Chongqing water conservancy hub and water transfer project

Chongqing Wanzhou District Water Conservancy Transmission Hub and Water Transportation Earthwork Project,, the project cost of about 65 billion yuan, 200 million cubic meters of earth and stone, divided into two sections, prepayment of about 5%, according to the 8-year construction period divided into eight annual volume of work drawn, with construction qualifications (single network level) and China Railway Bureau signed a cooperation agreement, according to the payment of the two bond, to the project department of China Railway Bureau signed the contract execution price of about 142.yuan / cubic meter, the distance between 0 to 30 Kilometers, digging depth of 73 meters, excavation width of about 830 meters, may not be blasting, retaining wall, pumping, according to the agreement responsibility for the division of taxes, management fees, comprehensive downward fluctuations in the project department of China Railway Bureau of 4 yuan to the public, the leadership of the leadership of the 5 yuan and above the 2 yuan a party, intermediary 3 yuan withholding and payment. Executive price of 128 yuan / cubic meters have a right-of-way and the provisional construction of She Shi Fei An inspection qualified, the first month to end 90%, the second month to end 100% of the complete information in the original China Railway Bureau Wanzhou District Project Department Office to see read. Corresponding good reputation, the company leader good character, abide by the rules, the company's economic and technical strength of first-class construction with labor qualifications, registered capital received in place of more than 500 million yuan, a bureau audit for the record, the company on the soil machine) a bureau for the record, the signing of the company with a card card verification. The above contract conditions, such as fine-tuning to both sides of the contract shall prevail. Because of the epidemic again delayed into the field, the start of construction time temporarily in early April. Take a look at this project, China Railway Bureau won the bid, the project is true, the relationship in place. The first to send their own use of a single network of first-class qualification, water conservancy and hydropower senior engineer, senior will, the signatory's ID card copy (double-sided), title certificate (scanned), health certificate (in March), personal credit (in March) to send over the audit through the Bureau of China Railway to send a letter of invitation to come over to deal with the direct China Railway Command Bureau. Let them Wanzhou engineering qualifications and personnel information reported over. Want to do I send a notice of award, start order, notice of entry and construction project construction license to him to see!