The heat source unit referred to in these measures, refers to the heat supply unit for the production and provision of thermal energy units.
The measures referred to in the heat supply unit, refers to the use of heat source unit to provide thermal energy to engage in urban heating business unit.
The user referred to in these measures, refers to the use of urban heat supply units and individuals. Article 3 These Measures shall apply to the planning, construction, operation, use and management of urban heat supply within the urban area of Hangzhou. Article 4 The administrative department of urban heat supply of Hangzhou is responsible for the management of urban heat supply. Article 5 The urban heat supply shall adhere to the principles of developing centralized heat supply, restricting and transforming inefficient and polluting decentralized boilers for heat supply, and implementing unified planning, industry management and multiple operation. Chapter II planning and construction of Article VI of the city heat supply planning should be included in the city's national economic and social development planning, and urban master planning and coordination.
City heating planning, urban heating by the city administrative department in charge of planning, planning and other relevant departments **** with the preparation, and in accordance with the prescribed procedures for approval. Article 7 in the urban heating planning area, with urban heating conditions in the area, no more new coal-fired, oil-fired decentralized boiler heating facilities; new construction, alteration and expansion of public **** building, industrial buildings and high-rise residential areas, should be arranged at the same time the construction of urban heating facilities.
The existing decentralized boilers in the urban heating planning area, with urban heating conditions, should be gradually transformed in accordance with urban heating planning, the implementation of urban heating. Article VIII of urban heating facilities design, construction, supervision units must have the qualification conditions prescribed by the state, and in strict accordance with the relevant national technical specifications and standards for implementation.
Heating project construction quality supervision, in accordance with relevant state regulations. Article IX city heating project completion, shall be in accordance with the relevant provisions of the state acceptance, acceptance of qualified, before operation and use, without acceptance or unqualified acceptance, shall not be put into use.
Urban heating facilities after acceptance, the relevant information should be sent to the city according to the provisions of the archives archived. Chapter III Facility Management Article 10 The urban heating facilities referred to in these measures, refers to the urban heat production, transportation, utilization of various equipment used and its ancillary facilities. Article XI heat source units, heating units, users of urban heating facilities, appliances must be selected in accordance with the relevant national technical standards of qualified products, including pressure piping components manufacturing unit must be held at or above the provincial level boiler and pressure vessel safety supervision and administrative departments issued by the "Pressure Piping Components Manufacturing Unit Safety Registration Certificate". Article XII of the user demolition, relocation and transformation of its ownership of the heating facilities within the scope of the application should be made to the heat supply unit, the heat supply unit to organize the implementation. Article 13 Within 1.5 meters of the outer edge of the urban heat supply main network and its ancillary facilities, the following acts affecting the safety of urban heat supply facilities shall not be carried out:
(1) construction of buildings and structures;
(2) excavation, drilling, piling, and burying of poles;
(3) blasting operations;
(4) piling up of garbage, sundry things, and discharge of sewage and wastewater;
(5) removal and alteration of heat supply facilities within their ownership shall be organized and implemented by the heat supply units. /p>
(e) other acts affecting the safety of urban heating facilities. Article 14 for urban construction needs in the city heating facilities within the scope of safety protection of construction and excavation of roads, the construction unit should be to the heat supply unit to find out the heat supply facilities. For construction that may affect the safety of heating facilities, the construction unit shall go to the heating unit for safety supervision procedures, construction, protection programs; heating unit shall be sent to supervise, to ensure the safety of heating facilities. Article XV of urban heating facilities ownership division, repair and maintenance responsibilities, determined in accordance with the following provisions:
(a) heat source unit plant planning red line within 1 meters of the heat supply facilities are owned by the heat source unit, and is responsible for the repair and maintenance;
(b) the heat source unit plant planning red line 1 meters outside the user's first valve of the pipeline network of the heat supply facilities are owned by the heat unit, and is responsible for the repair and maintenance. And it is responsible for the repair and maintenance;
(C) the first valve of the household network and indoor heating facilities are owned by the user, and is responsible for the repair and maintenance, can also be entrusted to the heat supply unit repair and maintenance for a fee. Chapter IV heat management Article XVI engaged in urban heating business units, shall meet the conditions set forth in relevant laws and regulations, and according to law for business registration. Article XVII of the heat source units, heat supply units should comply with the mandatory standards for heat supply facilities heat utilization, to ensure the quality of heat supply, and strengthen the operation and management. Article XVIII of the heat source units, heat supply units shall strengthen the construction and management of pipe networks to ensure safe and continuous heat supply, shall not stop heating without reason.
Due to urban construction, heating facilities construction, maintenance and heat source unit maintenance equipment and other reasons need to reduce heat supply or stop heating, heat source unit, heat supply unit should be 72 hours in advance to inform the user; due to sudden failure to stop the heat supply, the heat supply unit should be immediately repaired, and promptly notify the user. Chapter V Management of heat Article 19 The need for heat users, should apply to the heat supply unit for application procedures. Qualified, the heat supply unit and the user signed a heat supply contract, clear rights and obligations of both parties. Heat supply contract should include the heating method, quality of heat supply, the nature of heat, quantity, duration, charges, payment time limit, settlement, security responsibilities, maintenance responsibilities and liability for breach of contract.