the following aspects, rough house delivery notes can refer to the following: 1, if on the top floor, see if the roof has leaked. 2, water. Tap water, hot water, whether it is connected, water pressure is enough; pipeline leakage; hot water temperature is enough; all the switch is available. 3, the main switch as well as the leakage protector is ready; whether the official electricity and connected or not, there is a zero-hour electricity; if the local socket, all try to try whether the installation is correct, available (with a special socket circuit inspection instrument); with an electric pen, socket circuit inspection instrument to go. 4, the property fee can be paid, but to indicate the period. Decoration deposit and so on when the renovation and then pay. Electricity, according to the meter readings, only pay after the date of delivery. 5, the gate key, the total **** how many? Whether it is good to use (all the keys try to open and close it). Door has no damage, warping deformation, switch is flexible. Cat's eye is available. 6, anti-theft intercom, visual system, whether intact, also try. 7, whether the window is tight, there is no water leakage, the window sill should be higher than the outside 3-5MM (otherwise it will pour water in); open whether flexible, switch is intact, available. 8, broadband, telephone line is available, whether through. The rough house is almost no decoration, choose such a house, you can decorate the house into your favorite style, the above is the rough house handover notes, I hope to help you when you hand over the house, you can also ask the professionals to hand over the house together, do not choose a bad house!
Question 6: What are the precautions for rough housing? How to check the house? Finally see the long-awaited new house! At this moment, the owners of the mood or excited, or mixed feelings. As a first-time buyer of friends, in the embryonic house inspection of this piece of experience is relatively inexperienced, acceptance of the house itself is a technical job, not to say that get the keys on the simple things, in fact, the embryonic house acceptance of the notes is also very complex. Do not know? It's okay, this side to explain.
Formal embryonic house inspection program is from the outside to the inside in order to check: 1. External: facade, exterior wall tiles and paint, unit door, hallway.
2. Internal: entrance door, door, window, canopy, wall, floor, wall tiles, floor tiles, water and sewage, waterproof storage, strong and weak electricity, gas, ventilation, smoke exhaust, exhaust.
3. Neighboring side: closed storage water test, water meter idling and other issues must cooperate with upstairs and downstairs neighbors.
Receiving notes: 1. Prepare their own tools: such as tape measure, ruler, ruler and other measuring tools. 2. Measurement of size: This is the most important point in the receipt of notes, test the actual size and size of the house plans match. 3. Measurement of the walls and floor: with a long ruler (or with a level of the special ruler), leaning against the walls and floor, to check whether it is flat, and at the same time to observe whether there are scratches and cracks, walls Whether there is a burst point (burst point: quicklime in the hair of mature lime due to uneven mixing did not send a good, wipe on the wall after drying will form a burst point). Drums, cracks, sand should do a detailed inspection. Ground monitoring is also as a key point in the notes on the receipt of the house. 4. switch light: switch box in each branch switch should be clearly labeled. If there is no or unclear, correct it immediately. Switch box switch should be installed firmly, each should be shaken hard left and right to check, if found loose, should be tightened or replaced. Otherwise, it will cause more danger when there is poor contact fire phenomenon in future use.5. Water and electricity inspection: quality inspection of water supply and drainage installation, circuit insulation, grounding test.6. Burglary check: If there is a visual intercom, emergency call button installed, you should check whether it is working properly.
Question 7: What are the strategies for rough house closing and what should I pay attention to? The rough house is a very critical step, the acceptance of the house is related to the quality of life in the future. So, please pay attention to this process. Don't forget to do this step because you get the keys, then later problems will have to bear the responsibility, so this step must not be less, this side of the rough housing strategy to take a brief look at what to pay attention to what it can refer to the following look.
First, home inspection tools: screwdriver and meter ruler, the purchase agreement, the number of two or more, with a pen and paper. Notes on rough room acceptance should pay attention to the area and layer height.
Second, the wall, roof and six sides: 1, wall materials: red brick, light brick, cinder block, hollow brick, or prefabricated panels.
2, the wall: rough room closing notes should pay attention to the wall with or without plaster layer, plaster layer with or without drums, cracks, skinning, mottling, yin and Yang corners roughly square.
