Construction design fee charging standard is how to

China's civil construction engineering design fees

Charges

1. engineering design fees: generally include preliminary design and budget estimates, construction design, according to the contract with the construction, the design of technical proposals, to participate in the commissioning and acceptance of the completion of the project and other work costs. This fee does not include the cost of doing construction budget.

2. Preliminary design before the work of fees: is the preparation of feasibility study reports, on behalf of the design task book, to participate in site selection and planning, environmental pre-evaluation and other work required fees.

3. Non-standard equipment design fees: refers to the design of non-stereotyped equipment. Some of the industry engineering design itself, including equipment design, not another non-standard equipment design fees.

4. Software preparation costs: refers to the factory production process computer control programs and other preparation costs. There is no industry standard, according to the value of the software, the degree of sophistication, and take into account the actual workload of the preparation of software agreed by the two sides.

Two, charges

1, only commissioned to do the preliminary design or construction drawings design, according to the industry division of the design workload of the proportion of each and multiplied by the coefficient of 1.1 to calculate the charges. If the preparation of construction drawing budget is added, the fee will be calculated by multiplying 1.1 coefficient according to the engineering design fee standard.

2, engineering design using standard design (except for standard component drawings), reuse design, according to the same type of new design projects, 20% of the charges.

3, engineering and technical consulting services, to participate in planning surveys, inquiries, quotations, external negotiations and other technical services, as well as not formulated a specific fee for the work, can be used to calculate the fee according to the direct production of man-days, the fee for each man-day 85 yuan. Calculation of man-days can be carried out on the basis of man-days quota or negotiated between the designer and the commissioner at the time of signing the contract according to the task. Need to travel to the outskirts of the task, the duration of the task within sixty days, the travel costs borne by the commissioning unit. When the engineering design unit goes abroad due to the needs of the task undertaken, all other expenses (including foreign exchange amount) for going abroad shall be paid by the commissioning unit, except for the cost of fabrication, which shall be paid by the design unit.

4, this charge takes into account a variety of factors affecting the design workload adjustment factor, if more than two factors in the same project at the same time, by the total adjustment factor for the project shall be the sum of the individual adjustment factor after the decimal point of the number of figures and then add 1, but the total adjustment factor shall not be greater than the maximum value of 1.5.

5, according to the physical or working day quota of the design fee, where the Investment in more than 300 million yuan of projects, the maximum fee shall not be greater than 1.5% of the proportion of the proposed budget.

6, engineering design units in the design of advanced technology, and better economic efficiency, confirmed by the design review, can be higher competent review department decided to increase the design fee appropriately, generally controlled within 10% of the design fee. If the design quality and technical level fail to meet the contract requirements, the design fee shall be deducted according to the contract.

7. The design fee shall be allocated in installments according to the design progress. After the design contract comes into effect, the commissioning party shall pay twenty percent of the design fee to the design unit in advance as a deposit; thirty percent after the completion of the preliminary design; fifty percent after the completion of the construction drawings. According to the "construction engineering survey and design contract regulations", design contract fulfillment, deposit against the design fee. After the design fee is paid, the design unit of the design task of the construction project should be coordinated with the construction, to participate in the test test and acceptance of the completion of the project, etc., should not be charged for technical services and travel expenses.

8, this fee is not included in the project, the design fee by the design unit and the commissioning unit with reference to the fee negotiated. Foreign-funded and Sino-foreign joint venture construction project design fees, can refer to the relevant foreign design fees, the design and commissioning party **** with the negotiation to determine.

9, the need for a separate architectural design program, special, first-class engineering architectural design program plus 10% of the project design fee; second-class engineering architectural design program plus 6% of the project design fee; third-class engineering architectural design program plus 3% of the project design fee; the fourth level (including the fourth level) of the project does not charge a separate architectural design fee. Civil building engineering grade table "large" generally refers to more than 10,000 square meters of buildings; "medium" refers to 3,000 ~ 10,000 square meters of buildings; "small" refers to less than 3,000 square meters of buildings. Building.

10, the charges include the corresponding general fire protection system and building decoration design charges, if there are special requirements to be negotiated. Specialized decorative design of existing buildings, depending on the complexity of the decorative design, according to the decorative cost of 3-5% of the charge.

11, the charges are based on a single project as the basic unit, excluding gas, water, purification, sewage treatment, roads and bridges, boiler houses, gas stations, power substations, pump houses, cooling towers, chimneys and other single buildings and structures, the charges should be in accordance with the standards of municipal and other industries, respectively.

12, only do the preliminary design of civil buildings or construction drawings phased design, the proportion of its workload is 40% and 60%.

Engineering survey and design fee regulations

State Planning Commission, Ministry of Construction

State Planning Commission, Ministry of Construction on the issuance of the "Engineering Survey and Design Fee Regulations" notice

Price [2002] No. 10

Related departments of the State Council, the planning commission of the provinces, autonomous regions and municipalities, the price bureau, the Department of Construction:

In order to implement the "State Council General Office", the "State Council General Office of the State Council", the State Council General Office of the State Council, the State Council General Office of Planning Commission, the State Council General Office of Construction:

In order to implement the "General Office of the State Council forwarded to the Ministry of Construction and other departments on the engineering survey and design units of the institutional reform of a number of opinions of the notice" (State Council [1999] No. 101), to adjust the engineering survey and design fees, standardize the behavior of the engineering survey and design fees, the State Planning Commission, the Ministry of Construction formulated the "Engineering Survey and Design Fees Regulations" (hereinafter referred to as the "Provisions") are hereby promulgated and shall come into force from March 1, 2002 onwards. The former State Price Bureau, the Ministry of Construction issued the "on the release of engineering survey and engineering design charges notice" ([1992] Price and Fees No. 375) and the relevant annexes are repealed at the same time.

