Road flood emergency plan

The following is a road flood emergency plan for you, hope it can help you. More road flood emergency plan please pay attention to the practical information column!

Road flood emergency plan a

A few days ago, "2014 Beijing transportation industry flood emergency plan" (hereinafter referred to as "emergency plan") announced, "emergency plan" requires strong rainfall set special people in the subway station entrance to pay close attention to the rain, depending on the situation to take measures quickly, set up waterproof boards, yards of waterproof sandbags, and other measures to prevent the rain from backing up the station.

Public **** transportation enterprises in the key time (morning and evening peaks), the key lines with sufficient capacity, equipped with a certain number of shift vehicles, open extra buses, adjust the operating time. Public transportation mountainous lines to ensure safety on the basis of taking measures such as stopping transportation, hair interval buses. Flood control personnel in the rainfall process on the area of responsibility for uninterrupted patrols, every hour to report a drainage operation site information.

"Emergency Plan" applies to municipal road facilities water damage rescue work, above the county level general highways, highways and rail transit existing facilities flood control and rescue work; responsible for organizing and coordinating the relevant implementation of municipal flood control materials transport vehicle reserves, mobilization, transportation work; to ensure safe operation of public **** traffic, maintenance of passenger and cargo transport market order, timely deployment of public **** traffic force evacuation due to the rainfall. Rainfall stranded passengers at train stations, airports; responsible for mountainous areas above the county level on general highways due to rainfall triggered by landslides blocking traffic rescue and disposal work.

Establishment of Beijing Municipal Transportation Commission Flood Control Command to increase the coordination of the command

This year's flood season, the Beijing Municipal Transportation Commission set up a flood control command, the Municipal Transportation Commission, Municipal Transportation Commission Road Politics Bureau, the Transportation Bureau, City Traffic Law Enforcement Corps, the Bus Group, the subway operating companies, the first group, the company, the public association, the company, the Beijing-Hong Kong Metro, etc. Beijing municipal transport industry 16 units of the main person in charge as a member of the command, responsible for organizing and coordinating the relevant departments to carry out municipal road facilities, water damage repair, highways, general roads above the county level, railroad crossings, rail transit existing facilities of flood control and rescue work, and supervise the implementation of emergency preventive measures. Organization and coordination of relevant departments to implement the municipal flood control and emergency supplies transport vehicle reserves, transfer, transport work; to ensure the safe operation of public **** traffic; maintenance of passenger and cargo transport market order, and supervise the implementation of emergency precautions.

"Emergency plan" is the original Beijing traffic industry flood emergency plan revision, the purpose is to further implement the flood control responsibility system, the implementation of flood rescue plan, the implementation of flood rescue team, the implementation of flood rescue materials, the implementation of flood rescue emergency capacity, the implementation of flood avoidance measures. The city's highways, county-level highways and bridges are safe and smooth during the flood season; the city's buses, long-distance buses, inter-provincial buses and boats are safe and secure during the flood season; and the city's railroads and railroads are safe and secure during the flood season.

Set blue, yellow, orange, red and other four warning levels

According to the level of danger, the Beijing transportation industry flood warning set blue, yellow, orange, red and other four levels, according to the different levels of warning to start the corresponding response procedures.

When the forecast for the next 6 hours of rain will reach more than 20 mm, 50 mm or less; or city roads, highways, county-level general highways began to accumulate water, the depth of water may be up to 20 centimeters, part of the overpass, the depth of water under the bridge may be up to 30 centimeters; or subway station plaza, the vehicle section of the car park depth of water may be up to 20 centimeters. That is to start the blue warning. Beijing Municipal Commission of Transportation Flood Control Command members of the unit and the protection of the unit leadership, personnel on duty, 24-hour duty, to ensure smooth communications; members of the unit rescue personnel, equipment, vehicles all in place on duty; members of the unit at any time to report the rain related work information, all types of wired, wireless communication equipment is open.

