About bioengineering generator rental contract

About Bioengineering Generator Rental Contract 7 articles

The lessee cannot be exempted or partially exempted from the obligation to deliver the rent, and should still deliver the rent according to the agreed amount, do you now know how the contract looks like? I am here to share with you some information about bioengineering generator lease contract, I hope it can help you.

About bioengineering generator rental contract article 1

Party A (lessee): _______ Real Estate Development Company Limited

Party B (lessor): ________

A, B and the two sides through friendly consultations, on the Party A leased the use of the generator set of the Party B to reach the following agreement, to enter into the contract *** with the compliance with the implementation.

First, the number of leased generator sets and models contract price:

The tentative total price of the contract is: RMB ________________ yuan (¥ ________________ yuan)

The above contract monthly rental fee includes the generator set to the use of the location of the transportation costs, responsible for the generator set to and from the cost of lifting in place, Maintenance cost of the generator set, workers' basic salary, overtime, five insurance and one gold, wage allowance, mobile construction allowance, rent subsidy, food and beverage, employee welfare, labor protection, taxes, profits, Party B's management fee, unforeseen expenses and other costs. In addition, Party A does not need to pay any other expenses to Party B.

Second, the lease period:

Lease period from the generator set to the use of the location of the installation is completed the next day after the start of the calculation (to Party A's written confirmation of the date shall prevail), the lease period for the time being six months.

Third, the conditions of handover of the generator set:

1, Party B is responsible for the transportation cost of the generator set to the place of use, responsible for the generator set to and from the cost of lifting in place.

2, Party B is responsible for providing all the maintenance costs of the unit in operation.

Fourth, the use of location:

________________________________.

V. Rent, payment term and payment method:

1.? Consensus of both parties, every full month the two sides to settle.

2, the lease period of one month in accordance with one month settlement, more than one month, but not meet the month, ? Rent is settled on a daily basis.

3, Party B should be in the collection of Party A each project payment at the same time, the same amount of valid invoices issued to Party A. Otherwise, Party A has the right to refuse to pay the money until it receives the invoice issued by Party B.

VI. Rights and obligations of both parties:

1.? Party B sends management personnel to Party A to be responsible for the normal power generation of the generating set, and Party B is responsible for the accommodation and food of the management personnel sent by Party B during the service period.

2.? During the lease period, if the generator set failure, Party B is responsible for the repair and its cost. Generator set within a week, more than 3 times non-users of the reasons for the phenomenon of downtime, replacement of the generator set.

3. Due to the generator set itself cause failure downtime, time more than 24 hours, Party B should be within 24 hours to replace a unit of the same type for Party A to use, the replacement cost borne by Party B.

4, Party A is responsible for the diesel fuel and oil required for the generator set.

5, during the lease period, Party B is responsible for the security of the unit during the lease period.

VII. Liability for breach of contract:

Any violation of this contract shall constitute a breach of contract, and the breaching party shall be liable for the breach of contract and compensate for the loss suffered by the contracting party as a result.

VIII. Dispute resolution

1, ? A, B friendly consultation;

2.? According to the law to the people's court of competent jurisdiction of the location of the project.

Nine. Contract termination

1,? A and B consensus, you can cancel the contract.

2,? One of the following circumstances, Party A and Party B can terminate the contract:

(1)? The contract can not be performed due to force majeure.

(2)? Due to the suspension of construction or Party B serious operational difficulties and lead to bankruptcy, liquidation, resulting in the contract is not necessary to fulfill.

(3)? If other circumstances of termination agreed in this contract appear or the termination clause stipulated in the law is established.

3.? If one party requests to terminate the contract, it shall send a notice of termination in writing to the other party, and the contract shall be terminated when the notice reaches the other party. Dispute over the termination of the contract, according to the agreement on disputes in Article 8.

4, ? Party B shall start to withdraw from the site within 3 days from the date of receipt of Party A's notice of termination of the contract, and complete the withdrawal within 5 days from the date of starting the withdrawal, if the withdrawal is late, Party A has the right to forcibly clear the site, and the losses caused by Party B shall be borne by Party B. The materials, equipment and facilities left by Party B at the construction site shall be regarded as Party B has given up the ownership rights, and Party B agrees to dispose of them at its own discretion.