Prior to the implementation of the Regulations, has completed the construction project engineering survey or engineering design contract workload of more than 50%, the survey and design charges are still in accordance with the original contract; has completed the engineering survey or engineering design contract workload of less than 50%, the uncompleted portion of the survey and design charges shall be negotiated by the contractor and the surveyor, the designer with reference to the provisions of this negotiation.

Attachment: Engineering Survey and Design Charges Regulations

Attachment:

Engineering Survey and Design Charges Regulations

Article 1 In order to regulate the behavior of engineering survey and design charges, and to safeguard the lawful rights and interests of the Contractor and the surveyor and the designer, the Provisions and Engineering Survey Charges Standards and Engineering Survey Charges Regulations are formulated in accordance with the "People's Republic of China*** and the State Prices Act" as well as the relevant laws and regulations. Standard for Engineering Survey Charges" and "Standard for Engineering Design Charges".

Article 2 These Regulations and the Standard for Engineering Survey Charges and the Standard for Engineering Design Charges shall apply to the charges for engineering survey and engineering design of construction projects within the territory of the People's Republic of China.

Article 3 The contracting and contracting of engineering survey and design shall follow the principles of openness, fairness, impartiality, voluntariness and honesty and credit. According to the "Chinese people's *** and the state bidding law" and "construction project survey and design regulations", the contractor has the right to independently select the surveyor, designer, surveyor, designer independently decide whether to accept the commission.

Article 4 The contractor and the surveyor, designer shall comply with the provisions of the relevant state price laws and regulations, maintain normal price order, and accept the supervision and management of the competent government departments in charge of prices.

Article 5 engineering survey and engineering design fees according to the different investment in construction projects, respectively, the implementation of government guidance and market-adjusted prices. Construction projects with a total estimated investment of 5 million yuan and above, engineering survey and engineering design fees to implement government guidance; construction projects with a total estimated investment of 5 million yuan or less, engineering survey and engineering design fees to implement market-adjusted prices.

Article 6 of the implementation of government-guided price of engineering investigation and engineering design charges, the base price calculated in accordance with the "Engineering Investigation Charges" or "Engineering Design Charges", in addition to Article 7 of the present provisions of the other provisions of the range of fluctuation of 20% up and down. The contractor and the surveyor, the designer should be based on the actual situation of the construction project in the specified floating range of negotiation to determine the amount of charges.

The implementation of market-adjusted price of engineering survey and engineering design fees, the contractor and the surveyor, the designer to negotiate the amount of fees.

Article 7 engineering investigation and engineering design fees, shall reflect the principle of quality and price. Engineering survey and engineering design fees for the implementation of government-guided price, where in the engineering survey and design of new technologies, new techniques, new equipment, new materials, conducive to improving the economic, environmental and social benefits of the construction project, the contractor and the surveyor, the designer can be negotiated to determine the amount of fees within the range of 25%.

Article 8 The surveyor and designer shall, in accordance with the Provisions on the Implementation of Marking Prices for Commodities and Services, inform the contractor of the relevant service items, service contents, service quality, basis for charging, and charging standards.

Article 9 The amount of the engineering survey fee and the engineering design fee, as well as the method of payment, shall be agreed upon by the contractor, the surveyor and the designer in the Engineering Survey Contract or the Engineering Design Contract.

Article 10 The survey documents or design documents provided by the surveyor or designer shall conform to the engineering and technical quality standards stipulated by the State and meet the content, quality and other requirements agreed in the contract.

Article 11 If the workload of engineering survey and engineering design increases or if the engineering survey site is suspended or the work is not carried out due to reasons of the contractor, the contractor shall pay to the surveyor or designer the corresponding engineering survey fee or engineering design fee.

Article 12 of the engineering survey or engineering design quality does not meet the provisions of article 10, the surveyor or designer shall rework. Due to rework increased workload, the contractor does not pay the engineering survey or engineering design fees. Due to the surveyor or designer work errors to the contractor caused economic loss, shall bear the liability in accordance with the contract.

Article 13 The surveyor or designer shall not deceive the contractor or collude with the contractor to overcharge the engineering survey fee or engineering design fee by increasing the amount of engineering survey work or raising the engineering design standard.

Article XIV violation of the provisions of this regulation and the state's relevant price laws and regulations, by the competent government departments in charge of prices in accordance with the "Chinese People's **** and the State Price Law", "price violations of the provisions of the administrative penalties" shall be punished.

Article 15 These Provisions and the attached "Engineering Survey Charges" and "Engineering Design Charges" shall be interpreted by the State Development Planning Commission.

Article XVI of the provisions of this March 1, 2002 shall come into force.

Engineering Survey Charges