When the forecast for the next 6 hours of rain will reach more than 50 mm, or has reached more than 50 mm and rainfall may continue; or city roads, highways, county-level general highways began to accumulate water, the depth of water may reach more than 20 centimeters, 30 centimeters or less, part of the overpasses, bridges, under the depth of water may reach more than 30 centimeters, 50 centimeters or less; or subway hole berms may be partially destroyed, individual subway station entrances and exits may be water, resulting in the operation of the equipment may not be able to use normally; subway station square, the vehicle section of the yard water depth may reach more than 20 centimeters, 30 centimeters below.

That is the start of the yellow alert. On the basis of the blue warning response, to further strengthen the leadership on duty, the members of the unit to strengthen the inspection, found problems in a timely manner to organize and dispose of, timely report; according to the rainfall occurred in the region and rainfall trends, the City Transportation Commission Flood Control Command Office to check the relevant members of the unit leadership on duty in place, ask the real-time rain conditions and related work; bus, subway, railroads, and other public **** transportation sector to increase capacity investment, to Meet the public travel demand.

When the forecast for the next three hours of rain will reach more than 50 mm, or has reached more than 50 mm and rainfall may continue; or city roads, highways, county-level general highways began to accumulate water, the depth of water may reach more than 30 centimeters, 50 centimeters or less, part of the overpasses, bridges, under the depth of water may reach more than 50 centimeters, 100 centimeters or less; or subway openings Slope protection may be seriously damaged; a number of subway station entrances and exits may be water, resulting in the operation of the equipment can not be used; subway station plaza, the vehicle section of the yard water depth may be more than 30 centimeters, 50 centimeters or less. That is to start the orange warning.

On the basis of the yellow warning response, do a good job of organizing all aspects of the force to do a good job of water damage and emergency rescue and line rescue preparations, and make every effort to ensure that the city roads, highways, county-level general highways, bridges, safe and smooth, and make every effort to ensure the safe operation of existing rail transit facilities.

When the forecast for the next three hours of rain will reach more than 100 millimeters, or has reached more than 100 millimeters and rainfall may continue. Or city roads, highways, county-level or above general highway began to accumulate water, the depth of water may reach more than 50 centimeters, part of the overpass, under the bridge depth of water may reach more than 100 centimeters; or subway hole berm may be a serious collapse, the roadbed may be a serious collapse; many subway station entrances and exits may be serious water, resulting in the interruption of operations; subway station plaza, the vehicle section of the car park depth of water may reach 50 centimeters or more. That is to start the red warning. On the basis of the orange warning response, mobilizing industry-wide resources to respond, and further strengthen the efforts and strength of the input.

Strong rainfall set special people in the subway station to pay close attention to the rain

"Emergency Plan" requires that in the event of heavy rainfall, the units of the flood rescue team quickly in place, the organization to carry out flood rescue, and promptly report to the unit of the Flood Control Command on the scene. Units of flood control rescue team arrived at the scene of water damage, the first code put traffic guide signs to divert traffic, to avoid social vehicles into the scene of operation. The tunnel water damage from the tunnel entrance yard put traffic guide change sign.

The units of flood rescue rescue team in the water damage site construction, to protect the roadbed and bridge foundation from further damage; full consideration of the loss of soil bearing capacity caused by blisters; timely restoration and reinforcement of water-damaged slopes, retaining walls and other water-damaged facilities. Heavy rainfall, rail transit operators set up special people in the subway station entrance to pay close attention to the rain. Once the road is found to be waterlogged, rainwater may be poured into the station, we should quickly take measures to set up waterproof boards, yard waterproof sandbags. Public **** transportation enterprises in the key time (morning and evening peak), key lines with sufficient capacity, equipped with a certain number of spare vehicles, running overtime buses, timely adjustment of operating hours. Public transportation mountainous routes to ensure safety on the basis of taking measures such as stopping transportation, hair zone car.

Road flood emergency plan two

In order to effectively do a good job of my highway flood control work, fully prepared to do a big flood, big disaster, rescue big danger of war preparations, and in the case of sudden disasters can be efficiently and orderly implementation of flood control and rescue, flood damage to the highway damage to the minimum, to ensure the safety of the highway during the flood season, according to the "Chinese People's Republic of China *** and the State Flood Control Law" and other laws and regulations, combined with the Bureau of highway maintenance, the actual work plan has been developed. The actual, specially formulated this work plan.

