Project construction management implementation plan is for a project to carry out construction plans, is a kind of enterprise operation and management of a project, is in order to better the company's project to do a big initiative, the following is my compilation of engineering project construction management implementation plan, welcome to refer to.
Part 1: Engineering Project Construction Management Implementation Program
In order to strengthen the project management of primary and secondary school construction projects, clear objectives and responsibilities to ensure the smooth implementation of engineering construction projects. According to the Ministry of Education, the State Planning Commission, the Ministry of Finance issued a "national primary and secondary school project implementation and management approach" notice requirements, combined with the actual situation in our region, the development of school construction project management implementation, and hope to follow.
First, the organization
The establishment of the Anju District Education Bureau project construction project leading group.
Leader: Lu Jun
Deputy Leader: Liu Hong Peng Zhehua
Members: Yu Dingfu Chen Zhaoguo Yang Jian Zou Yuanfu
The project schools to set up the corresponding project construction project leadership group.
Second, the project construction implementation procedures
Engineering construction project procedures must be carried out in accordance with the requirements of existing laws and regulations.
1, the project. By the school to the District Education Bureau to write a project application? District Education Bureau to the Development and Reform Commission issued a letter? Development and Reform Commission issued a project approval.
2, planning. Schools to provide overall planning and preliminary design of the proposed building (building level, elevation, section) and effect diagrams submitted to the District Planning Bureau for approval, qualified for planning permission (copy) and issued red line map.
3, construction. After the planning permit, to the Construction Management Unit of the Construction Bureau to report construction, provide information related to construction, fill out the construction report form.
4, survey and design. Earthquake damage for the degree of light by the original design unit issued by the reinforcement measures; seismic damage to a greater extent by the identification of qualified units issued by the identification of the conclusions issued by the design unit issued by the construction drawings; belonging to the new construction project commissioned by the school survey unit issued by the survey report, design unit issued by the construction drawings; construction drawings ready after the need to fire brigade to the district fire audit; commissioned by the Construction Drawing Review Company to review construction drawings and issue a construction drawing review report. Construction plan review report, and then to the District Construction Bureau Construction Management Unit to do construction plan review for the record.
5, the bidding process: to determine the agency: to the Development and Reform Commission for bidding agency online selection, agency online registration, invite relevant personnel (Supervision Bureau, Development and Reform Commission, the Construction Bureau bidding office, the Education Bureau Supervision Unit and the Finance Unit of the relevant personnel) to attend the agency randomly selected meeting, randomly determine the two agencies, and the two agencies on the operating procedures and costs and other issues. Negotiations, determine the agency, and to the Development and Reform Commission, Construction Bureau Tender Office for the record.
Bidding process: by the agency or hire a qualified costing agency to calculate the amount of work, financial evaluation to determine the control price and bill of quantities (by the school to the Education Bureau to write a review application, the Education Bureau to the Financial Services Bureau evaluation center letter, the evaluation center acceptance of the completion of 25 working days after the control price and the list of bidding must be subject to the conclusions of the financial evaluation), the production of bidding (than the election) announcement, bidding pieces For the record (Development and Reform Commission and the Construction Bureau), online publication of the tender notice or selection announcement, registration, issuance of tender documents, inviting the relevant departments (Discipline Inspection Commission, Development and Reform Commission, the Construction Bureau Bidding Office, the Education Bureau monitoring and financial unit relevant personnel) to participate in the opening of bids, bid evaluation and supervision, evaluation of the results of the bidding publicity, issuance of the notice of award, the construction unit to issue a performance bond or payment of the performance bond, the signing of the construction contract and for the record.
6, construction phase: determine the supervision unit signed supervision contract, to the Construction Bureau Bidding Office for the bidding for the record, to the Construction Bureau Construction Management Unit for construction permits (in accordance with the list of information required to provide information directory to provide information and pay the relevant fees), for quality and safety supervision procedures (pay the winning bid price of three and a half thousandths of the supervision fee), the Planning Bureau of the release line, the commencement of work, the construction of implementation of the process of quality, progress, Safety supervision and coordination of various relationships, preliminary inspection, completion and acceptance.