5, ? After the contract is canceled, it will not affect the effectiveness of the settlement and cleanup provisions agreed by both parties in this contract.

X.? Other

1.? The unfinished matters of this contract shall be agreed upon by both parties in a friendly manner to reach a supplementary agreement, which shall have the same legal effect as this contract.

2,? This contract is in duplicate, A and B each party to sign a copy, have the same legal effect.

3.? This contract shall enter into force on the date of signature and seal of both parties.

Party A: __________________? Party B: _____________

Contracting representative: ________? Signing Representative: ________

Date: _____________? Date: _____________

On the biological engineering generator lease contract article 2

The lessor (hereinafter referred to as Party A): _____

Lessee (hereinafter referred to as Party B): _____

After the negotiation between the two sides, Party B to Party A to rent generator *** two, model ______, for Party A expansion project site use, in order to clarify the responsibilities and obligations of the two parties hereby enter into this agreement. In order to clarify the responsibilities and obligations of both parties, this agreement is hereby concluded.

Article 1: Party A's responsibility

1.1 Party A must provide Party B with a generator set with perfect performance to meet the needs of on-site construction power supply.

1.2 Party A must be equipped with two qualified licensed operators, responsible for the maintenance and repair of the construction site unit to ensure that each unit operates normally, maintenance and repair costs by Party A is responsible for. On-site operators must comply with the relevant operating procedures and site rules and regulations, responsible for Party B leased generator defense, such as the site of the unit loss, damage, Party B does not assume any responsibility.

1.3 Party A is responsible for the proper custody of Party B purchased and transported to the site of the unit fuel (lubricating oil purchased by Party A), to ensure that the fuel is not lost, leakage; if lost, leakage, Party A at the price of the compensation, and bear all the losses caused to Party A.

1.2 Party B is responsible for the maintenance of the generator, and is responsible for the protection of the generator, such as loss of the unit, damage to the site.

1.4 Party A must comply with Party B's site unit fuel registration system, so that the unit is running normally, the fuel consumption is counted. Prohibit generators without load fuel consumption power generation; such as Party B unit without load power generation for more than half an hour, each found a fine of _____ yuan.

1.5 Party A is responsible for the entry of the unit, responsible for the safety of lifting and transportation of the unit, and Party A is responsible for the cost of lifting and transportation of the unit to the site.

1.6 After the expiration of the lease period, Party A must safely withdraw all the units leased by Party B from the site in one go within three days, and the appearance fee will be paid to Party A by Party B according to ______ RMB.

Article 2 Responsibilities of Party B

2.1 Party B is responsible for the leveling and stabilization of the site of the units. It is responsible for the meals and accommodation of the on-site crew management personnel sent by Party A.

2.2 Party B guarantees that the unit shall not be used in bad environment (e.g. storm). In the process of use, if there is a failure, timely notify Party A to repair, and shall not be disassembled at will.

2.3 During the lease period, the fuel oil consumed by the unit will be purchased by Party B and transported to the site, and Party A will be responsible for keeping it, and Party B will carry out sampling and verification at any time.

Article 3 Settlement

3.1 The lease period of the generator unit is ______ months, less than one month rent by day, the lease time is calculated according to the actual use of time.

3.2 The rental period is based on the date of the unit entering the site and passing the test, and ending on the date of shutdown and use. The rent shall be settled on the basis of ______ RMB per unit per month, and the above rent has already included the salary of Party A's operators and other expenses. Party A will receive the project payment with the tax-paid invoice.

3.3 After the signing of this Agreement, Party B shall pay Party A ______ RMB in advance as deposit for the units, and offset the corresponding amount of rent at the time of settlement.

3.4 Each generator provided by Party A must meet the electricity needs of Party B's construction site. If Party B's construction site is down for more than one hour due to Party A's or the generator's failure, etc., a fine of 1000.00 ______ RMB per hour will be imposed.

The above terms of the agreement between Party A and Party B **** with compliance, shall not be violated. This agreement in duplicate, A and B each party to sign a copy, with the same legal effect. After the end of the lease and the settlement of accounts, the agreement will automatically expire.

