Construction site rainy season three security emergency plan

Construction site rainy season three security emergency plan

In the school or society, sometimes there will be some unexpected accidents, in order to avoid things worse, it is necessary to prepare a specific, detailed, targeted emergency plan in advance. Then prepare an emergency plan need to pay attention to what problems? The following is my construction site for you to collect the rainy season three security emergency plan, just for reference, I hope to be able to help you.

Construction site rainy season three security emergency plan 1

First, the general principles

1, the preparation of the purpose

In order to do a good job of the company's coal mine flood control work, to improve the arrival of the rainy season caused by a major disaster accident rapid rescue rescue and relief response capacity, to prevent the disaster from further expanding, to protect the personal safety of employees

2, the preparation of the basis

National "Emergency Preparedness Guidelines", "Flood Control Law", "Water Law", "Flood Control Regulations", "National Overall Emergency Response Plan for Public Emergencies", "National Flood and Drought Emergency Response Plan".

3, the scope of application

This "plan" applies to the company's coal mining enterprises due to natural or man-made factors caused by flooding, storm waterlogging, waterlogging in the collapse zone and other disaster events of defense and disposal.

4, working principles

This "plan" fully embodies the people-oriented, prevention-oriented, prevention and rescue combined, adhere to the idea of combining engineering and non-engineering measures, adhere to the administrative leadership system of responsibility, unified command, unified scheduling, division of labor and cooperation, each in its own way, all-out rescue, ensure safety.

The second key protection object

All the company's business personnel; the company's coal mine industrial plaza, underground engineering, underground production system equipment, the ground of the mining highway, the ground of the mine high-voltage power supply lines, the ground and the underground communication system; the company's various business units of the ground facilities, etc.

The company's business units, the company's business units of the ground facilities.

Third, the emergency rescue organization and responsibilities

1, the organization

The company set up the rainy season "three prevention" emergency rescue headquarters, headquarters in the scheduling center.

Commander-in-chief: Zhang Yong, chairman of the board of directors

Deputy commander-in-chief: Qiu Jiagui, deputy production manager; Tan Jincheng, deputy safety manager; Ke Yueheng, chief engineer.

Member units: scheduling center, geodesy section, safety monitoring department, mechanical and electrical supply department, one pass, three prevention department, coal mining team, administrative office, monitoring room, trade unions, discipline inspection office, security department, logistics department, medical office.

Director: Director of the Dispatch Center

2, responsibilities

Command: mainly responsible for coordinating the operation of various departments during the accident emergency rescue, co-ordination of emergency rescue operations, emergency rescue for the scene to provide a variety of information to support the implementation of rapid and accurate development of the implementation of disaster relief programs.

The commander-in-chief: fully responsible for the organization and command of the flood emergency disposal.

Deputy commander-in-chief: to assist in the organization of flood emergency relief work.

Member units: obey the commander-in-chief, deputy commander-in-chief of the instructions, to complete the tasks assigned. Specifically:

(1) scheduling center: responsible for summarizing weather forecasts, transmission of information on flood season, arranging flood duty, organization and coordination and check the progress of the "three prevention" key projects and reports on the "three prevention" work. It is responsible for organizing emergency rescue and rescue operations at the site according to the rescue plan, following the orders of the command department, and liaising with the neighboring mine rescue teams for help.

(2) Geodetic Section: Responsible for the hydrological observation of the shaft and the underground, regular observation of the surface river, water accumulation in the coal mine subsidence land, cracks, etc., arranging waterproofing projects, organizing the inspection of the "three precautions", and preventing and controlling the water during the flood season. It is responsible for the prediction of anti-drainage of underground mining and digging faces. It is responsible for providing technical data such as geological parameters of water breakout points in each coal mine and providing technical guidance.

(3) Safety Supervision Department: It is responsible for supervising and checking the progress of the "three prevention" work of each unit (focusing on coal mines). Supervision and inspection of the construction units to do a good job of the "three defenses", as well as the excavation of the ground drainage ditches, the maintenance of leaky houses, waterproofing project construction work. Responsible for the inspection of water accumulation at the entrance of wind wells and underground ventilation lanes. Responsible for supervising the implementation of accident rescue plan and safety measures, and organizing or assisting in the investigation of accidents.