Third, the project funding management
Project implementation of county-level reporting system, according to the amount of work to pay for the project. Project special funds for the purpose of including planning fees, design fees, ground investigation fees, supervision fees, all kinds of fees, project payments, project volume increase or decrease and work expenses and all other costs, shall not exceed the upper limit. The unauthorized expansion of the construction scale, increase the construction standard, according to the relevant provisions of the country.
Strict contract management. The implementation of bidding for the project, the contract must be in accordance with the bidding pieces and the winning bidder's bid pieces to enter into a written contract, shall not be entered into a separate deviation from the bidding pieces and the winning bidder's bid pieces of the substantive content of other agreements. The contract shall be sent to the District Development and Reform Commission, District Construction Bureau bidding office for the record. If there is a need to enter into other agreements, before signing, need to be led by the project construction leading group, in conjunction with the District Supervision, Development and Reform Commission, Bidding Office, Finance, Audit and other departments for collective discussion agreed, and the formation of the minutes of the meeting as a basis for the signing of other agreements. Without the above units *** with the decision, and adjust the unit price of violation of the bidding results, the conclusion of other agreements are invalid.
Fourth, the project quality and safety management
The quality of the project is to determine the success or failure of the construction of the project is the key to the quality of the quality of the project directly affects the use of the completed project. The quality of engineering construction, affecting the construction, construction unit's reputation, efficiency. Control the quality of engineering construction is the focus of the work of the parties involved in the construction, but also the parties involved in the construction of *** with the responsibility. As a construction unit, should be centered on quality control, always the quality of the project as the focus of the project construction management, consciously accept the supervision and inspection of the quality supervision agencies, coordination of design, supervision and construction units, through the control of the project planning, design quality, bidding and tendering, validation of major technical programs, quality control of the construction phase, information feedback and other aspects to achieve the purpose of controlling the quality of the project The quality of the project will be controlled Strictly in accordance with the laws, regulations and relevant technical standards, design pieces and construction contracting contract on the construction unit in the construction of quality and safety supervision and management, urge the construction unit in accordance with the construction plans, supervision units to conscientiously perform their duties, and resolutely put an end to unsafe construction behavior. For those who refuse to correct, they should be penalized and reported to the relevant departments in accordance with the contract and relevant regulations.
During the implementation of the project, the Education Bureau will send inspection teams from time to time to carry out inspections, and the results of the inspections will be informed. At the following stages, the leading group of engineering project construction will be involved: basic groove inspection, preliminary inspection, completion and acceptance.
V. Engineering change management
The following provisions for the implementation of the change process.
1, the construction unit of the project proposed design changes, should be made in conjunction with the supervising engineer to propose changes to the program, sent to the design unit for review; design unit review agreed to be approved by the Ministry in charge of education, by the supervising engineer to the construction unit to issue a change in the notice of the construction unit to change the construction unit according to the change of the drawings of the construction unit to organize the construction.
2, the construction unit proposed design changes should seek the consent of the supervising engineer and the design unit review agreed to report to the construction unit for approval before implementation. If this leads to an increase or decrease in the construction period, the two sides in advance written agreement, but the construction unit for the organization of construction needs and other reasons for the proposed changes, the increase in costs borne by the construction unit.
3, in the construction of the design drawings if there is an error or changes in geological conditions and other changes need to be made by the design unit to put forward a change program, and agreed by the construction unit visa, the construction unit to obtain the revised drawings according to the instructions of the supervisory engineer to organize the construction of the construction, which increases the costs borne by the construction unit, the construction period will be extended by the delay.
All the changes in the perfect the above procedures, need to obtain the consent of the project construction leading group and record.
Strengthen accountability. Engineering changes and hidden engineering visas there are fraudulent or irresponsible work leading to the loss of project construction funds, should be held accountable for the responsibility of the relevant personnel. Should be preserved information is not properly preserved or supervision, design, intermediaries and other units of fraud, according to the relevant provisions of the state to deal with penalties.
Six, project settlement management
The entire volume of work includes the following parts: ① fixed part: the tender pieces of the bill of quantities of all the contents; ② increase or decrease part: according to the contractor and the design needs to be changed, affecting the volume of work increases or decreases; ③ accessory and ancillary works part. Both sides to verify the amount of work, must be signed by the construction, construction, the owner of the tripartite signature recognition and reported to the project construction leading group signed the consent, can be used as a basis for calculating the cost of the project.