Attachment: site leasing generator fuel consumption registration form

Party A responsible person (signature): _____ Party B responsible person (signature): _____

Date: ______ year ______ month ______ day

On the bio-engineering generator leasing contract Part 3

Party A (lessee): Shaanxi Jiayilande Bioengineering Co. Ltd. Party B (lessor): Xi'an City, Weiyang District Weihong generator leasing services

A, B and the two sides through friendly consultations, on the lease of Party A to use Party B's generator set to reach the following agreement, enter into this contract *** with the observance of the implementation.

First, the number and type of rental generator set contract price:

The total contract price (including tax) is: RMB 10,000 yuan (¥ 10,000 yuan), generator for the rental fee, the automatic start cabinet for the purchase of party A. The contract price (including tax) is: RMB 10,000 yuan (¥ 10000 yuan), generator for the rental fee, the automatic start cabinet for party A purchase fee.

The above generator monthly rental fee has included generator set maintenance costs, workers' basic salaries, overtime, five insurance and one gold, wage subsidies, mobile construction allowances, rent subsidies, food and beverage, employee benefits, labor protection, taxes, profits, Party B management fees, unforeseen expenses, personnel transportation costs, security and all other costs.

Automatic start cabinet for equipment costs, installation costs, Party A to pay the purchase price of ownership belongs to Party A.

Second, the lease period:

Lease period from the generator set arrived at the use of the location of the installation is completed the next day after the start of the calculation (subject to the date of Party A's written confirmation), to Party A to transport back to the generator the day before the cut-off date for the lease period is tentatively set at one month (Party A fire acceptance of the completion of the lease is completed).

Third, the generator set of handover conditions:

1, Party A is responsible for the generator set to the use of transportation costs, responsible for the generator set to and from the lifting in place costs.

2. Party B is responsible for providing all the maintenance costs of the unit in operation.

Fourth, the use of the location:

Zhouzhi Jixian Industrial Park Shaanxi Jiayiland Bioengineering Co.

V. Rent, payment term and payment method:

1. Both sides agreed that Party A pays Party B seven thousand dollars before the generator is delivered.

2, the generator lease is completed, Party B provides all the invoices, Party A pays Party B the remaining three thousand dollars. 3, the lease period of one month, according to Party A fire inspection and acceptance of the completion of time shall prevail, less than one month or more than one month the total amount of the contract will not be increased or decreased. Sixth, the rights and obligations of both parties:

1. Party B sends management personnel to Party A to be responsible for the normal power generation of the generator set, Party B sends management personnel in the service period of the accommodation, food and transportation costs by Party B is responsible for their own.

2. If the generator set breaks down during the lease period, Party B is responsible for the repair and its cost. If the generator set has more than 3 times of downtime in a week for reasons other than the user, the generator set will be replaced.

3, due to the generator set itself failure downtime, time more than 24 hours, Party B should be within 24 hours of a unit of the same type to the use of Party A, replacement costs borne by Party B.

4, if the generator set failure during the lease period, Party B is responsible for the repair and its costs.

4, Party A is responsible for the diesel fuel and oil required for the generator set.

5, the lease period, Party A is responsible for the unit intact.

VII. Liability for breach of contract:

Any violation of this contract shall constitute a breach of contract, and the breaching party shall be liable for the breach of contract and compensate for the loss suffered by the contracting party as a result.

VIII. Dispute resolution

1, A and B friendly consultation;

2, according to the law to the people's court of competent jurisdiction of the location of the project.

IX. Contract termination

1, A and B consensus, you can terminate the contract. 2, one of the following circumstances, Party A, Party B can terminate the contract: (1) due to force majeure makes the contract can not be performed.

(2) the contract agreed to other circumstances of the termination of the emergence or legal provisions of the contract termination clause is established. 3, a party requesting the termination of the contract, should be in writing to the other party to send a notice of termination of the contract, the notice reaches the other party when the contract is canceled. Dispute over the termination of the contract, according to Article 8 of the agreement on the dispute.

4. The termination of the contract does not affect the effectiveness of the settlement and liquidation provisions agreed by the parties in this contract.

X. Other

1, the contract by the two sides to reach a friendly consultation on the outstanding issues of the supplementary agreement, the supplementary agreement and the contract has the same legal effect.

2, this contract in quadruplicate, A, B and each of the two sides of two copies, have the same legal effect. 3, this contract shall come into effect on the date of signature and seal of both parties. Lease is completed, the cost is settled, the contract is completed.

Party A: Shaanxi Jiayilande Bioengineering Co., Ltd. Party B: Weihong Generator Leasing, Weiyang District, Xi'an City

Signed on behalf of:

Date: 20__ Months Service Department

Bank of Account: Jianxing Bank, Xi'an City, Wenjing District Sub-branch

Account No. 6227078181009697

Account Name : Wen Yongjun Contracting Representative: Month, 20__

Date:

On the bioengineering generator leasing contract Part 4

Lessor: _______________________

Lessee: _______________________

The contract is signed at:

The two sides in a voluntary, equal, mutually beneficial basis, by consensus, on the party B to rent the party A diesel generator set matters, to enter into a contract:

Leasing equipment description:

Party A will be its legally owned diesel generator sets, diesel generator sets, **** units leased to the party B use.

Party A provides diesel generator sets of accessory content: start battery table, exhaust silencer system set.

The diesel generator set used fuel, cooling water Party B to provide their own, not in the scope of this contract lease.

Lease term:

The diesel generator set lease period *** days from the date of termination.

The lease period expires, Party A to recover all the equipment, Party B if you need to renew the lease, must be days in advance in the form of the Party A.

Rental payment:

The equipment days rent is RMB yuan.

The deposit of the equipment is RMB yuan, in the form of security.

Party B will pay the full rent before Party A provides the unit to Party B's site.

Use of leased equipment:

The environment where Party B uses Party A's diesel generator set must comply with the provisions of 2820-97. Party A and Party B **** the same to determine the installation location of the unit.

Party B is responsible for the equipment in and out of transportation, arrival lifting, installation wiring, wiring cable.

Party B, when using the equipment provided by Party A, the load shall not exceed the power value specified in the contract.

Party B shall not remodel the unit by itself.

Party B shall not sublet or sublet the unit without Party A's consent.

Rights and obligations of both parties:

Party A shall deliver the unit leased by Party B to Party B for use in accordance with the time specified in the contract.

Party A shall ensure the normal use of the unit and be responsible for the maintenance of the unit.

Party B shall pay the lease payment according to the time specified in the contract.

Party B shall take good care of the unit during the leasing period and prevent any man-made damage or harm.

When the unit enters the site of Party B, Party B shall be responsible for the safe positioning of the unit as well as its connection and dismantling.

Other terms:

This contract shall come into effect after both parties sign and stamp it.

This contract is in four copies, each party holds two copies, with the same legal effect.

Party A: Zhonglian Fenmali Motor Company Innovation and Operation Department Party B:

Seal: _______________________ Seal: _______________________

Date: _______________________ Date: _______________________

Phone: _______________________ Phone: _______________________

About the bioengineering generator rental contract Article 5

Party A:

Party B:

Because Party B construction needs, to Party A to rent a generator set. The two sides in good faith and the principle of mutual benefit entered into the agreement as follows:

1, Party A provides diesel generator sets leased to Party B use. (Note: the total value of the leased unit: )

2, the lease period of at least / day), the rent for / day / unit (capitals: yuan) (Note: the lease expires according to the actual number of days per day yuan / day / unit calculation)

3, the lease period without the consent of Party A, Party B shall not sublet, sublet, sale and purchase of the equipment. If there is a loss of items, Party B should pay the total value of the corresponding unit of liability.

4, the first use of oil during the lease by Party A is responsible for the oil to the replacement time by Party B is responsible for diesel fuel by Party B is responsible for, such as the quality of diesel oil provided by Party B diesel oil caused by the damage to the unit, by Party B is responsible for the corresponding responsibility.

5, the payment method: Party B prepaid a month's rent, to the same time the next month to collect the second month's rent, such as Party B did not pay the due date, Party A has the right to request to stop the right to use the generator set.

6, the equipment in and out of Party A is responsible for, Party B is responsible for paying the corresponding in and out of the cost.

7, the basic maintenance of equipment by Party A is responsible for Party B to ensure that Party A has two days per month unit maintenance time), it is strictly prohibited Party B overload operation of the generator set, such as Party B's personnel violations caused by the loss of generator set by Party B is responsible for.

8, equipment operation by the Quartet is responsible for the machine failure by Party A is responsible for maintenance (faults can not be eliminated within the day, Party A the next day to replace the generator set, to ensure the normal use of Party B).