(4) Electrical and Mechanical Supply Department: It is responsible for the "three defenses" of the power supply system in the shaft and underground. Setting up and testing various lightning protection facilities, measuring the efficiency of underground electromechanical equipments and drainage equipments and ensuring that the drainage system can be operated at full capacity, and reporting the results of various tests to the company's office of the "three precautions" in a timely manner.

(5) One-pass and Three-prevention Department: Responsible for the ventilation of the coal mine, and provide ventilation guarantee for the place of accident rescue.

(6) mining team: responsible for the organization of underground water silo and drainage ditch digging and gangue mountain system of anti-drainage work.

(7) Administrative Office: Responsible for the timely transmission of superior "three defense" documents and the arrangement of emergency vehicles.

(8) monitoring room: responsible for the communication facilities of the "three defenses", to ensure that the flood season communication lines open.

(9) trade unions: to assist the accident unit to do a good job of the accident casualties after the rescue work.

(10) Discipline Inspection Office: to participate in the investigation of the accident and accountability.

(11) Security Department: responsible for the establishment of the "three defense" rescue team and training and exercises. Responsible for ensuring that the transportation of rescue and relief supplies on the road and the accident occurred in the place of law and order.

(12) Logistics Department: Responsible for the maintenance and demolition of dangerous buildings and buildings under the jurisdiction of the "three defenses" as well as the resettlement of people affected by the occurrence of dangerous disasters. It is responsible for organizing the reserve of "three-proof" rescue materials and the "three-proof" work of the storehouse. Requirements for emergency supplies to meet the needs of emergency, to do special library special put.

(13) infirmary: responsible for organizing the medical staff of the injured first aid work.

(14) on-site command: after the accident, the establishment of the site command, the executive deputy manager is responsible for organizing the development of rescue programs and on-site rescue work.

Fourth, prevention and early warning and rescue

1, prevention and early warning preparations

Early in the fourth month of each calendar year, the units set up "three defense" leading organizations, clear responsibilities, implementation of the responsibility to report the "three defenses In order to do a solid and effective job of flood control, after each rain to the "three prevention" facilities for a comprehensive inspection, found hidden dangers in a timely manner, and will be the relevant information regularly to the company's dispatch center report.

Dispatch center during the flood control must be collected every day weather station information; the company's safety supervision department of flood control and drainage project each time after heavy rain check once, found dangerous timely to the dispatch center notification. Mine scheduling office is responsible for the company's scheduling center to report to the rainy season "three prevention" work related information, reporting time for the 3rd, 13th, 23rd of each month (special circumstances timely report), reporting information materials uniformly printed on A4 paper.

2. Classification of danger

(1) general danger, the dispatching center to notify the rainy season "three defenses" office, the "three defenses" office to organize the relevant units to the scene to see, and develop corrective and preventive measures.

(2) In the case of large danger, which affects the normal operation of local production system, the dispatching center shall notify the duty leader and the chief engineer and the office of "three prevention", and mobilize the team according to the instruction of the chief engineer to carry out rescue and disaster relief.

(3) major danger, affecting the normal production or operation of each unit and the life safety of employees, the dispatch center shall notify the relevant personnel to standby at the dispatch center in time according to the list of units and personnel notified of the major accidents and set up the rescue and relief headquarters promptly.

3, the rescue procedures in the event of a major or major danger

(1) receiving the police and emergency start.

After the rainy season "three defense" accident, must be in accordance with the "accident scene people or knowingly - mine scheduling room - mine duty leader --The mine manager, the chief engineer - the company dispatch center - emergency rescue command" order to report, report content including accident time, location, personnel, scope, extent, etc. The report includes the time, place, personnel, scope and extent of the accident. After the commander-in-chief decides to activate the rainy season three preventive emergency plan, he immediately issues an order to the dispatching center to activate the plan. Reporting method to take the phone report.

(2) Rescue action.

A, the dispatch center received the order of the commander-in-chief, in accordance with the company's emergency plan, "the order of telephone notification of major security incidents", notify the members of the command team to arrive at the dispatch center to gather.

B, command members arrived at the dispatch center, in accordance with the instructions of the commander-in-chief or deputy commander, immediately went to the scene of the accident, the establishment of on-site rescue and disaster relief command center, to assist the accident unit to carry out rescue and disaster relief work.