After the determination of all the quantities of work, the preparation of the two sides recognized the cost of construction project settlement, the organization involves all the relevant information on the cost of the project. By the school to the project construction leading group for audit, to audit the results of the audit to the District Audit Bureau for audit, to audit the cost of the project for the final price of the project payment, the financial sector according to the audit pieces of the total cost of the project implementation.
VII, engineering data management
Complete engineering technical files and construction management data is an important basis for engineering construction and management and information resources, but also the completion of the construction project acceptance and smooth delivery of the necessary conditions for use. Engineering construction files filed in detail see the list of archival materials of the District Construction Bureau.
Eight, engineering discipline
Supervision to participate in the construction of the project units to regulate the construction behavior, strengthen the practitioners of cleanliness and self-discipline and to put an end to the phenomenon of discipline and lawlessness, to ensure that clean and efficient to carry out the construction of the project to make a specific commitment to broadly accepted by the masses and all parties to the supervision. Strict implementation of bidding procedures to achieve open, fair and just ? Sunshine operation? , put an end to unfair competition. Make into an economic project, assured that the project, practical engineering, honest engineering.
The project in the implementation process, accept the supervision, Development and Reform Commission, finance, audit, education department in charge of the special inspection, if found to have violations of law and discipline, will be dealt with in accordance with the relevant provisions; the circumstances are serious, will be transferred to the judicial organs.
Article 2: Software System Project Implementation Program
Construction of xxxxxxxxxxxxxx software procurement is a complex, long-term systematic project, in order to ensure that the project can be successfully implemented, it is necessary to develop a scientific, reasonable and practical implementation plan. On the one hand, we must implement from the organization, set up a strong project leadership team and experienced project implementation team; on the other hand, we must develop a strict timetable, clear time for each milestone. At the same time, we also need to develop working principles to guide the full implementation of the project.
First, the principle of project implementation
1. Members of the user side of the project team, strive to participate in the whole process of the project
The user side of the establishment of the leadership of the project team in person, in the research, design, coding, installation and debugging, testing, training, operation, acceptance, after-sales service, and other projects at all stages of the project, with the system developers to work with the work of the one hand, on the one hand, you can train their own technical maintenance team, for the use of the system, the system will be able to provide a more efficient and effective way of maintenance. Technical maintenance team for the use of the system escort; on the other hand, in the development process, the coordination of the user side and the development of the relationship between the user side and the development side, to ensure the smooth progress of the project, timely detection of problems, and supervision of the project progress and quality.
2. Adopt? Two hands grasp? approach, one hand to grasp the development, one hand to grasp the use of
For software projects, the reason why it is called a project, to a large extent, because the construction of software projects, in addition to technical factors, there are many non-technical factors need to be taken into account, and must be taken into account. Measure the success of a software project, to a large extent, is not to see how advanced technology used in this software project, but whether the software is practical for the user, whether it can help users to solve many of the expected problems. The failure of many domestic software projects, to a large extent, is not enough to use the grasp. Suggested in the trial run of the project in the process of grasping the system maintenance at the same time, but also to pay close attention to the use of the system, the development side and the user side of a concerted effort to help business people from the original manual processing to computer-assisted processing, in the process of adapting to the computer-assisted business processing of business people as early as possible in the process of discovering the problems in the system, so that the system can maximize the possibility of completing the system of quality and quantity on time.
3. Data and procedures are equally important
The construction of the system, data is located in the primary position, the completion of the preparation of the program, only means that the system is completed in half, the collection of data, sorting, entry, the construction of the system is equally important. In the process of project implementation, we must pay attention to the entry of data in the system, fully estimate the difficulty of data processing, at the beginning of the construction of the system, the data work on the agenda, arrange for the appropriate funding, time, etc., the data work in practice, the only way to strive for the system to achieve early practical.
Second, the overall project to promote the plan
In order to effectively ensure the quality of system development, the entire process of system construction is divided into preparation, design, development, implementation and operation phase, each phase to complete the corresponding tasks to ensure that the information system construction.
1. Description of quality assurance activities in the implementation process of the system
In the implementation process will occur during the major quality assurance activities or the resulting quality records and products that will be generated, project management and development phase is closely related to the stage of the division, and therefore, mainly in accordance with the specific stage of the project implementation of the division of the description.
