Integrated wastewater treatment equipment after normal operation, the main focus on the following points: 1, whether the fan is running normally, whether the lack of oil; 2, sewage lifting pumps start normally; 3, disinfection equipment whether the lack of material; 4 grating wells intercept debris is cleaned.
The flow of sewage treatment equipment is as follows: