Tendering control price: the bidder bidding unit according to the relevant calculation of the price basis and construction design drawings calculated on the bidding project is limited to the maximum project cost. That is, we often say that the "block price". Bidder bidding unit can afford the highest cost of construction, so is the bidder bidding unit bidding price ceiling.
Tender control price should be open in the bidding documents, tender control price can effectively prevent the bidding, more than the tender control price of the bidding price should be rejected (that is, become a waste of tender).
Bidding price: refers to the bidder bidding unit according to the specific circumstances of the bidding project, the preparation of all the costs required to complete the bidding project, is based on the national provisions of the pricing basis and pricing methods calculated project cost, is the bidder bidding unit of the construction works of the expected price. The bottom of the bidding by the cost, profit, taxes, etc., - generally should be controlled in the approved general budget estimates and investment envelope limit.
Block price: block price refers to the bidder bidding unit in the bidding process to the tenderer bidding unit publicized the total price of the project's highest limitations on the standard, is the bidder bidding unit expects the price, the requirement of the bidder bidding unit bidding can not be more than it, or else for the abolition of the bid.
They have the same point: are all bidders bidding unit preparation.
What is the difference between them! As follows:
1, bidding control price (barrage price) is the maximum price, bidding price, such as more than the abolition of the bid. The bottom of the bid is the psychological price, close to the bottom of the bidding score the highest, but in the offer are higher than the bottom of the bid, the lowest bid can still win.
2, the bottom price is not public, is the lowest price, in order to prevent malicious competition with.
Control price is public, is the upper limit, in order to control the cost, budget, to prevent bid-rigging.
The base bid is a reasonable basic price calculated by the owner's organization specialists for that part of the work or (and) equipment ready for bidding. It is not equal to the project or (and) equipment estimates (estimates), nor is it equal to the contract price. The bidding unit is the bidding unit of top secret information, can not be disclosed to any unrelated personnel.
In general, the bidders bidding unit with their own advantages, according to the current market prices and supply and demand for the offer, and fill in the amount of work 淸单(不能称为清单制成预算制)各子项目综合单价和合价, not with the budget preparation of the bidding price; bidders bidding unit should be prepared according to the current market prices of the bidding price, and in accordance with the approval of "costs "to prevent unhealthy competition.