One, the overall requirements

Strengthen the responsibility of flood control, strengthen the flood control measures, scientific command and control, to do a better job of highway flood control, to achieve ? Ensure that the flood season highway safety? The goal of the work.

Second, the organization and leadership

In order to strengthen the highway flood rescue work, the District Council set up a highway flood control leading group, the highway station set up responsible for the management of the highway flood control work of the corresponding organizational structure, and effectively do a good job to meet the flood of all the preparations to achieve the organization in place, the responsibility in place, the measures in place.

Third, the specific requirements

(a) each section, the highway station to stand on the highway property is highly responsible for the highway safety highly responsible for the highway, fully aware of the importance and urgency of the work of flood control, enhance the awareness of flooding, to overcome the paralysis and the sense of fluke, to maintain a high degree of vigilance, and to do a good job to prevent the big floods, flood resistance The first step is to prepare for the flooding.

(2) to effectively follow the subordinate to the superior, the local interests of the overall interests of the overall interests of the principle of solidarity and collaboration, once the flood, the units of the rescue team to unconditionally obey the leading group of the flood control work of the deployment to achieve unity of command, unity of action, and effectively the work of the flood control to catch dead, to catch the actual, to catch the results.

(C) always pay attention to the weather changes, keep abreast of the flood situation. Bureau of Flood Control Leading Group, according to the division of labor, adhere to the road inspection, found that the problem, timely processing, timely grasp of the flood situation, so that during the flood season on duty without empty posts, to ensure that the highway is safe and smooth. In the flood season, no duty personnel, no leadership on duty or inspection is not timely, delay the rescue time or cause big losses of the unit, the leaders and duty parties responsible.

(d) Flood control work to implement the executive in charge of the responsibility system, in the event of danger or received the task of the higher flood rescue, each section, the person in charge of the highway station and rescue teams should immediately go to the scene of the organization to direct and put into the rescue work, has occurred on the water-damaged sections and bridges, take timely emergency measures to organize the repair of the personnel to ensure that no accidents occur, to ensure that the highway is safe and smooth.

Four, make preparations for flood control materials

Seriously implement? Safety first, prevention first? The idea of saving for a rainy day, to prevent a disaster before it occurs, as soon as possible to set up a highway flood rescue team, at any time to deal with possible dangerous situations. In accordance with the requirements of flood control work and the actual situation, seriously prepare the flood control stone, sandbags, raincoats, shovels and other materials, so that machinery, personnel, vehicles and materials? Four implementation. Early preparation, early inspection, early prevention, to ensure that after the occurrence of water damage, emergency supplies can be in place in a timely manner, in order to repair the fastest speed through the car.

Five, comprehensive inspection, highlighting the key

1, pre-flood inspection, thoroughly remove hidden dangers, and improve the highway comprehensive flood control capacity. In the main flood comes half a month before the region's trunk highways, bridges, safety hazards inspection, found that the problem is dealt with in a timely manner, dangerous bridges, geological hazards along the hidden points, to investigate, take effective reinforcement repair measures, and do a good job of monitoring and early warning work, found dangerous, to take timely preventive measures. Do early discovery, early prevention, early treatment, and resolutely put an end to the occurrence of major accidents on all types of highways.

2, strengthen the road daily inspection work, attach great importance to the mountain highway flood control work, and unremitting. For the jurisdiction of the highway bridge culvert, permeable roadbed and mudflow, landslide, landslide, rockfall, subsidence sections and other road sections that jeopardize the safety of driving, to set up obvious warning signs. When water damage and other natural disasters occur, the implementation of 24-hour manned, crooked roadside trees affecting traffic should be dealt with in a timely manner to ensure that the normal passage of the road, the short time can not dredge the water damage to immediately organize the construction of temporary sidewalks, sidewalk bridges, and do everything possible to ensure that the safe passage of road transport.

3, grasp the key project construction site flood control work, in advance of the temporary facilities construction materials construction machinery and equipment, such as transfer to a safe area to ensure safe production, safe flood. Especially in the river section of the bridge construction project, to carry out a detailed flood control inspection, as soon as possible to move the construction workers to a safe section, and instructed the construction unit to develop a flood control plan and supervise the implementation of the project to ensure that the construction workers and material safety.

4, pay close attention to the weather changes, people listen to daily weather forecasts, timely grasp of the rain, flood conditions, make preparations in advance.

5, do a good job of publicity and reporting, and actively work closely with the radio, newspapers, television and other media, and actively create an atmosphere of public opinion of flood control, and strive for the support of the community and the people's spontaneous voluntary participation in the flood control and flood control labor. And in due course through the radio, television, newspapers and other news media to the community to release road blocking information.

Six, strict duty system and flood reporting system

Adhere to the duty and the leadership of the duty system, a hand responsible for all. During the flood season, 24-hour duty should be arranged day and night to ensure smooth communication. Duty personnel to maintain a high degree of vigilance, effectively take responsibility, in the event of larger floods, highway disruptions and major disasters, we must immediately report to higher levels, and to organize forces to repair the traffic as soon as possible. In accordance with the requirements of the Municipal Council of the strict flood season ten-day reporting system, the occurrence of special periods of flooding, in case of danger at any time to report.

Seven, the implementation of accountability

The duty officer should do their duty, stick to their posts, to ensure that the use of communication equipment is normal, the duty vehicle is running well, negligence of duty, retreat in case of danger, the country, the people caused by the loss of property and life should be held accountable for the responsibility of the relevant responsible person.

Road flood emergency plan three

The units, rooms, stations and road transport enterprises, stations, GPS monitoring center:

In order to effectively grasp the road transport during the flood season safety management at source, to ensure that road transport during the flood season the stability of the situation of production safety and due to unexpected factors caused by the backlog of passengers in a timely manner, according to the "Chinese People's Republic of China *** and the State of the flood control law", combined with the county road transport management practice, has developed an emergency flood control plan. The actual management of road transportation, especially the development of emergency flood control plan, and the implementation of the implementation.

One, the guiding ideology

In accordance with? Safety first, unremitting, prevention-oriented, all-out rescue? The principle of effective implementation of the flood control system of responsibility. Do responsibility in place, command in place, personnel in place, materials in place, measures in place, timely rescue, unified command, unified coordination, unified deployment, rapid response, scientific coping, graded implementation, to ensure that the flood season is safe and normal.

Second, the working principle

(a) adhere to the safety first.

(ii) adhere to the timeliness and effectiveness.

(C) adhere to the local management and hierarchical responsibility.

(d) Adhere to the prevention-oriented, early prediction and early disposal.

Three, the organization

In order to effectively grasp the source of the flood season safety management, the establishment of a flood control work leadership mechanism, clear responsibilities, to ensure that the county road transport safety flood, after the study set up the 2013 road transport flood emergency response headquarters, which consists of the following personnel:

The commander-in-chief: xx (Transportation Management)

Deputy commander-in-chief: xx (deputy director of transport management)

xx (assistant director of transport management)

Members: xx (director of transport management)

xx (director of maintenance and driving training)

xxx (director of safety and legal system)

xxx (director of the Logistics Center)

xxx (director of finance)

xxx (director of the logistics center)

xxx (director of the logistics center). (Director of Finance Unit)

xxx (Director of Office)

xxx (Director of Administrative Approval Unit)

xxx (Director of Office)

xxx (Director of Station Office)

xxx (Director of Youxi Station)

xxx (Director of Luodu Station)

xxx (Head of City Guest Office)

The Office of Flood Control and Emergency Response Headquarters is located in the Safety and Legal System Unit. Set up in the safety of the legal system unit, by Luo Xiaojun specifically responsible for the flood season safety management of road transportation sources.

Fourth, flood control supervision and duty arrangements

1, requirements:

(1) adhere to the main flood season 24-hour duty system, so that communication is open;

(2) duty personnel must be firmly at their posts, conscientiously do a good job of duty records and shift work, at any time at the beck and call;

(3) ) at any time to collect and report the flood situation.

2, the establishment of the flood supervision organization:

General Supervisor: xxx

First Supervisor: xxx

Members: xxx, xxx, xxx, xxx, xxx, the main investigation of the jurisdiction of Luodu.

The second inspection team leader: xxx

Members: xxx, xxx, xxx, xxx, xxx, xxx, the main investigation of the Youxi jurisdiction and various transportation enterprises.

3, the flood season source safety management office:

Set up in the safety of the legal system unit, xxx for the office director. Daily duty phone: xxx (fax phone), xxx, night xxx.

V. Yuechi County road transport capacity during the flood season to protect the plan

In order to do a good job in the flood season road transport capacity to ensure that the flood control work is carried out normally to protect the normal operation of the socio-economic and circulation of the market is relatively stable, to ensure the people's supply of daily necessities. The supply of daily necessities of the masses, according to the requirements of the relevant provincial and municipal documents, especially the development of road transportation capacity to protect the plan.

(a) organization

County Transportation Management set up a leading group of road transport capacity during the flood season to protect the work of the leading group, the main person in charge of the Xiong Neng for the group leader, deputy director Liu Yang, director of the assistant director of Yin Juan for the deputy leader of the transport management unit into the Hong, safety and legal system, Luo Xiaojun, head of the VMU into the comrades of the just, the leading group office is located in the Transportation Management Unit, Comrade Zhu Yi is responsible for the day-to-day work. Duty phone: 5032003.

(B) road transport capacity to protect the work of the agency

1, the organization of capacity reserves, is responsible for the flood season capacity organization and management. In accordance with the views of the leading group, the organization and deployment of transport vehicles and personnel to carry out rescue, disaster relief, as well as personnel distribution.

2, in accordance with the requirements and deployment of the City Transportation Management Office and the County Transportation Bureau, is responsible for the county's road transport capacity scheduling, and the implementation of the task of ensuring that the organization is responsible for the supervision.

3, is responsible for coordinating the investigation and resolution of problems arising from the implementation of emergency protection tasks.

4, report the results of the implementation of the emergency transport security tasks (the number of vehicles into the total tonnage (passenger), the implementation of the task time, operating points, lines and types of goods transported, the number of people gathered and dispersed and other circumstances).

(C) road transport security vehicles and personnel

1, during the flood control work, by the passenger company, Ange company, 43 teams, 84 teams, each of the five passenger vehicles, Haitian, Hongfa, Yinxin, Tongfa, Hongyu freight company each of the five freight vehicles in April 26 before the license plate, driver, telephone roster reported to the office of the Emergency Flood Control Command, as the flood control Emergency capacity, ready for deployment.

2, the county transport management road transport capacity to protect the work of the leading group office in accordance with the flood season duty system to implement 24-hour duty, and to maintain emergency transport security tasks with the assumption of business, vehicles and security personnel to establish contact, the implementation of contact information and contact telephone, to ensure that there is capacity for emergency protection.

3, emergency protection personnel must be driving skills, physical health, professionalism of the personnel as, aged between 23 and 50 years old.

(D) emergency protection capacity start the implementation of procedures

1, received the flood emergency protection leading group emergency capacity start order, first of all, accurately grasp the number of emergency capacity to enable the number of emergency vehicles, emergency vehicle type, assembly point and capacity handover and other related matters; second, notify the emergency capacity to protect the enterprise and the owner of the vehicle, and immediately start the flood emergency capacity protection work.

2, the implementation of emergency capacity to protect the task of the unit at the same time to send more than 5 vehicles to carry out the same task by the fleet leader to lead the team, more than 10 vehicles by the unit leader to lead the team, more than 20 vehicles by the Municipal Transportation Management Office to arrange for personnel to lead the team.

3, the implementation of the flood emergency protection work units, enterprises and owners must unconditionally implement the superior issued by the emergency transportation orders, the refusal to implement the order, negligence or shirking of responsibilities, will be held accountable for the responsibility of the relevant personnel.

(e) The duty officer should be clear about their duties, familiar with the relevant provisions, master the jurisdiction, the unit capacity to protect the reserves, in case of emergency to immediately report to the duty leader.