9, the above unresolved issues, by the two sides of friendly consultation, if there are disputes by Party A court arbitration implementation.

10, this contract in two copies, by both sides of the B party.

Party A:

Representative:

Phone:

Year month

Day

Party B: Representative: Phone: Year day month

On the bioengineering generator lease contract article 6

Lessor: (Party A)

Lessee: ___ (Party B)

A, B parties According to the "Chinese People's * * * and the State Contract Law", signed the equipment leasing contract, and agreed on the following terms, * * * with the compliance with the implementation of:

A, Party A according to Party B's requirements and Party B's own selection of equipment and technical quality standards, on the leasing of Party B Party kilowatts of diesel generator set matters, enter into a contract.

Equipment Description: Party A will have its own kilowatt diesel generator sets leased to Party B to use. Containing unit KW units, storage batteries only, silencers only, oil and water separators, diesel generator sets used fuel. Coolant. Supplementary lubricants provided by the lessee (Party B), (to ensure the quality of lubricants, lubricants must be selected and Party A matching the same type of lubricants, can also be provided by Party A lubricants, Party B according to the final use of the number of payments to Party A). Air filter element, diesel filter element, oil filter element and Party A's regular maintenance of lubricating oil provided by Party A itself.

Second, Party A according to the equipment leasing contract signed with Party B, freight Party B bear.

Third, Party B to use Party A's diesel generator set of the environment must comply with the provisions of GB2820-97, there are necessary ventilation and rain cover measures, shall not exceed 80% of the nameplate rated power to use, (Note: when the individual motor power is greater than 55KW should be necessary to buck the starter or self-coupled starter, and greater than 55KW of the total motor power and shall not exceed 70% of the rated power, and need to be one motor by one, the motor should not exceed the rated power of the power of 70%, and the motor should be used for the motor to start. 70%, and need to start the motor separately one by one.)

Fourth, the generator set in the use of the process of faults should be found in a timely manner to stop and notify the Party overhaul, Party B to take care of the unit must be watched during operation, check the water level oil level in time to replenish the Party B shall not be forced to run with the fault, if the failure is due to the Party B reasons for the expansion of the Party B will be responsible for the responsibility of the Party B. The use of three-phase load balancing should be used. The use of three-phase load balance should be used, not missing phase use. Party B is responsible for the installation and use of the equipment. After the generator set arrives at Party B's site, Party B shall be responsible for lifting and loading. Party A shall be responsible for commissioning and maintenance. Party A is not responsible for the losses caused by the failure of the unit, the monthly equipment maintenance and repair time does not exceed 2 days, if 2 days can not be repaired, Party A can be arranged in advance for the replacement of the unit.

V. The ownership of the equipment during the lease period belongs to Party A. If Party B fails to fulfill the contract, Party A will not be responsible for the loss of the equipment. If Party B does not fulfill the contract provisions, lifting damage, overloading, rain, man-made damage, etc. Party B shall pay the price.

Six, in the lease period, the ownership of equipment belongs to Party A, Party B enjoys the right to use, Party B shall not sublet at will, shall not be transferred or mortgaged as property, shall not be added to or removed from the equipment, any parts and relocation of the installation site, for the operation of the Party B, the use of improper parts caused by the damage to be repaired or compensated for at the same price (including: pulling the cylinder, holding the axle, burnt tiles, oil injection pump jammed, oil nozzle burned, supercharger). Bearing burned, motor water, foreign objects into the motor sweep boring, phase loss, overload caused by the coil burned black, etc.).

VII, the lease period from the date of Party A goods to Party B, the lease period from January to Party B no longer use, a month for the minimum rental conditions, the monthly rent of $ integer, lowercase .00 yuan integer, the lease period exceeds the whole month, the part of the excess is individually calculated according to the unit price per day, the lease expires, Party A to retrieve all the equipment after the inspection of the equipment.

VIII. Rental settlement: according to Article ( one ) payment agreement.

1, Party B to Party A to pay the equipment prepayment of yuan, more refundable when the withdrawal.

2, the rent is paid in a lump sum according to the promised rental period, and the rent is calculated separately beyond the time.

3, Party B prepaid two months rent, rent paid monthly, shall not be overdue more than 7 days.