2. Demand analysis stage
First of all, the need for coordination between the two sides, the formation of the "Demand Research Plan" and "Demand Research Outline", to determine the preparatory work, the content of the demand for research, methods and methods, as well as personnel and scheduling and other content, agreed to by both sides according to the plan to start the research. Before the formal start of the research project development team should check that all the necessary preparations have been successfully completed.
The project development team according to the actual technical requirements of the system and the business needs of each subsystem in the research, write and submit to the project leadership team to meet the requirements of CMM LEVEL 3 specifications of the "System Requirements Analysis Report", and by the project team to evaluate the unqualified part of the further improvement of the research; after the evaluation of the two sides **** with the signing of the evaluation opinion, and formally come into effect.
For the software production process, the demand phase is the most important stage of the process, the results of the demand analysis will directly lead to the success of the project, so the cooperation between the two sides in this phase of the more investment is worthwhile. And once the review is passed and effective, the requirements report will become the system design, development, testing, implementation of the trial run and project acceptance of one of the basic basis, so in principle, the user demand will no longer be changed because of other factors, such as the need for such changes, need to be determined by the two sides of the project manager consultation.
3. Overall design phase
The project development team through the functionality of the system, operation and performance requirements to be analyzed, resulting in a high-level system structure, software structure, interface and data format design, and submitted to the project leading group, "System Design Report" (including database design), the organization to evaluate and sign the evaluation opinion. Further improvement and re-planning of the part of which the evaluation is not qualified, after the evaluation is passed by both parties *** with the signing of the evaluation opinion, and formally come into effect, as the basis for subsequent software development and testing. Changes in the content of the report by the two sides of the site implementation of the person in charge, the person in charge of technical exchanges can be determined, and need to report to the project leadership team.
4. Detailed design stage
The project development team in the "system design report" on the basis of further analysis and refinement of functional and performance requirements and the detailed design of the software documented to the leading group of the project to submit the "system detailed design report", and by the project team to organize the review and sign the review. The part of the evaluation failed to further improve and re-planning, after the evaluation passed by both parties **** signed the evaluation opinion, and formally effective, as the basis for subsequent software development and testing. Changes in the content of the report by the two sides of the site implementation of the person in charge, the technical director of the exchange can be determined, and need to report to the project leadership team.
5. System development phase
According to the previous design results, the two sides of the site implementation of the person in charge, the technical director of the discussion to determine the details of the development plan, and to the project leadership group to submit the "project development plan"; engineering leadership group on the "project development plan" review, signed by both parties to formally enter into force, and will be used as a software development stage of the project management and monitoring The basis of the project development team should be strictly according to this plan to control the progress of the project, on time to the engineering leadership team to report on the progress of the work.
In order to enable users to be informed of the progress of the project, the development team needs to submit a weekly "Project Customer Weekly Report" to the relevant leaders of the user, the user's project team can check the project's work at any time.
Article 3: Creation of the project implementation program
A project overview
(a) the basic situation of the project construction
1, the project name: Sixty pave the town of Zhaozhuang Village, high-yield demonstration of wheat to create a demonstration piece of the project.
2, construction unit: yingshang county sweet potato planting professional cooperative.
3, the project legal person: Zhu Liang
4, the competent unit: yingshang county agriculture committee yingshang county finance bureau
5, the proposed location: yingshang county sixty store town.
6, the main construction content of the project: ① purchase of large-scale pan-type water and fertilizer sprinkler equipment; ② purchase of underground pipelines; ③ purchase of underground cables and take over, electricity and water meters, etc.; ④ purchase of underground pipes; ⑤ installation of agricultural power facilities; ⑥ purchase of tractors, rotary ploughing machines, deep pine machine and other ancillary equipment; ⑦ purchase and construction of other ancillary equipment.
7, construction period: February 2014?December 2014.
8, construction goals: create wheat high-yield demonstration piece 10640 acres, mu yield target 600 kilograms, and planting large joint within the county to implement the transfer of land and intensive management, order production to establish a wheat seed breeding base of 30,000 acres, of which 6,000 acres of land transfer. Build marketing service system. Directly absorb the employment of 40 people, benefiting the population of more than 3,000 people.