C, the rescue command center should be according to the situation in the disaster area, the development of rescue programs and safety and technical measures to organize rescue. Rescuers in rescue personnel in distress, should determine the location of people in distress, the amount of water, flooding degree, tunnel damage and ventilation.

D, the drainage process should cut off the power supply, maintain ventilation, strengthen the detection of toxic gases, and pay attention to the observation of the roadway to prevent the occurrence of roofing. The rescue specialty group should immediately rescue the injured and trapped people according to the accident scene.

E. The medical rescue group composed of medical office personnel should provide emergency medical treatment to the injured. When the medical rescue team can not rescue, the injured should be transferred to the hospital in time for treatment.

F, this plan can not meet the scene of effective disaster relief, the command to the higher authorities and government departments for help. All the injured mouth, trapped people rescued, to count the number of people on the scene, rescue personnel to evacuate the scene of the accident. The commander-in-chief gives the order for the end of emergency response, and the accident rescue personnel return to the company. By the company's relevant departments and offices to form an investigation team, the accident investigation, and report to the higher level.

V. Principles and procedures for restoration of normalcy

1, the principle of restoration of normalcy

(1) the principle of people-oriented. After the end of the accident scene rescue and relief, it must be verified to confirm that all casualties and people in distress in the disaster area were rescued.

(2) the principle of ensuring safety. After the end of the rescue, the accident scene reconnaissance, and eliminate or control may cause another accident or induce other accidents hidden trouble.

(3) implementation of the principle of monitoring. Continuous monitoring and surveillance of the accident scene by artificial and safety instruments, found to be abnormal, immediately take appropriate safety measures to eliminate all kinds of hidden dangers.

2, the procedure to restore normal state

After the completion of the scene of the emergency rescue work, the rescue team responsible for the rescue work truthfully to the rescue command report, the command carefully verified by the conditions of the command to return to normal state, approval of the rescue team to withdraw from the scene, announced the end of the rescue work.

3, post-disposal

(1) rescue work is over, the rescue ` departments and units to seriously check the rescue personnel, inventory equipment, equipment; accounting for rescue costs, organizing the rescue records, drawings, within three days to write a rescue report.

(2) The company organized the relevant departments to investigate the accident scene, preliminary investigation and analysis of the accident, identify the causes of the accident, and organize the development of preventive measures.

(3) The rescue process should be kept complete emergency rescue records, programs, documents, drawings and other textual and audio-visual information.

Six, emergency security system

1, human resources security

Emergency by the rescue headquarters under the unified command of the mobilization of ambulance, medical, security and other relevant departments of the personnel, the organization of a strong rescue and relief team to ensure the effective implementation of the plan.

2, communication (information) security

The units, departments, personnel involved in the plan should ensure that the communication between each other, information (using the phone, fax, e-mail, etc.) unimpeded, to ensure that the timely start of the plan.

3, rescue materials security

Logistics Department should be stocked with "three defense" accident rescue materials, and to ensure that when an accident occurs, in the first time to put into the disaster rescue work to achieve the purpose of controlling the disaster. Reserve materials must be regular maintenance, maintenance, to ensure that can be used normally, and send a person to manage. Without the order of the emergency rescue headquarters, any unit or individual shall not be used without authorization. Necessary equipment should be: water pumps: 10; large caliber water pumps: 5; a variety of water pipes: 1000 meters; rubber pipe: 1000 meters; shovels: 100; wire: 300 kg; sandbags: 1000; loader, excavator, engineering vehicles are on standby.

4, financial security

Each unit has a special emergency rescue costs, the accident should be provided in a timely manner after the emergency rescue funds required to ensure that the funds required to rescue the smooth.

5, exercises

rainy season "three prevention" emergency rescue drills are responsible for the organization and implementation of the unit's security section, and will be reported to the company's scheduling center and the company's safety monitoring department.

VII, the plan of training and exercises

1, the company's Safety Supervision Department should be included in the annual training program flood emergency plan.

2, each unit of the Security Section should be based on the flood emergency plan for drills.

3, the safety inspection section is responsible for supervising the flood emergency plan exercise.

Eight, bylaws

1, plan management and update

The company's scheduling center is responsible for the management of the plan, and according to the simulation of the problems in the exercise, the plan to modify the supplement. The updating of the plan is completed before January 1 every year. When there is a flood accident, the command department will issue an order to start the corresponding level of the emergency plan, and the company's Production Technology Department, Safety Supervision Department, Electrical and Mechanical Supply Department, One Pass, Three Prevention Department, Coal Mine Mining Teams, Administrative Office, Monitoring Room, Labor Union, Discipline Inspection Office, Security Department, Logistics Department, and Medical Office will be responsible for coordinating and organizing the implementation of all relevant units.

2, rewards and accountability

In the implementation of the plan in the process of the relevant units to do their duty, the work done solid in place without any accidents, then the relevant units to reward; if the implementation of the plan during the period, due to the negligence of some of the relevant units to work, supervision is not effective, resulting in human factors caused by flooding damage, then the relevant units in the corresponding fines.

3, the plan for the record

rainy season "three defense" emergency plan in the unit data room for the record.

4, plan implementation time

This plan from April 1 to October 1, the end of the implementation.

Construction site rainy season three security emergency plan 2

First, the rainy season construction general requirements

1, to ensure the smooth flow of information. Due to the uncertainty and suddenness of the rainy season construction storms and other inclement weather, it is difficult to predict the degree of damage, the need to strengthen the control and management of meteorological information, timely and effective safety measures to strengthen prevention.

2, the comprehensiveness of the protection. Construction site involves a wide range, including all parts of the site and temporary facilities for the safety and security of all personnel, so in the development of security measures must be comprehensive, meticulous and considerate, not because of the small things not to, in order to leave hidden dangers, bring losses.

3, scientific organization of construction. Preparation of the construction organization design to take full account of the characteristics of the construction of the rainy season, will not be suitable for the construction of the rainy season in advance or delayed arrangements for the project, to improve the process of interspersed, improve efficiency and construction speed, encountered a large stormy weather should be stopped construction.

4, rapid response to make emergency preparations for flood rescue and relief, construction in the rainy season, a variety of protective measures to be further strengthened. Ensure that rescue and relief materials and personnel in place, the occurrence of dangerous situations immediately start the emergency plan.

Second, the rainy season construction safety preparatory measures

1, reasonable arrangement of work and rest time. In case of large stormy weather should stop all the operators to withdraw to a safe place.

2, good site drainage.

(1) The construction site in the rainy season should be dealt with dangerous rocks to prevent landslides, landslides and other disasters.

(2) to ensure that the road is smooth, the road surface according to the actual situation, respectively, hardened or paved gravel, slag or other materials, and according to the requirements of the height of the arch.

(3) raw materials, finished products, semi-finished products protection. Comprehensive regular inspection of the material warehouse, timely maintenance, good drainage around the wall base, solid, no leakage of rain and seepage, steel and other materials stored to take appropriate measures to prevent rain, to ensure the quality and safety of materials.

(4) Strictly according to the flood control requirements to set up continuous, smooth drainage facilities and emergency supplies, such as water pumps and related equipment, plastic sheeting, linoleum and other materials.

Third, the key sub-items of rainy season construction safety measures.

1, foundation works.

The foundation project is greatly affected by the rain, if you do not take relevant precautions, it may have a serious impact on the construction safety and quality of the building. Therefore, in the rainy season construction, pay attention to the following points:

(1) rainy season excavation trench (pit) or pipe trench, should pay attention to the slope stability. If necessary, the slope can be appropriately slowed down or set up support. Construction should be strengthened to check the slope and support control; for the excavated trench (pit) or pipe trench to set up support; being excavated to slow down the side of the main break supplemented by support; rain affects the larger stop construction.

(2) rainy construction work surface should not be too large, should be completed section by section, piece by piece of staging, rainfall, should stop the large area of earthwork; foundation dug to elevation, timely acceptance and pouring of concrete bedding; such as rain soaked foundation, should do the necessary excavation backfill and other restoration of the base load-bearing capacity of the work; important or special projects should be completed before the rainy season task.