IX. All disputes about this contract, Party A and Party B should be resolved through friendly negotiation in accordance with the Contract Law of the People's Republic of China*** and other relevant laws. If the consultation fails, submit to the local court proceedings in Hantai District, Hanzhong.

X. This contract in two copies, A and B each party to implement a copy, A and B signed, stamped date of entry into force. (Fax the same legal effect)

XI, the above unit price such as invoicing plus 4.5% tax.

Party A (official seal): _________ Party B (official seal): _________

Legal Representative (Signature): _________ Legal Representative (Signature): _________

_________ ____ ____ _________ ____ _________ Day

On the biological engineering generator rental contract article 7

The lessor (hereinafter referred to as Party A): _______________

Lessee (hereinafter referred to as Party B): ______________ Project Manager Department

After the negotiation between the two sides, Party B to Party A to rent generator **** two, the model is __________KW for Party A __________ expansion project site use, in order to clarify the responsibilities and obligations of both parties to enter into this agreement.

Article 1 Party A's responsibility

1.1 Party A must provide Party B with a generator set with perfect performance to meet the needs of the site construction power supply.

1.2 Party A must be equipped with two qualified licensed operators, responsible for the maintenance and repair of the construction site unit to ensure that each unit operates normally, maintenance and repair costs by Party A is responsible for. On-site operators must comply with the relevant operating procedures and site rules and regulations, responsible for Party B leased generator defense, such as the site of the unit loss, damage, Party B does not bear any responsibility.

1.3 Party A is responsible for the proper custody of Party B purchased and transported to the site of the unit fuel (lubricating oil purchased by Party A), to ensure that the fuel is not lost, leakage; if lost, leakage, Party A at the price of the compensation, and bear all the losses caused to Party A.

1.2 Party B is responsible for the maintenance of the generator, and is responsible for the protection of the generator, such as loss of the unit, damage to the site.

1.4 Party A must comply with Party B's site unit fuel registration system, so that the unit is running normally, the fuel consumption is counted. Prohibit generators without load fuel consumption power generation; such as Party B unit without load power generation for more than half an hour, each found a fine of ________ yuan.

1.5 Party A is responsible for the entry of the unit, responsible for the safety of lifting and transportation of the unit, and Party A is responsible for the cost of lifting and transportation of the unit to the site.

1.6 After the expiration of the lease period, Party A must safely withdraw all the units leased by Party B from the site in one go within three days, and the appearance fee will be paid to Party A by Party B according to ______ RMB.

Article 2 Responsibilities of Party B

2.1 Party B is responsible for the leveling and stabilization of the site of the units. It is responsible for the meals and accommodation of the on-site crew management personnel sent by Party A.

2.2 Party B guarantees that the unit shall not be used in bad environment (e.g. storm). In the process of use, if there is a failure, timely notify Party A to repair, and shall not be disassembled at will.

2.3 During the lease period, the fuel oil consumed by the unit will be purchased by Party B and transported to the site, and Party A will be responsible for keeping it, and Party B will carry out sampling and verification at any time.

Article 3 Settlement Method

3.1 The lease period of the generator unit is _______ months, less than _______ months, the rent will be charged by day, and the lease time will be calculated according to the actual use time.

3.2 The rental period is based on the date of the unit entering the site and passing the test, the date of shutdown and use. The rent will be settled at RMB _______ per month for each 150KW unit, and the above rent has included the salary of Party A's operators and other expenses. Party A will receive the project payment with the tax-paid invoice.

3.3 After the signing of this agreement, Party B will pay Party A ______ RMB in advance as a deposit for the unit, which will be offset against the corresponding amount of rent at the time of settlement.

3.4 Each generator provided by Party A must meet the electricity needs of Party B's construction site. If Party B's construction site is down for more than one hour due to Party A's or the generator's failure, etc., a fine of ________ RMB per hour will be imposed.

The above terms of the agreement between Party A and Party B **** the same compliance, shall not be violated. This agreement in duplicate, A and B each party to sign a copy, has the same legal effect. After the end of the lease and the settlement of accounts, the agreement will automatically expire.

Attachment: site rental generator fuel consumption registration form

Party A responsible person (signature): _____ Party B responsible person (signature): _____

______ ______ ______ ______ ______ ______ ______ ______ ______