9, the expected benefits: after the completion of the project, through the creation of high-yield wheat, seed breeding, base promotion, the comprehensive annual income of 2 million yuan, after the implementation of the project, can directly absorb the labor force of 40 people, the benefits of the population of more than 3,000 people, the average household income of more than 2,000 yuan. In addition, it can also activate the development of other related industries, the comprehensive economic benefits are very considerable. Can form a certain radiation effect on the surrounding area, covering the ability and scope of Yingshang County, sixty stores around the township (town).
(ii) project construction background
Wheat adaptability, strong reproduction, cultivation is simple, less input, high yield and stable harvest, is the main planting crops in our county. In recent years, with the continuous progress of agricultural science and technology, the promotion and application of new wheat planting technology, so that the yield of wheat continues to improve, in order to further develop the wheat planting industry, to drive the project area farmers to get rich and run to the well-off, the cooperative plans to build in Yingshang County, the thirty pavement construction of the sixty pavement town of Zhaozhuang village to create a high-yield demonstration piece of wheat.
(C) the necessity and basis of the project construction
1, the national industrial policy: six consecutive years of the Central Document No. 1, the application of new agricultural technologies and food production, placed in a very important position. 2014 the State Council issued "the State Council on accelerating the development of the modern crop seed industry views" (Guofa [2014] No. 8 document), the Anhui Provincial Government has also followed the corresponding documents, to the seed industry. The corresponding documents were issued, pushing the development of the seed industry to a strategic height.
2, resource advantage: since the establishment of the cooperative, relying on the Anhui Province Fuyang Yongxiang seed service limited liability company to the application of new agricultural technologies and seed breeding as the main business grasp. The company led by the demonstration garden guidance, led by the processing plant in the surrounding villages, the establishment of more than 20,000 acres of high-quality wheat, wheat seed (original seed) breeding base. Annual production of more than 20 million jin of seed, this base can drive more than 8,000 households, each household annual income of 1,200 yuan, per capita income of 200 yuan. 2014 company to promote new varieties, new technologies totaling 27, the radiation surrounding the five townships area of 100,000 acres, creating a social benefit of more than 100 million yuan. At the same time, the company also vigorously develop organic products in the base, in 2013 the company to the association as the main body, applied for certification of organic products certification, in 2013 officially obtained the certificate. Now the company is guiding the base to breed good seeds at the same time, guidance to drive the planting of organic products, so that the company's organic production to form a scale, the formation of a benign industrial chain.
3, the role of economic development and farmers to increase income: sixty store town Zhaozhuang village to create wheat high-yield demonstration film was built, can drive the project area and the surrounding farmers to develop wheat planting industry, increase farmers' income. Cultivation of wheat less input, more output, labor-saving, time-saving, versatile, easy to process, is the pillar of foreign exchange earning agriculture. The establishment of a sound wheat seed breeding and promotion system, the increase in wheat production, but also will strongly promote the food industry, pharmaceutical industry, brewing industry, the rapid development of the food industry.
Second, the construction content
① purchase of large-scale pan-type water and fertilizer sprinkler equipment; ② purchase of underground pipelines; ③ purchase of underground cables and take over, electricity and water meters, etc.; ④ purchase of water pumps and pipelines; ⑤ installation of agricultural facilities; ⑥ build electronic microcomputer management room (70 square meters); ⑦ purchase of Internet of Things supporting equipment; ⑧ other supporting equipment.
Third, the project market analysis
1, the project through the creation of wheat high-yield demonstration, seed breeding, base promotion, comprehensive annual income of 4 million yuan.
2, the wheat market is very broad, is China's most widely distributed food crops, since ancient times is to nourish the human body important food. "Materia Medica Gleanings" recorded: ? Wheat flour, tonic deficiency, solid human skin and body, thick stomach and intestines, strong gas.? Wheat contains about 75% of carbohydrates and 10% of protein. The Materia Medica Revisited summarizes its functions into four: nourishing the heart, benefiting the kidneys, harmonizing the blood, and strengthening the spleen. "Medical Forest Compendium": in addition to annoyance, stop bleeding, facilitate urination, moistening lung dryness for menopausal women, the consumption of unrefined wheat can also alleviate menopausal syndrome.
