The Modern Medical Center of Suihua No.1 Hospital is located at the intersection of Beilin Street and Qingfeng Street. It is a major project of Suihua City, which is highly regarded and loved by the municipal party committee, municipal government and the people of the city. 2004 September by the Suihua Municipal Development and Reform Commission set up the project, and the construction was officially started on August 1, 2005, and was completed and put into use on September 1, 2008, which is the first time that Suihua City Hospital Modern Medical Center has been put into use. Suihua First Hospital Modern Medical Center has a building area of 53,900 square meters, with 15 floors, 1 underground and 14 above ground. The first basement floor has a construction area of 10,000 square meters and is equipped with a parking lot, a staff restaurant, an electrical substation, a laundry room, a supply room, a radiotherapy center, a gas supply center, and a material storehouse. On the first floor, there are DSA consultation area, registration and cashier, pharmacy, emergency department, comprehensive oncology department, CT, MRI, and hospitalization and discharge center. On the second floor, there are internal medicine clinic, obstetrics and gynecology clinic, ultrasonography, cavity center, function department, test center, and radiology department. On the third floor, there are ophthalmology consultation area, oral cavity, ear, nose and throat consultation area, surgical consultation area, central operating room, pathology, blood transfusion, outpatient operating room, central ICU. 22 clinical departments are located above the fourth floor, including internal medicine, surgery, obstetrics and gynecology, ophthalmology and gynecology, pentacameral medicine, VIP wards and so on, with 36 beds in each ward, and the building **** has 844 beds.
The horizontal traffic of the building adopts the sunshine hall as the center of the "T" type hospital street, which distinguishes the outpatient clinic from the medical technology and maximizes the convenience of patients to meet the medical process. The podium before the hospital street is the outpatient clinic area, and the first, second and third floors of the main building at the back of the hospital street are the medical examination rooms. The main building adopts 8 elevators as the main traffic path, together with 3 walking stairs for vertical traffic. The third floor podium adopts 2 sightseeing ladders, 3 vertical lifts, 4 escalators and with the walking stairs for vertical transportation, and the passageway is set up with eye-catching slogans to guide patients to medical treatment.
The hospital adopts LAN for medical management. Patient access to medical care will be implemented one-card service, the building gradually implement laboratory systems, imaging systems, office automation, etc., built-in cable television system, broadband network system, telephone system, security monitoring system and LED electronic screen system. Office furniture, ward supplies, medical equipment, etc. are all new purchases.
The building is a first-class seismic design, adopting drilled slurry pile foundation, and the main body adopts frame shear wall structure, and the seismic grade is 8-level seismic. The fire fighting in the building adopts fire hydrant and automatic alarm sprinkler system. It is intelligently controlled by the fire control center. The exterior walls of the building are all made of steel-hung stone walls, which are natural, beautiful, strong and durable. The outpatient clinic and the middle area of the front of the main building adopt glass curtain wall structure, embellished with exterior stone. The roof shape adopts aluminum veneer curved outward flip design, reflecting the vase-like beauty of the building. Contained within the building body lighting strip to make the building more bright and dazzling at night. Building in the function of the main highlights its modern, spacious, bright, comfortable, convenient features, patient-centered service concept.
The hospital's modern medical center has 1,000 employees, 884 professional and technical staff, and 116 logistics and other service personnel. There are 22 clinical departments such as cardiovascular, respiratory, digestive, neurological, nephrology, hematology, endocrinology, diabetes, general surgery, cerebral surgery, thoracic surgery, orthopedic surgery, urology, gynecology and obstetrics, orofacial, head and neck and maxillofacial surgery, anesthesia, and the central operating room, as well as 12 medical and technical departments such as functional, ultrasound, radiology, CT, MRI, DSA, and EEG, etc. There are more than 350 pieces of 16 rows of helical CTs and large-sized medical instruments and equipment, such as 1.6T MRI **** vibration, and so on. More than 350 pieces of instruments and equipment. With the modern medical center put into use, the hospital group management, "one hospital, two districts" construction pattern has been formed, the hospital staff in the hospital under the leadership of the party committee is moving towards the construction of Hassui North technologically advanced management of scientific modern medical centers, to achieve the "service hotel, environmental gardening, information network", the regional scope of the modern medical center, and to realize the "service hotel, environmental garden, information network". ", the regional scope of the "largest, most functional, the strongest technology, the best service, the most beautiful environment, the best benefits" goal stride forward.