One, seriously improve the installation of the preparatory stage of the safety of technical work. Before the construction must be prepared to install the project construction design or construction program, the program should be specific targeted safety and technical measures. The construction site of the surrounding environment, to seriously carry out safety inspections, targeted preventive measures. In the installation of the construction range of holes, pits, edges, edges, lifting mouth edge, there should be a fixed cover, protective railings and other protective measures of the obvious signs. Unsafe hazards must be eliminated, otherwise the installation work can not be carried out. Seriously improve the safety education and safety technology delivery work. Where civil engineering, lifting, installation and other units in the same site construction, must strengthen leadership, close cooperation, to achieve unity of command, *** with the formulation of measures to ensure safe construction. Cross-operation, must set up safety nets or other isolation measures. When engaged in anticorrosion, radioactive and toxic and harmful operations, the construction should be carefully checked before the protective measures. Whether the labor protection supplies are complete. To be equipped with a certain number of experienced scaffolding workers to build shelves, but also to make some tool-type movable platform installation frame.
Two, equipment lifting to have lifting program, calculate the weight of the equipment, in order to correctly select the lifting machine and lifting method. Sometimes there is no nameplate equipment, do not know its weight, must be calculated before lifting, do not blindly choose.
Third, to improve the equipment installation process around the hole protection, to be full of scaffolding boards or cover the fixed cover, installation and removal, do not paralyze. In the process of installing equipment, where more than 2m above the work, there is no safety protection around the safety belt must be fastened.
Four, in the excavation of pipe trench earth, must be in accordance with the provisions of the earth construction safety technology. Where the depth of more than 1.5m, must be sloped or add reliable support, pipe trench earth excavation and buried pipe, try to rainy season before the arrival or after the rainy season, and focus on the fastest possible speed to get it done, in order to ensure the safety of construction.
Fifth, erecting overhead pipeline operating surface must have reliable safety protection. Can take scaffolding must take scaffolding, pipe line is shorter can be full along the pipe line. Operation surface to ensure that there is 600mm wide, full of scaffolding boards, and set up 1.2m high two protective railings. Every 20m should be set up pedestrian ladder. Pipeline longer can be built in sections, build a section, construction of a section, construction is complete and then take the next section, if the pipeline is very long, scaffolding materials are scarce, can also be laid underneath the double horizontal safety net, take part of the scaffolding as an auxiliary safety protection measures.
In the roof under the frame, the canopy, wall ditch side installation of pipeline, there should be sufficient lighting, can build scaffolding must be built, can not be built in the pipeline below the laying of double horizontal safety nets, workers must hang up a good safety belt, horizontal safety nets should be wider than the outermost pipeline 1m or more, in order to ensure that the pipeline insulation work personnel safety.
Sixth, in the equipment, pipeline installation construction, for sporadic welding, repair, inspection and other points of operation of the safety protection can not be ignored, adhere to the safety protection is not allowed to carry out construction.
Seven, should be transported toxic, harmful, flammable media pipeline inspection wells, pipeline gas analysis, especially dead ends must be sampled and analyzed. If more than the allowable amount, then the exhaust measures should be taken, and after re-inspection of qualified before operation. Operators must wear personal protective equipment.