The wall flatness between 3~5mm is relatively normal, doors and windows closed to see the big side, doors and windows open to see the small side, with a meter ruler to measure the top of the ground is square, especially on both sides of the door and window openings, whether square is very important, whether the outer wall is made of internal heat preservation.
3, the ground: there is no plaster layer, there is no calendaring, with a foot rubbing whether the sand, heating pipes, water pipes, electric pipes whether to go underground with or without marking, the commitment to do floor heating is realized. Receiving notes should pay attention to the kitchen, balcony, bathroom floor is lower than the other ground.
4, the top surface: the main attention of the closing notes and the ground is square with no major skew, pay special attention to the kitchen, balcony, bathroom top surface with or without water seepage and leakage phenomenon.
Third, doors and windows: whether the switch is flexible, closed tight, there is no warping, deformation, close the phenomenon of laxity, etc., all the glass should be checked one by one there is no broken, crumbling, broken, sealing phenomenon, sealing strips, dust strips, waterproof strips shall not be missing. The rough house closing notes should pay attention to the entry door lock key must be delivered in full, the door locks must be safe, latch opening and closing flexible, anti-theft devices are available, easy to use, safe and reliable.
Door and window pulls, pins, locks, switches, etc. are firmly installed, easy to use, open freely, without blocking, astringent card and other phenomena. Sliding doors and windows hanging firmly, hanging rail, ground rail fixed firmly, no skewing, shaking and other phenomena, pushing and pulling flexible, no blocking, astringent card phenomenon.
Precautions for acceptance of rough housing
Fourth, water: acceptance precautions are mainly to check the kitchen and bathroom, the main pipeline, sub-pipeline each water room is set up, sub-household master control valves, meters, faucets are complete, valves, meters, faucets and other joints at the joints of the site whether the leakage, seepage, dripping, it is necessary to do a water test, check the water pressure, water flow, water quality.
Fifth, sewage: rough room closing notes mainly to view the kitchen and bathroom, sewer mains, sewer water piping each water room is set, bathtubs, squatting toilets, hand washing basins, etc. Whether the water outlet is reserved, the kitchen, balcony, bathroom must have a floor drain to see whether each floor drain has a grate, each drain and floor drains should be done to drain the test, to see whether each drain and drain , there is no blockage, whether the drainage is smooth.
Six, ground waterproofing: indoor kitchen, bathroom, balcony of the ground should be done waterproof construction, acceptance of notes require the property must be done a closed water test, the method is: the kitchen, bathroom, balcony door blocking, block the floor drain, after blocking the ground water, water depth of 20 ~ 30 mm, water storage time shall not be less than 24 hours to the downstairs to observe the corresponding room Whether water leakage.
VII, strong electricity: detailed view of each room socket, switch, lamps and lanterns configuration, all power lines should be concealed in the wall top ground, there shall be no exposed wires, each socket, switch, lamps and lanterns are good. The rough room acceptance precautions should pay attention to the meter and switch configuration location, the meter should be counted, the switch to have a reliable grounding, corridors, staircases, elevators, sound control, light control switch must be good to use and good to make.
Eight, weak power: TV, telephone, network, audio and other weak power lines, where the real estate developers commitment to take possession of the notes should be into the home are to be itemized acceptance, such as broadband.
Nine, gas: pipeline into the home, the main pipeline, pipeline each gas room is set, gas meter, control valve is complete. Notes on rough housing should be noted that unauthorized demolition of natural gas pipelines are never allowed. Ten, heating: room by room detailed view of the heating pipe, heater installation is tight, firm, whether the pipe joints leakage leakage, check the pressure test records. Heating period before the water test is very important, must participate in their own, must know the location of the main control valve. Note that unauthorized demolition of heating pipes and radiator panels is never allowed.