2. Concrete works:

(1) The template isolation layer should keep abreast of the weather forecast before painting, in order to prevent the isolation layer from being washed away by the rain;

(2) Pouring of concrete should be stopped in the event of heavy rain, and the poured parts should be covered. Cast-in-place concrete should be based on the structural conditions and the possibility of more consideration of the retention of several construction joints;

(3) During the rainy period of construction, the measurement of the water content of the coarse and fine aggregates of concrete should be strengthened, and the water consumption should be adjusted in a timely manner;

(4) Before pouring concrete on a large area, it is necessary to know the weather forecast for 2-3 days. Try to avoid heavy rain. Concrete pouring site to prepare a large number of rainproof materials, in case of pouring suddenly rain cover;

(5) template support under the backfill should be tamped, and add a good mat board, after the rain in a timely manner to check whether there is no subsidence;

(6) when it rains shall not be reinforcing steel welding, butt joints and other work, when urgently needed to do a good job of rainproof work or move the construction work indoors; just welded reinforcing steel joints Parts should be protected from rainwater, so as to avoid the sudden cooling of the joints occurring brittle cracks affect the quality of the building.

3, hoisting project:

(1) components stacking place should be flat and solid, around the good drainage work, is strictly prohibited components stacking area of water, soaking, to prevent soil sticking to the pre-buried parts;

(2) tower crane roadbed, must be higher than the natural ground 15cm, is strictly prohibited from rain soaked roadbed;

(3) after the rain when hoisting, should be the first to check the stability of the crane itself, to confirm the stability of the crane itself, to make sure the quality of the building. Check the stability of the crane itself, confirm the safety of the crane itself has not been damaged by the rain and then do a test hoisting, will be lifted to about 1m, back and forth up and down a few times to stabilize the hoisting work;

(4) rain may affect the crane driver's line of sight, if the driver does not have the experience of hoisting in rainy days, stop the hoisting work; or please have experienced drivers to carry out;

(5) When stopping the work, the hook of the tower crane should be withdrawn close to the tower body, and no objects such as slings and building components should be left on the hook, in order to prevent these heavy objects from being blown by the wind causing the tower crane to sway, which may cause serious accidents such as the collapse of the tower crane;

(6) As the surfaces of the components and the hoisting ropes are wet, the friction coefficients between the ropes and the components are lowered, and serious quality and safety accidents such as the slipping of components may occur; at this time, the hoisting work is carried out. Safety accidents; at this time the lifting work should be doubled attention, if necessary, can be taken to increase the roughness of the rope and the surface of the component and other measures to protect the lifting work safety;

(7) rainy day lifting should be expanded to ground the scope of the forbidden, if necessary, additional manpower for guarding.

(8) six or more wind or rainstorm weather to stop all lifting operations.

4, construction machinery rain and lightning protection and construction site electricity:

(1) rain. All machinery sheds should be built firmly to prevent the collapse of the rain. Electromechanical equipment to take rain, flood prevention measures, can be set up rain shed or sealed with rainproof cloth, machinery installation site requirements slightly higher, surrounded by better drainage. Installation of grounding devices. Mobile electric gate box leakage protection device to be reliable and sensitive;

(2) lightning. Rainy season is the lightning season, in order to prevent accidents caused by lightning strikes at the construction site, must be in the steel pipe scaffolding, tower cranes, material hoists, people and goods elevators, etc. to install effective lightning protection devices, lightning grounding resistance shall not be greater than 10 Ω.

(3) anti-electrocution. Construction site electricity must comply with the three-level power distribution and two-level protection, three-level power box for repeated grounding, resistance less than 10Ω; wires and cables are reasonably buried, there shall be no aging or broken cables; staff dormitory placement of safe voltage, in case of stormy weather, to arrange for a professional electrician on-site duty to check, and if necessary, immediately pull the switch to disconnect the electricity, all workers must be off before the end of the various equipment and tools power disconnect.

Four, rainy construction safety precautions

1, strengthen the safety inspection, timely detection of problems. The main body of the building, scaffolding, construction of electricity, the small machinery of the rain shelter and temporary facilities, safety signage for regular inspection, timely detection of problems in a timely manner, timely exclusion, repair of the damage in a timely manner.

2, pay attention to the use of rain-washed materials, to take treatment measures before use.

3, the storm should immediately stop outdoor construction work, personnel quickly withdrawn to a safe place, while the whole site should be decisive pull off the power supply.

4, to strengthen the training and education of construction personnel, to strengthen the rainy season safety construction of general knowledge, to improve self-prevention capabilities and emergency response capabilities.

;