1. Pipeline installation. The installation of pipe flanges, welding and other connecting parts shall comply with the provisions of the installation site and design scheme, and shall not be close to the wall surface and pipe supports. The orientation of the house shall be effective, which is convenient for maintenance in the middle and later stages. The slope flow and inclination of pipeline installation should also comply with the provisions of the design scheme.
2. Equipment unpacking, inventory inspection and reference point setting. After the water treatment equipment arrives at the installation site, it is necessary to ensure that the equipment is intact, and all parts in the box should be checked and counted with the packing list one by one. All parts should have technical documents, such as certificates of conformity and any engineering drawings. Measuring unreeling should be completed by technical professionals, and appropriate reference points should be set for the instruments and equipment used in measurement within the time limit of metrological verification cycle.
3. The installation of the equipment shall conform to the relevant requirements of the equipment design scheme and technical documents.
4. Installation of centrifugal fan and pump. Firstly, the centrifugal fan and pump shell should be measured and adjusted, and the suitable parts should be determined, which is beneficial to the practical operation and application in the middle and late stage.
The whole set of steps, it can be said that water treatment equipment can be considered as a project construction, and the foundation of water treatment equipment should be stable and reliable when the work ends naturally, and the relative anti-corrosion work should be done well.