Seek God Laboratory infrastructure Construction drawings and various aspects of the notes

No laboratory on the professional design institute throughout the design of new construction; has built a laboratory of clear water room can work in accordance with the following aspects.

I, infrastructure,

1, design and construction drawings finalized: water pipelines, drainage pipelines, two-phase and three-phase power wiring distribution, gas distribution, exhaust emissions system;

2, floor, wall, ceiling and other parts of the decorative level, careful selection of materials;

3, laboratory tables, reagent cabinets, medicine cabinets, fume hoods and other office furniture Matching chart.

Two, equipment selection and positioning

1, according to the laboratory analysis scope of the selected equipment, the name of the equipment, functional use, size, voltage, current, water and gas demand list;

2, based on the above list of arrangements for the location of the equipment, supporting the corresponding peripheral conditions, corresponding to the list of demand for the implementation of one by one;

3, optimize selection Positioning, the final formation of the equipment site layout drawings

Third, notes

1, the professional design institute throughout the design of new construction can also refer to the above content;

2, according to the design and construction standards and norms for the work, in particular, supporting the water, electricity, gas and pharmaceuticals to meet the relevant requirements;

3, the completion of the field of the above work, the stand-alone trial and Linkage operation in accordance with the project.

The above is only a personal opinion, please select after screening.