Feasibility report

Feasibility report is a company to start a project before the project to be investigated, the study of the report written after the instrument! The following is a: feasibility report template, do not know how to write a feasibility report friends can refer to Oh!

Feasibility report template 1

Chapter 1 Project General

General as the first chapter of the feasibility study report, to synthesize the description of the study report in the chapters of the main issues and conclusions of the study and the feasibility of the project with or without the final recommendations for the approval of the feasibility study to provide convenience.

General chapter can be based on the specific conditions of the project, with reference to the following content.

Project Background

?1.1.1 Project Name

The full name of the enterprise or project should be the same as the name listed in the project proposal.

The contractor refers to the unit responsible for the preparation of the project, and the full name of the unit and the general director should be indicated.

?1.1.3 Project authority

Note the authority to which the project belongs.

Or the name of the group or company to which it belongs.

Sino-foreign joint venture projects should indicate the department to which the investing parties belong.

The name and address of the group or company and the name and nationality of the legal representative.

?1.1.4 The proposed project area, location

?1.1.5 Undertake feasibility study of the unit and legal representative

If a number of units collaborate to undertake feasibility studies of the project, should indicate the name of the unit and its responsible for the name of the project, the overall responsible unit and person in charge.

Such as feasibility studies with foreign consulting organizations to cooperate in the project, the research work should be undertaken by the Chinese and foreign parties in the name of the unit, the legal representative, as well as the undertaking of the project, the division of labor and collaborative relationships, etc., respectively.

?1.1.6 Basis for the study

In the feasibility study as the basis for the regulations, documents, information, to list the name, source, date of release.

And the necessary part of the full text is attached as an annex to the feasibility study report, these regulations, documents, information can be broadly divided into four parts:

(1) the project authorities of the construction of the project requirements issued by the directive documents; the project contractor or the feasibility of the unit's request for the report of the approval of the document.

(2) The feasibility study has been formed before the start of the work and documents.

(3) National and proposed region's industrial construction policies, decrees and regulations.

(4) Design basic information investigated and collected according to the needs of the project.

?1.1.7 Overview of the study

(1) The need for the project construction.

Briefly explain the status of the project in the industry, whether the project is in line with national industrial policy, technology policy, productivity layout requirements; the reasons for the proposed construction of the project and the importance.

(2) Project development and feasibility study work concept.

Description of the project and the progress of the feasibility study overview, including the preferred principles of technical solutions, site selection principles and results, the preparation of the environmental impact report, the preparation and progress of foreign work, etc., require a brief description.

In the feasibility study, the project's product sales, supply of raw materials, production scale, plant site technology program, total funding and financing, the project's financial benefits and national economy, social benefits and other major issues, should reach a clear conclusion, this section needs to be a brief description of the conclusions of the relevant sections of the study, and to present the final conclusions.

(1) A brief analysis of market demand.

(2) Planned sales volume, sales direction.

(3) Product pricing and sales revenue forecast.

(4) Proposed scale of the project.

(5) Main products and by-products varieties and production.

(1) Quantity, specifications, quality and sources of major raw materials, fuels, major auxiliary materials and power required for the project after commissioning.

(2) The names, specifications, requirements and sources of major industrial products and semi-finished products.

(3) Names, specifications, annual consumption, sources and necessity of imported raw materials and industrial products.

(1) Geographical location, area and necessity

(2) Water sources and conditions of water intake.

(3) Wastewater, waste disposal conditions.

(1) The scope of the project, i.e., the content of the main production facilities, auxiliary facilities, public works, and living facilities.

(2) Production methods and process technology adopted.

(3) The source of the main equipment, such as the need to introduce foreign countries, a brief description of the introduction of the country, technical characteristics, models and so on.

(1) The types and quantities of pollutants emitted, and whether they meet the national emission standards.

(2) The main treatment facilities and investment.

(1) Factory organization and labor system.

(2) The total staffing of the plant and the need for various types of personnel.

(3) The source of labor.

(1) Total investment required for the project.

The total amount of investment in fixed assets and working capital required for the project, and listed by RMB and foreign currency respectively.

(2) Source of funds.

Loan amount, loan interest rate, repayment terms.

Joint venture projects should be listed separately in the Chinese and foreign parties, investment amount, investment mode and investment direction.

