Hangzhou does not need to apply for a planning permit.

The following construction projects do not belong to the scope of planning management and do not need planning permission:

1, interior decoration works without increasing the building area and changing the building facade;

2. Install underground structures connecting municipal pipe network facilities, septic tanks, sewage treatment tanks and other ancillary facilities;

3, does not increase the construction area, does not affect others' property rights of green planting structures;

4. There are no independent telecommunication facilities, radio transmission facilities and non-operating small distributed photovoltaic facilities;

5. Maintenance, reinforcement and reconstruction of municipal roads, bridges and dikes;

6, urban traffic management equipment and road traffic facilities installation, maintenance and other municipal facilities;

7, street lamps, road signs, road signs, garbage bins, roadside sketches and lighting, flagpoles and other facilities;

8, within the scope of land for construction projects, temporary construction due to construction needs and temporary construction that has obtained temporary construction land planning permit;

9. Set up public bicycle kiosks, newsstands, bus stops (kiosks) and public telephone booths;

10, set up various signs, marking lines, boundary markers, monitoring and monitoring facilities;

1 1. The underground garage is equipped with a fence door (security door), a motor vehicle door and an installation door;

12, building facade erection of non-floor sunshade (rain) canopy, and the lower edge height is not less than 240 cm, the cornice width is not more than 80cm;; Telescopic flower racks, clothes racks and fixed flower racks, and the width of the hanging part is not more than 80 cm; Wrap the cage (security window), and the widest part of the overhangs shall not exceed the building facade.

The following construction projects are exempted from the construction project planning permit:

1, install elevators in old communities;

2, organized and implemented by the government, in line with the "three noes" principle of "not exceeding the land area and construction area specified in the state-owned construction land use right certificate and the house ownership certificate, not changing the original purpose of the house, not breaking through the original construction area and the original building height", C-and D-level dangerous buildings are multi-belt reconstruction projects;

3. Temporary sales offices within the land used for construction projects;

Infrastructure construction such as iron tower, computer room and pipeline involved in the construction of 4.5G base station.

The competent department of city planning and natural resources can dynamically update and maintain the list of exemption or exemption without handling the construction project planning permit according to the reform requirements of "decentralization, strengthening supervision and improving services" and relevant national policies. This notice shall be implemented as of April, 2002 1 and1.