XI, central air conditioning: air ducts, condensate outlet pipe, temperature control switches, the outlet position is correct, the installation ...... >>
Question 8: How to check the rough house, how to check the house when handing over the house, the precautions of the house inspection Receiving and checking the house in nine steps a wall 1, check whether the wall is cracked. 2, check whether the wall has empty drums, with a small wooden hammer or something else to knock the wall, knocking to the empty drums when the sound issued by the unsubstantial, it is easy to hear. Make a mark and fill in with putty when decorating. 3, check the wall putty, whether it is waterproof putty, you can bring a bottle of mineral water, splash water on the wall, touch it with your hand to see if there is mud on your hand, no words to prove that the wall of water-resistant putty qualified. Second, the roof 1, check whether the roof is cracked. 2, check the roof and the wall of the yin and yang corner line is a horizontal line, if not, in the future renovation should first use the whitewash plaster to find low and then use water-resistant putty leveling can be. Third, the ground 1, check whether the ground is level. 2, check whether there is cracking and anti-sand: the ground with a foot rubbing the ground whether sand particles. Mortar ratio or cement quality is not qualified, uneven mixing will appear this problem. Fourth, doors and windows 1, check the strength of the doors and windows 2, check the function of the window a. Doors and windows push and pull smoothly, the surface is smooth and clean, no serious scratches, profiles are not cracked or broken phenomenon. b. Hardware accessories: complete, correctly positioned, firm c. Sealing quality: doors and windows closed when the fan and frame, fan and fan without obvious gaps, sealing strips are not loose, do not fall off, not exposed. d. Door and window frames, fan vertical, not bent e. Glass without pollution, no breakage, double-glazed interlayer without dust and moisture, separator strip uniform. f.Whether the window drainage holes are opened. Unopened water will flow into the profile. Fifth, the circuit 1, check whether the socket and switch is set up reasonably, the circuit in the renovation of whether the need to transform, one is to see the needs of individuals, the second is to see the house in the socket and switch set up reasonably, easy to use. 2, check whether each light switch and power outlet can be used normally, with a cell phone charger, or electric pen plugged in to check whether the power outlet is energized, of course, professionals will use a special socket check.
Question 9: What are the key considerations for the rough housing inspection? Gross house repossession inspection precautions which some, for how to repossess the building inspection problem, I believe many home buyers are not very clear thinking. Here focus on two aspects, a waterproof inspection, the second is the inspection of doors and windows. This is a problem that people tend to ignore, but it is also very important.
The rough room inspection focus on waterproof
The house is used to shelter from the wind and rain, but the water leakage is in addition to the cracks, the most prone to problems in the place. Waterproof do good at this stage can only rely on look. First look at the ceiling: room
room, balcony, kitchen, bathroom, to see if there is no water soaked water stains, especially kitchen and bathroom hanging in the ceiling around the white drainpipe there is no water leakage flow through the water. Then look at the wall, in the corner of the external wall, air conditioning unit pipeline
hole, outside the door and window openings, window sills, there is no water soaked with water. Finally, look at the outer door, door and window fan closure, door and window frames, fan material splicing, whether there is no water leakage flow through the water.
The rough room inspection doors and windows are very critical
Good quality doors and windows, should be the surface should be clean, smooth, smooth, large surface should be no scratches bruises; window frames, transom, window materials are not warped, deformation; doors and windows, windows and doors, frames around the sealing
Adhesive tape is complete and firm, no leakage; doors and windows naturally closed, frame, fan natural fit, the gap around the size of the same. Door and window glass is not cracked and damaged, not loose, no dust and water vapor in the hollow inner layer of the insulating glass; rubber sealing
strip and glass and glass groove joints are smooth, no crimping off the groove, fracture; sealant bonding is firm, the surface should be smooth and straight, no cracks.
Friends who have not renovated may not know that many families from the moment they receive the notice of receipt of the bill of lodging, the closing of the building inspection of the trouble also comes with it. It is recommended that the best time to find a professional home inspector accompanied by a professional home inspector to participate in the inspection, more timely detection of problems.
Question 10: rough house inspection notes a. Related documents
Check the contract, see whether the annex agreement with the actual. Commodity house pre-sale contract", "residential instruction manual", "residential quality guarantee", "completion and acceptance of the record table".
Second, the entry door
1: Check the entry door door body whether bumps, scratches, door seals, decorative caps and other accessories installation.
2: Whether the door paint is off, smooth, consistent color, no rust.
3: whether the door locks open flexible, firm, easy to operate, uniform locking.
4: whether the door shaft is flat and firm, smooth rotation.