Feasibility Study Report 2

_________ Engineering Feasibility Study Report Preamble (introducing the basic situation of the project) Main text (from the economic, political, geographic, humanities and other aspects of the project to demonstrate the advantages, shortcomings, problems, etc.) Conclusions and recommendations (write the feasibility of the project for the reason that the existence of problems and countermeasures, etc.) Annexes (Countermeasures to problems, etc.) Annex 1: Sub-report Annex 2: Pictures Annex 3: References _______ Engineering Feasibility Study Report Team Leader: Month and Year

Key Points of the Instrument

(1) Basics of Feasibility Study Report

Feasibility study report is a feasibility study report that is conducted prior to the formulation of a particular construction or scientific research project to assess the possibility of the implementation of the project, the effectiveness of the project, Technical program and technical policy for specific, in-depth, detailed technical demonstration and economic evaluation, in order to determine a technically reasonable, economically cost-effective optimal program and the best time to write a written report.

Feasibility study report has no fixed format, according to the content of the study to determine the form.

Generally speaking, the main framework structure should include cover, abstract, table of contents, table of contents of charts and graphs, glossary, preface, text, conclusions and recommendations, references and annexes to the ten parts.

The cover of the feasibility study report, there is no fixed requirements, but the project name, reporting unit, report time and other content is indispensable.

Among them, the abstract, table of contents, table of contents of charts and graphs, glossary, references and annexes can be selected according to the report's 'needs.

The preamble generally includes the project's origin, purpose, scope, and the project's undertakers and reporters, the feasibility study of the brief and so on.

(2) the main content of the feasibility study report

The basic content of the feasibility study report is the content of the body of the report to be reflected.

It is the basis on which conclusions and recommendations are made.

Requirements for a comprehensive, systematic analysis as the main method, economic efficiency as the core, around the various factors affecting the project, the use of a large amount of data to demonstrate whether the proposed project is feasible.

When the feasibility study of the project to complete all the systematic analysis, the entire feasibility study should be put forward a comprehensive analysis and evaluation, pointing out the advantages and disadvantages and recommendations.

In order to conclude the need, it is often necessary to add some attachments, such as test data, argumentative materials, calculation charts, attached charts, etc., in order to enhance the persuasive power of the feasibility report.

The feasibility study report is generally composed of a general theory and several topics.

First, the general theory.

The general theory that the basic situation of the project.

In the preparation of the feasibility study report, this part is particularly important, the project's approval, loan applications, the main attraction of cooperation with this part.

The contents of the general theory generally include the background of the project, the history of the project, the project outline and the project contractor in four areas.

The essence of the general statement is to give a concise overview of the project and describe the image and thoughts of the project organizer accordingly.

In many cases, the success or failure of a project in terms of appraisal, approval, lending, and attraction of partners depends in part on the quality of the writing of the general statement.

Therefore, the writing must be done with due diligence to ensure that the content of the general theory is complete and focused, but also pay attention to the content with the latter.

Second, the study of basic issues.

Feasibility study report on the basic issues of the study, is a summary of the various thematic studies, unity and balance of the more principle, more systematic overview.

The project is different, the content of the basic problem study is different.

At present, there are three more representative: the basic issues of industrial projects, the basic issues of technology introduction project research and basic issues of technical and economic policy research.

Among them, the first aspect of the new industrial projects is market research, focusing on solving the necessity of the new project; the second aspect of the process research, focusing on solving the technical possibilities; the third aspect of the economic benefits of the research, focusing on solving the rationality of the project.

In the specific writing process, people often divide these three issues into ten topics to write.

These ten topics are: market situation and enterprise scale; resources and raw materials and collaboration conditions; site selection program; project technology program; environmental protection program; factory management and staff program; project implementation plan and progress program; financing; economic evaluation; conclusion.

Special tips

The requirements for the writing of feasibility studies mainly include the following four aspects:

(1) design program.

The main task of the feasibility study report is to demonstrate the pre-designed program, so it is necessary to design the research program in order to clarify the object of the study.

(2) the content is true.

The content of the feasibility study report and the data reflecting the situation must be absolutely true and reliable, without any bias and error.

The information and data used in the feasibility study report should be repeatedly verified to ensure the authenticity of the content.

(3) Accurate forecasting.

The feasibility study is a pre-investment decision-making activity.

It is a study before the event has not occurred, and it is an estimate of the future development of things, the problems that may be encountered and the results, and it is predictive.

Therefore, it is necessary to carry out in-depth research, full possession of information, the use of realistic forecasting methods, scientifically predict the future prospects.

(4) argumentation.

Argumentative is a significant feature of the feasibility study.

To make it argumentative, it must be done using a systematic approach to analysis, around the various factors affecting the project for a comprehensive and systematic analysis, both for macro analysis, but also for micro analysis.