(F) the emergency transportation security tasks undertaken by the enterprise must be completed in the near future on the verification of emergency capacity, verification is completed, along with the determination of the emergency passenger transport capacity reported to the county for the record.

Road flood emergency plan IV

1 General

1.1 The purpose of the preparation

To mitigate the damage caused by flooding, to avoid and reduce casualties to the maximum extent possible, the scientific implementation of the flood control scheduling, rescue and relief, planned and prepared defense against flooding, to protect the social and economic development.

1.2 Basic Principles

Firmly implement the Office of the administrative hand responsible system; prevention-oriented, combined with prevention and rescue; comprehensive deployment, to ensure that the focus; unified command, unified scheduling; a combination of engineering and non-engineering measures; as far as possible to mobilize all the positive factors of the whole society, united against floods.

1.3 Preparation of the basis

According to the "People's Republic of China *** and the State Flood Control Law", "People's Republic of China *** and the State Flood Control Regulations" and the State Flood Control Office of the preparation of the "urban flood plan outline and related laws and regulations, combined with the actual street, the development of this plan.

1.4 Scope of adaptation

This program applies to the communities within the scope of the street, the jurisdiction of the enterprise units flood accident.

2 Organizational Structure and Responsibilities

2.1 Organizational Structure

The establishment of Hongqi Road Street Office Flood Prevention and Flood Control Command (hereinafter referred to as the Command)

The members are as follows:

General Commander:xxx

Deputy General Commander xxx xxx xxx xxx xxx

Members: xxx, xxx, xxx

Command set up an office, the office is located in the Office of Safety Supervision, Office Director: xxx. under the unified command of the Command, the establishment of communication and liaison group, medical assistance group, logistical and material support group, safety and security group, emergency rescue group of five emergency response team.

2.2 Duties

2.2.1 Street flood control headquarters main responsibilities

(1) in the district flood control headquarters and the street under the leadership of the CPC Working Committee and the Office, the implementation of the national flood control regulations, policies and the Flood Control Command's decisions, directives, and the Street CPC Working Committee, the Office of the flood control disaster relief orders, issued Start the plan order, command the relevant departments to respond to the emergency.

(2) according to the disaster on the flood control and flood prevention emergency plan to put forward the argument, leadership, deployment, coordination of disaster emergency response, deployment and organization of the constituent departments of the implementation of the flood and disaster relief work, the implementation of the party committee and the government of the other tasks assigned, the development and revision of the "Street Flood Control and Flood Prevention and Emergency Response Plan".

(3) when the jurisdiction of a major flood disaster, the organization held an emergency meeting on flood prevention and flood control work, listen to the relevant communities and units of rain, water, disaster reports, arrangements for the deployment of flood relief work.

(4) unified command of the whole street flood control emergency work, the organization of the Office of the relevant departments in accordance with the provisions of this plan responsibilities of the flood relief in the affected areas.

(5) to the district people's government and the district flood control headquarters to report on the flood disaster and flood relief emergency work.

2.2.2 Street flood control and flood control headquarters office main responsibilities

(1) implementation of national regulations on flood control, guidelines, policies, implementation of street flood control and flood control headquarters of the decision-making and scheduling instructions of the higher flood control headquarters.

(2) grasp the flood situation, disaster conditions, if necessary, issued flood forecasts and warnings and flood communiqués, and prepare reports on disasters and rescue and relief situations.

(3) is responsible for coordinating, checking and supervising the flood control work of all levels and relevant departments within the jurisdiction.

(4) Organization of the development of flood defense programs, inspection and supervision of the implementation of various flood control and flood relief measures.

(5) to assist in the organization of flood control rescue teams, the organization of flood control information system construction. Supervise, check and implement the reserves of relevant flood control materials.

(6) to complete the street flood control and flood control headquarters assigned other work.

2.2.3 Duties of the emergency response team

(1) communication and liaison group: xxx is responsible for internal and external communication and liaison, keep in touch at all times. Once the flood accident, immediately contact the relevant departments for rescue, while reporting to the higher authorities.