5: door frame, fan installation, fan and frame combination, sealing performance.
6: whether the door frame and the wall between the entry door is filled with foam and neutral silicone sealant.
7: Whether the cat's eye is intact, clear vision.
8: Whether the doorbell button is intact, and there is sound when power is added.
9: door variety, type, specifications, size, opening direction, installation location and other items.
Third, indoor doors and windows
1: single glass is greater than 1.5 square feet whether to use safety glass. Seven and more than seven layers of buildings must use safety glass.
2: whether the sliding window is installed anti-falling device.
3: Whether the sliding window is installed anti-collision block.
4: Whether the lower frame track of the sliding window has a drain hole.
5: Check whether all windows and sliding door profiles are deformed.
6: Window glass surface check whether there are scratches, breaks, bubbles, sand holes and so on.
7: Hollow, tempered, frosted, flat, heat-absorbing, reflective, laminated, laminated silk, embossed glass check.
8: between the window frame and the wall whether inside and outside the frame are playing neutral silicone sealant.
9: Check the screens.
10: balcony, window guardrail height, vertical rod spacing, guardrail installation, fixed items. Sill lower than 0.9M should have protective measures.
11: Check whether all the doors and windows are installed firmly, door and window sashes are skewed.
12: Check whether all the doors and windows push and pull smoothly.
13: Check whether all the doors and windows locks open flexibly, firmly, easily operated and evenly locked.
14: Check whether all doors and windows exceed the allowable deviation range of installation.
15: Check the drip line.
Fourth, civil engineering
1: walls, floors, ceiling drums.
2; infrared cast meter to detect the flatness of the roof of the house.
3: Infrared rangefinder to detect the net height of the house.
4: Check whether the yin and yang corners of all rooms are square and straight.
5: Whether the wall, floor and ceiling are cracked.
6: Whether there are rust spots on the wall, floor and ceiling.
7: strength of cement mortar of plaster layer.
8: Whether the coating is chalking.
9: Check all rooms at 90 degree angles.
10: Wall flatness check.
11: Wall verticality check.
12: Strength of cement mortar for floor leveling layer.
13: Check the external wall insulation.
14: Check the beam skew
15: Whether the rebar is exposed, whether the wall is seeping, whether there are cracks in the wall, whether the load-bearing walls, beams and columns comply with the design specifications.
16: Check whether the width of the doorway, height is in line with the standard.
V. Water Supply and Drainage Project
1: Test the water pressure with a water compressor.
2; check the water meter (to assist the owner to copy the readings).
4: Check whether all water outlets are inward and crooked.
6: Check for leaks.
7: Check feed pipes.
8: Check drain pipes.
9: Check bathroom waterproofing.
10: Check the drain return slope.
11: Check whether the floor drain, toilet drain is blocked.
12: The bathroom to do closed water test.
13: Check whether the slope of the drain pipe installation is uniform, no anti-slope.
14: Check whether the drain pipe riser, branch pipe, cross pipe access port setting is standardized.
15: Check whether the floor drain is set "S" bend.
16: whether the balcony has drainage measures.
17: Check the floor drain.
Six, strong and weak electricity works
1: Check whether the wire diameter is up to standard.
2: Check whether the installation of the distribution box box is flat, firm and standardized.
3: Check whether the distribution box box wiring neat, no stranded phenomenon, complete circuit numbering, correct identification.
4: Check the distribution box box electrical appliances and wire type, specifications are in line with the design requirements, and leave enough terminal blocks, over the line and wiring space.
5: Check whether the PE line of the distribution box is connected to the box.
6: Check the plumbing diagram to see if the construction is according to the diagram.
7: Test all the sockets with a phase detector.
8: Check the bathroom equipotential connection.
9: Check the distribution box leakage protection.
10: Draw live wire.
11: Check whether all switch panels are switching flexible.
12: Open all the sockets to check whether the wiring and construction is standardized.
13: Check whether the concealed box is broken, protruding from the wall, whether to install the lock mother.
14: Try lighting.
15: Check the multimedia information box.
16: Check the meter (to assist the owner to copy the readings).
17: Whether the size of the meter is in line (10-40A).