3, the main product market positioning and competitiveness of China's accession to the WTO, in the international market in the popularity of seven products, wheat accounted for two kinds of: one is wheat flour, the second is the medicinal, miniature, specialty wheat. Therefore, the development of wheat seed breeding and production base has a broad market prospect. The company actively adopts ? The integration of agriculture and industry, production, supply and marketing of a dragon? Industrialized integrated marketing strategy, adhere to the high-yield research strategy, efficacy priority strategy, brand enhancement strategy and stimulate the source strategy development model.
Fourth, the work measures
(a) strengthen leadership, carefully organized
The project implementation program is a strong policy, related to the immediate interests of farmers in the county. In order to strengthen the organization and management, to ensure that the implementation of the program work in accordance with the quality, quantity, on time in place, so that farmers really get the benefits. Cooperative research decided to set up sixty store town Zhaozhuang village wheat high-yield demonstration piece to create the project leading group, led by Zhu Liang as leader, project manager Zhang Jixian as deputy leader. The leading group set up an office, Zhu Liang also served as director of the office, the office is located in the cooperative office building, is responsible for the organization and preparation of the project implementation program, project construction during the construction of engineering design, construction, supervision, instrumentation and equipment purchases, procurement and other management and day-to-day affairs.
(B) strict project management
In the project construction, according to the higher management methods, combined with the actual cooperative, the establishment and improvement of the project management system, so that the project management system, standardization.
1, the implementation of the project legal person responsible for the system. Cooperative chairman as the project responsible for legal person, fully responsible for the implementation and management of the project, the planning and design of the construction project, project progress, project cost, financial management and the use of funds is responsible.
2, strict financial management. In the process of project implementation, project fund management in strict accordance with the Yingshang County Agricultural Committee, Yingshang County Finance Bureau and other relevant provisions of the higher authorities. The entire project funds to implement unified planning, unified management, unified deployment, the establishment of a special account, dedicated financial management system, earmarked, strictly prohibit the squeeze, misappropriation, retention, to take the reporting system, the implementation of a pen for approval, strictly according to the project investment plan and the progress of the construction of the project in phases and stages of the construction of the funds allocated and regularly check the funding activities, found that the problem of timely processing, to ensure that the use of special funds is reasonable, to produce the Maximum investment effect.
3, strict quality control of the project. First, the engineering construction of the project should adhere to the principle of first survey, after the design, and then construction, supervise the construction unit in strict accordance with the design drawings construction standards for construction, and supervise the construction unit to establish and improve the project quality assurance system, on-site engineering quality self-inspection system, the important structural parts and hidden engineering quality pre-inspection and re-inspection system. Second, the implementation of engineering supervision system. County project leading group selected supervisors, in accordance with the relevant laws, regulations, standards and technical specifications of engineering construction and supervision, the quality of the project, investment in the use of construction progress and other elements of tracking management. Thirdly, we strictly control the quality acceptance of the project, strictly audit the project cost and quality, and consciously accept the supervision and inspection of the county discipline inspection committee, the county audit bureau and all relevant departments at the higher level. After the completion of each project, the company organizes the relevant units to self-check and self-test, and the project settlement implements the quality veto. Unqualified projects put forward rectification requirements, deadline for rectification; qualified projects on the project profile, funds in place, the use and financial management, civil engineering, acquisition of instruments and equipment, system construction, operating procedures and archives, project implementation and operation, project effectiveness and construction effects, etc. to make a scientific, reasonable and legitimate evaluation, write a completion and acceptance report, to meet the acceptance.
V. Supporting funds
1, investment estimates: total project investment of 567,500 yuan, the financial input of 500,000 yuan, the cooperative self-financing 67,500 yuan.
Six, the project was completed after the benefit analysis
(a) economic benefits
After the completion of the project, through the creation of high-yield wheat, breeding, base promotion, the comprehensive annual income of 2 million yuan after the implementation of the project, the company to take the organization of poor farmers to participate in the base of the production can be directly absorbed by the labor force of 40, the benefits of the population of more than 3,000 people, the average increase in income per family 2000 yuan or more.
(ii) social benefits
Can activate the development of other related industries, the comprehensive economic benefits are very considerable. Can form a certain radiation effect on the surrounding area, covering the ability and scope of Yingshang County, thirty stores around the township (town).
(C) ecological benefits
The project construction will greatly promote the development of good wheat cultivation, and then drive the development of related industries. This project is a wheat seed breeding and base promotion project, which will not affect the ecological environment.
(This article material from the network, if any infringement, please contact to delete.)