(2) emergency rescue group: xxx is responsible for the urban flood prevention and flood control work of publicity mapping, emergency rescue and personnel transfer work. Responsible for the scene of emergency rescue, to ensure that the emergency team at any time are in a state of readiness, rescue vehicles and equipment running well. Once the flood disaster accident, to ensure that personnel, equipment in place in a timely manner, rescue in time; flooding occurred in the community responsible person should immediately organize the emergency evacuation of people in the affected area to ensure the safety of people and livestock.

(3) logistics and material security group: xxx is responsible for, in accordance with the requirements of the street flood control and flood control headquarters is responsible for flood control materials reserves, management, supply work.

(4) medical assistance group: xxx is responsible for the first time after the disaster rushed to the scene to develop rescue programs, rescue the injured, and coordination of hospitals on the injured in a timely manner.

(5) safety and security group: xxx is responsible for the maintenance of flood rescue public **** order, transportation, road control and social security in the disaster area. Emergency situations, coordinate with the relevant departments to organize the evacuation and transfer of the masses; to combat the theft of state and residential property and flood relief materials, destruction of flood control projects, flood control communication facilities of criminals; to do a good job of flood relief of the public security and defense work.

2.3 communities, street areas of enterprises and institutions of the flood control command structure

communities, areas of enterprises and institutions to establish and improve the corresponding flood control command structure, the flood control work is responsible for the decomposition of the groups, must be in the street party committee and the Office of Flood Control Command under the leadership of the unity of each division, each responsible for its own responsibility, close cooperation, and to do a good job in the area, the unit Flood prevention and rescue work.

2.4 Flood duty system

The community, the jurisdiction of the enterprises and institutions to arrange flood duty personnel, the strict implementation of the 24-hour duty system, to maintain smooth communication, is strictly prohibited duty personnel off duty.

3 flood forecast and early warning and material preparation

3.1 forecast and early warning

Command office according to the Meteorological Bureau issued rainfall forecast for early warning: the occurrence of one in fifty years of flooding (24 hours of rainfall amounted to 193.5 millimeters), or the occurrence of one in a hundred years of flooding (24 hours of rainfall amounted to 222 (24-hour rainfall of 222 millimeters), start the emergency plan, immediately organize the relevant departments and units to do a good job in the flooded area of people, property transfer and rescue and relief work. To the higher flood control headquarters to report the disaster and rescue work progress.

3.2 Disaster Reporting

Disaster information should mainly include: the time of the disaster, location, scope, affected population and the loss of mass property, transportation, post and telecommunications, water and electricity facilities. The casualties and large property losses of the disaster organization to verify, should be immediately reported, to provide an accurate basis for disaster relief.

3.3 Material Preparation

Flood control and rescue materials need to be stocked: rain shoes, raincoats, woven bags, shovels, lighting equipment, life-saving equipment, transportation tools and so on.

3.4 Transportation vehicle arrangements

Randomly selected by the logistics and material support team.

3.5 Medical and health epidemiological

Medical and pharmaceutical supplies are the responsibility of the street community health center. The doctors and nurses who are physically fit, highly qualified and experienced are drawn to take part in the emergency rescue, while all efforts are made to monitor and disinfect to prevent the occurrence of various epidemic diseases.

4 publicity, training and exercises

4.1 Public education

By the communities to take the issuance of publicity materials and other measures to carry out public defense against flooding, safety self-help, obey the unified arrangement of publicity and education.

4.2 Training and drills

By the Street Armed Forces Department is responsible for emergency rescue teams and related staff training, improve the rescue capacity; organized once a year emergency rescue drills, to ensure that the plan is activated, the personnel in place, materials in place, rescue in a timely and orderly manner.

5 rewards and punishments

5.1 Rewards

The advanced collectives and advanced individuals who have made outstanding contributions to the work of flood rescue and relief are recognized and rewarded.

5.2 Punishment

For negligence in flood rescue and relief work, desertion, refusal to carry out the rescue and relief orders of the relevant personnel, according to law to pursue responsibility.

6 Bylaws